Contractor_Calculation_of_Self-Performed_Work.xlsx
XLSX spreadsheet 14 KB Posted
- Attached to
- Davis Watershed Project Federal contract opportunity
- Solicitation number
- Not on record
About this file
Self Perforance
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Question_correction_&_additional_information.pdf | ||
| Questions__2.pdf | ||
| Question_Answers__1.docx | DOCX document | |
| Past_Performance_Capability_Information.docx | DOCX document | |
| Contractor_Certification_Regarding_EMR.pdf | ||
| Addendum_SOW_-Water_Mgmt_Unit-_UC_Davis_revised.pdf | ||
| ars372.pdf | ||
| USDA_ARS_SAWSRU_Davis_100__Bid_Set_Specifications_Rev1_20190715_COR_3.pdf | ||
| ars371.pdf | ||
| USDA_ARS_SAWSRU_Davis_100__Bid_Set_Drawings_20190715_-_Full_Sized_-_1.pdf | ||
| RFI_FORM.pdf | ||
| 12905B19R0032.pdf | ||
| USDA_ARS_SAWSRU_Davis_100__Bid_Set_Drawings_20190715_-_Full_Sized_-_2.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1
| CALCULATION OF SELF-PERFORMED/SUBCONTRACTED WORK | |||||
| Offerors for Commercial and Institutional Building Construction (NAICS code 236220) must provide | |||||
| at least 25 percent of the cost of the contract performance incurred for personnel will be spent on the prime contractor's employees. Provide a breakdown of material and personnel costs, by specification division listed for the project. Home Office overhead,profit/fee and bond costs shall be added after a subtotal of personnel and material/ Equipment costs has been calculated. Clearly identify the personnel costs you will be performing. Below is a suggested format. | |||||
| Specification Division | SB Vendor (Y or N) | Personnel Cost | Material/Equipment Costs | ||
| Prime | Y | $0.00 | $0.00 | ||
| Sub | Y | $0.00 | $0.00 | ||
| Sub | Y | ||||
| Sub | Y | ||||
| Sub | Y | ||||
| Sub | Y | ||||
| Sub | N | $0.00 | $0.00 | ||
| Sub | N | ||||
| Sub | N | ||||
| Sub | N | ||||
| Sub | N | ||||
| (Add additional lines as necessary for each Division applicable to this project) | $ | $ | |||
| $ - 0 | $0.00 |
| $ | $ | |||
| Sub Total (Personnel Costs, Material/Equipment Costs) | $ | 0.00 | ||
| Percentage | 0 | Profit | $ | 0.00 |
| Percentage | 0 | Home Office Overhead | $ | 0.00 |
| Percentage | 0 | Bond | $ | 0.00 |
| Grand Total | $ | 0.00 | ||
| Calculation of self-performed personnel costs: | ||||
| 1. Total personnel costs * both prime and all subcontractors: | $0.00 | |||
| 2. Subtract all subcontractor personnel costs* companies that will perform work | ||||
| on this contract: | $0.00 | |||
| 3. Remainder is ‘Total amount of work to be self-performed under the | ||||
| Contract’: | $0.00 | |||
| 4. Self-performed work = Line 3/Line 1 x 100 = | ERROR:#DIV/0! |
| *personnel costs include labors, mechanics, other tradesmen, and office personnel directly charged to |
| the project (includes project manager, job superintendent, administrative, estimators, etc.) |
| I certify the above representations are true and correct to the best of my knowledge. |
(Signature and Typed Name of Authorized Representative) Date
(Title of Authorized Representative)
File details come from the government source that posted it.