Amend_002_Project_Drawings.pdf
PDF 36 MB Posted
- Attached to
- Construct VT Hanlon Substation, Stage 01, in South Dakota Federal contract opportunity
- Solicitation number
- DE-SOL-0007930
About this file
Revised and additional drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_003.pdf | ||
| VH_Contractor_and_internal_questions_and_answers.docx | DOCX document | |
| Amend_002_Bidding_Schedule.pdf | ||
| Amend_002_Project_Specifications.pdf | ||
| Amend_002_SF30.pdf | ||
| 21._Amendment_0001.pdf | ||
| 21._Prospective_Bidders_Letter.pdf | ||
| Project_Drawings.pdf | ||
| Contract_Clauses_and_Bid_Schedule.pdf | ||
| Project_Specifications.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT 002
VT HANLON SUBSTATION, STAGE 01
PROJECT DRAWINGS
A. GENERAL:
CONSTRUCTION STANDARD DRAWINGS: A complete set of standard drawings are available at:
https://www.wapa.gov/DoingBusiness/SellingToWestern/Pages/what-western-buys.aspxm Construction drawings are the specification drawings and any additional drawings required for use in construction.
The construction drawings will be issued after contract award and may include amendment changes and other details, which make the drawings suitable to use for construction purposes.
PROJECT DRAWINGS: Project drawings included herein are reduced reproductions and are not to scale. Some project drawings show details of fabrication and other information not a part of the work. Disregard information and details, which are not applicable.
STANDARD DRAWINGS: Where details shown on standard drawings included herein differ from project drawings or text, the details of project drawings or text shall govern.
INFORMATIONAL DRAWINGS: Some project drawings have the words “FOR INFORMATION ONLY” appearing above the title block. These drawings show some information, which may be required for bidding purposes.
These drawings do not show items to be furnished or work to be performed.
EXISTING INSTALLATION DRAWINGS: Some project drawings have the words “EXISTING INSTALLATION” appearing above the title block. These drawings show the existing installations prior to modifications and may show some new work to be performed.
REFERENCE DRAWINGS: Reference drawings referred to on project drawings and not included herein, are not necessary for bidding purposes.
CONTRACTOR'S RESPONSIBILITY: Check all drawings and advise Western of any errors or omissions.
B. LIST OF DRAWINGS:
LOCATION MAP:
1. VH 0015 – Location and Vicinity Map
ELECTRICAL:
2. VH 0001-1 Rev. A– Switching Diagram (Sheet 1 of 2)
3. VH 0001-2 Rev. A – Switching Diagram (Sheet 2 of 2)
4. VH 1000 Rev. A – General Arrangement Plan
5. VH 1010 – 230KV Area East Bus Plan
6. VH 1011 Rev. A – 230KV Area West Bus Plan
7. VH 1025 – 230/115KV XFMR Area Plan
8. VH 1030 – 115KV & 69KV Areas Plan
9. VH 1040 Rev. A – 230/69KV XFMR Area Plan
10. VH 1050 Rev. B – 69KV Area Plan
11. VH 1100 – Equipment and Material Index
12. VH 1110 – 230KV Area Bay V1 Sections
13. VH 1111 – 230KV Area Bay V2 Sections
14. VH 1112 – 230KV Area Bay V3 Sections
15. VH 1113 – 230KV Area Bay V4 Sections
16. VH 1114 – 230KV Area Bay V5 Sections
17. VH 1115 – 230KV Area Bay V6 Sections
18. VH 1116 – 230KV Area Bay V7 Sections
19. VH 1117 – 230KV Area Bay V8 Sections
20. VH 1118 – 230KV Area Sections J1-J1 and K1-K1
21. VH 1119 – 230KV Area Sections J2-J2 and K2-K2
22. VH 1120 – 230KV Area Section M1-M1
23. VH 1121 – 230KV Area Section M2-M2
24. VH 1125 – KV7A XFMR Area Sections A-A, B-B, and C-C
25. VH 1127 – KV3A XFMR Area Section F-F
26. VH 1130 – 115KV & 69KV Areas Bays Y1 and Y2
27. VH 1131 – 115KV & 69KV Areas Bays Y3 and Y4
28. VH 1132 – 115KV & 69KV Areas Bays Z5 and Z6
29. VH 1133 – 115KV & 69KV Areas Bays Z7 and Z8
30. VH 1140 – KV2A XFMR Area Section A-A
31. VH 1145 – KV6A XFMR Area Section B-B
32. VH 1150 – 69KV Area Bays Z9 and Z10
33. VH 1151 – 69KV Area Bays Z11 and Z12
34. VH 1152 – 69KV Area Bays Z13 and Z14
35. VH 1153 – 69KV Area Bays Z15 and Z16
36. VH 1154 Rev. A – 69KV Area Bays Z17 and Z18
37. VH 1155 – 69KV Area Section F-F
38. VH 1160 – 12.47KV Area Sections D-D and E-E
39. VH 1164 – 12.47KV Area Reactor Dampening Structure
40. VH 1165 – 12.47KV Area Station Service Feed https://www.wapa.gov/DoingBusiness/SellingToWestern/Pages/what-western-buys.aspxm
PROJECT DRAWINGS
41. VH 1180 – 230KV Area Instrument Transformer Details
42. VH 1181 – 115KV Area Instrument Transformer Details
43. VH 1182 – 69KV Area Instrument Transformer Details
44. VH 1185 – A-Frame Details
45. VH 1500 Rev. A – General Grounding Plan
46. VH 1510 – 230KV Area East Bus Grounding Plan
47. VH 1511 – 230KV Area West Bus Grounding Plan
48. VH 1525 – 230/115KV XFMR Area Grounding Plan
49. VH 1530 – 115KV & 69KV Areas Grounding Plan
50. VH 1540 – 230/69KV XFMR Area Grounding Plan
51. VH 1550 Rev. A – 69KV Area Grounding Plan
52. VH 1600 Rev. A – Station Service DWA Wiring Diagram
53. VH 1602 – Service Panel DWB Wiring Diagram
54. VH 1604 – Service Panel DWC Wiring Diagram
55A. VH 1612 – 230KV Area 120/240V Wiring Diagram
55B. VH 1614 – 115KV & 69KV Areas 120/240V Wiring Diagram
55C. VH 1616 – 69KV Area 120/240V Wiring Diagram
55. VH 1606 – Service Panel DWD Wiring Diagram
56. VH 1700 Rev. A – General Conduit Plan
57. VH 1710 – 230KV Area East Bus Conduit Plan
58. VH 1711 Rev. A – 230KV Area West Bus Conduit Plan
59. VH 1725 Rev. A – 230/115KV XFMR Area Conduit Plan
60. VH 1730 – 115KV & 69KV Areas Conduit Plan
61. VH 1740 – 230/69KV XFMR Area Conduit Plan
62. VH 1750 Rev. A – 69KV Area Conduit Plan
63. VH 1780 FIO – Fiber Optic Cable Mounting Details (For Information Only)
CIVIL & SITE DRAWINGS:
64. VH 0016 – Topography
65. VH 2050 Rev. B – Site Plan
65A. VH T017 – Existing Tile Lines
66. VH 2051 Rev. A – Grading Plan
67. VH 2052 Rev. A – Sections & Details (Sheet 1 of 2)
68. VH 2053 – Sections & Details (Sheet 2 of 2)
69. VH 2054 – 12” HDPE Pipe & Outlet Headwall Plan & Profile, Detail & Sections
FOUNDATION AND STRUCTURAL DRAWING INDEX:
70. VH 2000 Rev. A – Foundation/Structural Data and Drawing Index
CONCRETE:
71. VH 2150 Rev. A – Foundation General Plan
72. VH 2200 – 230KV Area East Bus Foundation Plan
73. VH 2201 – 230KV Area West Bus Foundation Plan
74. VH 2202 – 230/115KV XFMR Area Foundation Plan
75. VH 2203 – 230/69KV XFMR Area Foundation Plan
76. VH 2204 – 115KV & 69KV Area Foundation Plan
77. VH 2205 Rev. A – 69KV Area Foundation Plan
78. VH 2300-1 – Foundations Outline and Reinforcement (Sheet 1 of 2)
79. VH 2300-2 – Foundations Outline and Reinforcement (Sheet 2 of 2)
80. VH 2301-1 – Foundations Outline and Reinforcement (Sheet 1 of 2)
81. VH 2301-2 – Foundations Outline and Reinforcement (Sheet 2 of 2)
82. VH 2302-1 – Foundations Outline and Reinforcement (Sheet 1 of 2)
83. VH 2302-2 – Foundations Outline and Reinforcement (Sheet 2 of 2)
84. VH 2303 – Foundations Outline and Reinforcement
85. VH 2304 – Foundations Outline and Reinforcement
86. VH 2305 – Foundations Outline and Reinforcement
87. VH 2306 Rev. A – Foundations Outline and Reinforcement
88. VH 2307 Rev. A – Foundations Outline and Reinforcement
89. VH 2308 Rev. A – Foundations Outline and Reinforcement
90. VH 2309 Rev. A – Foundations Outline and Reinforcement
91. VH 2310 Rev. A – Foundations Outline and Reinforcement
PROJECT DRAWINGS
92. VH 2311 Rev. A – Foundations Outline and Reinforcement
93. VH 2312 Rev. A – Foundations Outline and Reinforcement
94. VH 2313 – Foundations Outline and Reinforcement
94A. VH 2314 Rev. A – Foundations Outline and Reinforcement
94B. VH 2315 Rev. A – Foundations Outline and Reinforcement
94C.VH 2316 Rev. A – Foundations Outline and Reinforcement
CABLE TRENCH:
95. VH 2500 – Cable Trench Plan and Details
96. VH 2501 – Cable Trench Sections
ANCHOR BOLTS & EMBEDDED MATERIALS:
97. VH 2550 – Anchor Bolts
STEEL & ALUMINUM STRUCTURES:
98. VH 2600 – 230KV Take-Off Structure Type IV Elevation
99. VH 2601-1 – 230KV Take-Off Structure Type IV - Assemblies and Connections (Sheet 1 of 2)
100. VH 2601-2 – 230KV Take-Off Structure Type IV Assemblies and Connections (Sheet 2 of 2)
101. VH 2602 – 230KV Take-Off Structure Type V Elevation
102. VH 2603-1 – 230KV Take-Off Structure Type V - Assemblies and Connections (Sheet 1 of 2)
103. VH 2603-2 – 230KV Take-Off Structure Type V - Assemblies and Connections (Sheet 2 of 2)
104. VH 2604 – 115KV Take-Off Structure Type I & II Elevation
105. VH 2605 – 115KV Take-Off Structure Type I & II Assemblies and Connections
106. VH 2606 – 115KV Take-Off Structure Type III Elevation
107. VH 2607 – 115KV Take-Off Structure Type III Assemblies and Connections
108. VH 2608 – 230KV Bus Tower Type I Elevation
109. VH 2609 – 230KV Bus Tower Type I Assemblies and Connections
110. VH 2610 – 45 Ft. Ground Mast Type I
111. VH 2611 – 65 Ft. Ground Mast Type II
112. VH 2612 – Bus Poles Aluminum Design and Details
113. VH 2613 – Bus Poles Steel Design and Details
114. VH 2614 – Bus Tee Poles (2 Phase) Aluminum Design and Details
115. VH 2615 – Bus Tee Poles (2 Phase) Steel Design and Details
116. VH 2616 – Bus Tee Poles (3 Phase) Steel Design and Details
117. VH 2617 – Bus Frames Steel Design and Details
118. VH 2618 – Disconnect Switch Supports Steel Design and Details
119. VH 2619 – Equipment Supports Steel Design and Details
120. VH 2620 – Reactor Dampening Support Type I Elevation
121. VH 2621 – Reactor Dampening Support Type I Sections & Details
122. VH 2622 – Station Service Feed Support Type I Elevation
123. VH 2623 – Station Service Feed Support Type I Sections & Details
124. VH 2624 – 69KV Fuse Disconnect Switch Support Type I Steel Design and Details
125. VH 2925 – Equipment Cabinet Platforms Steel Design and Details
126. VH 2926 – Switch Operating Platforms Steel Design and Details
STRINGING REQUIREMENTS:
127. VH 2900 – Stringing Requirements
CONTROL BUILDING:
128. VH 3200 – General Structural Notes, Abbreviations & Reference Drawings
129. VH 3201 Rev. A – Structural Foundation Plan
130. VH 3202 Rev. A – Structural Roof Framing Plan
131. VH 3203 – Structural Foundation Sections & Details
132. VH 3204 – Structural Foundation/Cable Entry Details (Sh 1 of 2)
133. VH 3205 – Structural Foundation/Cable Entry Details (Sh 2 of 2)
134. VH 3206 – Structural Typical Wood-Framed Wall
135. VH 3207 – Structural Equipment Mounting Details
136. VH 3208 – Building Entry Platforms Steel Design and Details
137A. VH 3000-1 – Architectural Floor Plan
137B. VH 3000-2 – Architectural Reflected Ceiling Plan
138. VH 3001 Rev A – Architectural Exterior Elevations
139. VH 3002 – Architectural Building Sections
140. VH 3003 – Architectural Detailed Sections
141. VH 3004 – Architectural Detailed Sections
PROJECT DRAWINGS
142. VH 3005 Rev. A – Architectural Mechanical Mounting Details
143. VH 3006 – Architectural Door & Window Details
144. VH 3300 Rev. A – Mechanical HVAC Floor Plan
145. VH 3301 Rev. A – Mechanical HVAC Upper Plan.
146. VH 3302 Rev. A – Mechanical Control Room Schedules
147. VH 3303 Rev. A – Mechanical Battery Room Schedules
148. VH 3304 Rev. A – Mechanical HVAC Details
149. VH 3400 Rev . A – Electrical Power Plan
150. VH 3401 Rev. A – Electrical Luminaire & Egress Marking Plan
151. VH 3402 Rev. A – Electrical Door Alarms
152. VH 3403 Rev. A – Electrical Panelboards DHA, DHA1
153. VH 3404 Rev. A – Electrical Wiring Devices Schematic
154. VH 3405 Rev. A – Electrical Luminaire & Equipment Schedules
CONTROLS:
155. VH 4000 Rev. A – Service Building – Arrangement, Conduit & Grounding
156. VH T600-1 Rev. A - Control Cable List (Sh 1 of 2)
157. VH T600-2 Rev. A - Control Cable List (Sh 2 of 2)
158A. VH 6000-1 - DC Distribution Panel BHA1 Wiring Diagram
158B. VH 6000-2 – DC Distribution Panel BHA2 Wiring Diagram
EXISTING TRANSMISSION LINE STRUCTURES:
159. 43-26S 2200 FIO – 26S Tower 55 and 70FT Bodies (For Information Only)
160. 43-26S 2201 Rev A FIO – 26S Tower Leg Extensions to 55 FT Body and Stub Angle (For Information Only)
161. 43-212N 2200 Rev B FIO – Double Circuit Steel Towers 212N & N1 Tower 50’ Body – 10’ Leg Extension & Stub
(For Information Only)
161A. FT-SF D 2005 Rev. A – Fort Thompson – Sioux Falls Double Circuit Steel Towers Footing Data and Selection Criteria (For Information Only)
161B. FT-SF D 2006 Rev. A – Fort Thompson – Sioux Falls Double Circuit Steel Towers Footing Data and Selection Criteria (For Information Only)
161C. FT-SF D 2007 Rev. A – Fort Thompson – Sioux Falls Double Circuit Steel Towers DSH Tower Footings – Types A, B, C, and D (For Information Only)
161D. FT-SF D 2008 Rev. A – Fort Thompson – Sioux Falls Double Circuit Steel Towers DSH Tower Footings – Types DF and DFH (For Information Only)
161E. FT-SF D 2009 Rev. A – Fort Thompson – Sioux Falls Double Circuit Steel Towers DSH Tower Footings – Types PT and PTH (For Information Only)
PLAN AND PROFILES:
162. FT-SF D 4082 Rev. A EI – Fort Thompson – Sioux Falls 230KV Transmission Line Station 1448+00 to 1502+00
(Existing Installation)
163. FT-SF D 4083 Rev. A EI – Fort Thompson – Sioux Falls 230KV Transmission Line Station 1394+00 to 1448+00 (Existing Installation)
GEOLOGY:
164. VH 8000 – Geotechnical Boring Location Plan
165. VH 8001 – Soil Boring Diagram – VT Hanlon Substation Expansion
166. VH 8002 – Boring Number SB-01 and SB-02
167. VH 8003 – Boring Number SB-03 and SB-04
168. VH 8004 – Boring Number SB-05 and SB-06
169. VH 8005 – Boring Number SB-07 and SB-08
170. VH 8006 – Boring Number SB-09
171. VH 8007 – Subsurface Exploration – Penetration Resistance and Log – Hole No. PR14-1 and PR14-2
172. VH 8008 – Subsurface Exploration – Penetration Resistance and Log – Hole No. PR14-3 and PR14-4
173. VH 8009 – Subsurface Exploration – Penetration Resistance and Log – Hole No. PR14-5 and PR14-6
174. VH 8010 – Subsurface Exploration – Penetration Resistance and Log – Hole No. PR14-7 and PR14-8
175. VH 8011 – Subsurface Exploration – Penetration Resistance and Log – Hole No. PR14-9
176. VH 8012 – Geotechnical Subsurface Diagram – SB-01, SB-03, SB-04, SB-05 and SB-06
177. VH 8013 – Geotechnical Subsurface Diagram – SB-07, SB-08 and SB-09
178. VH 8014 – Geotechnical Subsurface Diagram – SB-02, SB-04, SB-07 and SB-08
2Amendment 002
3Amendment 002
4Amendment 002
6Amendment 002
9Amendment 002
10Amendment 002
45Amendment 002
51Amendment 002
52Amendment 002
55AAmendment 002
55BAmendment 002
55CAmendment 002
56Amendment 002
58Amendment 002
59Amendment 002
62Amendment 002
65Amendment 002
65AAmendment 002
67Amendment 002
70Amendment 002
71Amendment 002
77Amendment 002
87Amendment 002
88Amendment 002
89Amendment 002
90Amendment 002
91Amendment 002
92Amendment 002
93Amendment 002
94AAmendment 002
94BAmendment 002
94CAmendment 002
129Amendment 002
130Amendment 002
137AAmendment 002
137BAmendment 002
138Amendment 002
142Amendment 002
144Amendment 002
145Amendment 002
146Amendment 002
147Amendment 002
148Amendment 002
149Amendment 002
150Amendment 002
151Amendment 002
152Amendment 002
153Amendment 002
154Amendment 002
155Amendment 002
156Amendment 002
157Amendment 002
158AAmendment 002
158BAmendment 002
161AAmendment 002
161BAmendment 002
161CAmendment 002
161DAmendment 002
161EAmendment 002
| Amend 002 Drawing Index.pdf |
| A. GENERAL: |
| B. LIST OF DRAWINGS: |
File details come from the government source that posted it. Updated .