Addendum_SOW_-Water_Mgmt_Unit-_UC_Davis_revised.pdf
PDF 545 KB Posted
- Attached to
- Davis Watershed Project Federal contract opportunity
- Solicitation number
- Not on record
About this file
SOW
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Question_correction_&_additional_information.pdf | ||
| Questions__2.pdf | ||
| Question_Answers__1.docx | DOCX document | |
| Contractor_Certification_Regarding_EMR.pdf | ||
| ars372.pdf | ||
| USDA_ARS_SAWSRU_Davis_100__Bid_Set_Specifications_Rev1_20190715_COR_3.pdf | ||
| ars371.pdf | ||
| USDA_ARS_SAWSRU_Davis_100__Bid_Set_Drawings_20190715_-_Full_Sized_-_1.pdf | ||
| RFI_FORM.pdf | ||
| 12905B19R0032.pdf | ||
| USDA_ARS_SAWSRU_Davis_100__Bid_Set_Drawings_20190715_-_Full_Sized_-_2.pdf | ||
| Contractor_Calculation_of_Self-Performed_Work.xlsx | XLSX spreadsheet | |
| Past_Performance_Capability_Information.docx | DOCX document |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of Agriculture Agricultural Research Service
Addendum SOW
Construct Water Management Research Unit
Facility UC Davis Campus
Davis, California
Date: July 26, 2019
PROJECT POINTS OF CONTACT
1.0 CONTRACT PROJECT:
a. Project Number: ______TBD_________
b. Project Title: “Construct New Water Management Research Unit Facility, UC Davis Campus, Davis, California.
2.0 PROJECT CONTACT PERSONS:
2.1 RESEARCH LEADER (RL) Acting/Consultant:
Email: immikeru@aol.com
Mike Shannon Acting Research Leader Pacific West Area Office Albany, CA 94710
2.2 CONTRACTING OFFICER (CO):
Rob Risch Tel. No.: 541-738-4006
USDA ARS PWA
Contract Specialist Email: rob.risch@usda.gov Corvallis, Oregon
2.3 ADMINISTRATIVE OFFICER (AO):
Joyce Robinson Tel. No.: 530-792-5504 Administrative Officer
USDA-ARS-PWA
430 G. Street #4160 Davis, CA 95616 Email: joyce.robinson@usda.gov
2.4 ENGINEERING PROJECT MANAGER (EPM)/ Contracting Officer Rep
(COR):
Mark McWilliams USDA, ARS, PWA Tel No: 970-631-7513 2150 Centre Avenue Bldg D, Ste 330 mailto:immikeru@aol.com mailto:immikeru@aol.com mailto:rob.risch@usda.gov mailto:rob.risch@usda.gov mailto:joyce.robinson@usda.gov mailto:joyce.robinson@usda.gov
Fort Collins, CO 80526 Email: Mark.McWilliams@usda.gov
2.5 ARCHITECT-ENGINEER CONSULTANT (AE):
Les Hamanaka Tel. No.: 510-205-3197 Tectonics Architects/Planners/Engineers 1500 Park Avenue Emeryville, CA 94608 Email: lhamanaka@tectonics-ae.com
2.6 SAFETY HEALTH ENVIRONMENTAL MANAGER (ASHEM):
Ken Cushman Tel. No.: 510-529-5921
USDA- ARS-PWA
800 Buchanan Street Email: ken.cushman@usda.gov Albany, CA 94710
3.0 SCOPE OF SERVICES:
The Contractor shall provide all professional services necessary for the accomplishment of the contract project and such required services shall be in accordance with requirements as described in the solicitation package below:
A. PROJECT OVERVIEW
The United States Department of Agriculture, Agricultural Research Service (USDA ARS) has a requirement to construct a new one-story pre-engineered building (PEB) of approximately 3,826 SF and will include offices, a conference room, a break room, and utility spaces. This requirement will also include an option for ashalt paving, striping for a parking lot, and installation of a bioswale. New facility will support a federally owned Watershed Research Unit (WRU) to be located on leased land at the University of California at Davis in Davis, California.
The users of the new WRU building will be ARS scientists and associated staff for the purpose of studying watershed issues. The anticipated scientists may eventually include hydrologists, plant physiologists, economists, and data analysts.
B. SITE DESCRIPTION
mailto:Mark.McWilliams@usda.gov mailto:Mark.McWilliams@usda.gov mailto:lhamanaka@tectonics-ae.com mailto:lhamanaka@tectonics-ae.com mailto:ken.cushman@usda.gov mailto:ken.cushman@usda.gov
The USDA ARS lease will include a site owned by the University of California on the University of California, Davis campus. The site is in a rural part of the campus, located on the west side of Hopkins Road at the intersection of Bee Biology Road. At the project site, there is a gravel road to the west, Hopkins Road to the east, a chain link fence to the south, and an existing L-shaped building northeast of the site currently occupied by the UC Davis Information and Education Technology (IET) department. The IET building was constructed around 1994. The property to the south of the site includes four Pomology field structures. On the proposed WRU site itself there is an existing concrete pad where two small sheds have been removed, and a decommissioned satellite dish. The pad and the satellite dish will be removed within the scope of this project.
There are a number of existing trees on the project site preserving a few “Heritage/Specimen” trees on or near the site will be required. Other miscellaneous trees will be removed as required for the proposed building.
The WRU facility will have an asphalt concrete paved parking lot on both the east and west sides of the proposed building. The west parking lot will connect to the existing north-south gravel road immediately west of the project site. The east parking lot will connect to the existing east-west gravel road immediately south of the project site, connecting to Hopkins Road. Concrete sidewalks will be provided outside of entry and exit doors and to Hopkins Road, with an accessible curb ramp.
A 20’w. x 12’d. concrete apron will be provided outside of the roll-up door to the Instrumentation Shop.
C. TOPOGRAPHIC SURVEY AND SITE UTILITIES
A topographic survey and lease boundary survey of the site has been developed and will be provided with solicitation documents. The topographic survey was coordinated with and includes existing UCD utilities, mainly south and east of the project site. A Site Utility Study identifying existing site utilities that will provide service to the new WRU will be provided with solicitation documents. The site is relatively flat and no wetlands have been identified.
D. BUILDING GRADING AND DRAINAGE
North-South leg of the site, looking north.
Proposed site, looking west toward the decommissioned satellite dish.
It is anticipated that due to expansive soils in the vicinity over-excavation will be required and engineered fill will be installed under the new building. The new WRU will require a standard reinforced concrete slab on grade and a perimeter drainage system to remove ground water from the immediate area adjacent to the new building. A complete geotechnical report will be provided with solicitation documents.
E. SITE FURNISHINGS
One dumpster pad on the west side of the building will be installed. Waste and recycling collection trucks will be required to access the west parking area.
F. FENCING AND SECURITY
A Six-foot-high chain link fencing and manually operated swing gates shall be provided to separate the parking areas from public entry during non-business hours.
G. LANDSCAPING
A 4-foot wide graveled area around the building perimeter where there is no paving will be installed.
H. SITE DEMOLITION
Includes demo of existing concrete slab where two sheds have been removed and an existing decommissioned satellite dish and associated foundation and electrical devices.
I. SITE CLEARING
Required clearing and grubbing of areas within the scope of work included.
J. STORM WATER QUALITY
This project will collect all of the storm drainage runoff from impervious surfaces and direct it to landscaped bioswales immediately adjacent to the new parking lots. The size of the landscaped bioswales will be approximately 4% of the total impervious surfaces created for this project.
K. STORM DRAINAGE
Area drain and 10” storm drain pipe are within the footprint of the new east parking lot.
This 10” storm drain connects to a storm drain manhole in the gravel road immediately south of the project site. A 30” storm drain pipe from this manhole connects into an existing manhole and storm drain main in Hopkins Road. This project is designed for a 10 year storm event and will tie into the existing storm drain system that connects to the existing storm drain main in Hopkins Road.
L. SANITARY SEWERAGE
There is an existing 8” sanitary sewer main in Hopkins Road, immediately east of the project site. This project will direct the sanitary sewerage from the proposed building into this existing 8” sanitary sewer main.
M. DOMESTIC AND FIRE WATER
There is an existing 8” water main in Hopkins Road, immediately east of the project site.
A new fire hydrant will be required for the project to be installed at the southeast corner of the new building, adjacent to the new east parking lot. Domestic water service will also be able to be served from the existing 8” water main in Hopkins Road.
N. GEOTECHNICAL ASSESSMENT
Soil borings have been taken on the proposed site on March 25, 2019. An analysis of the borings is contained in a geotechnical report which will be provided with solicitation documents.
| United States Department of Agriculture |
| United States Department of Agriculture |
| Agricultural Research Service |
| Agricultural Research Service |
| Construct Water Management Research Unit Facility |
| Construct Water Management Research Unit Facility |
| UC Davis Campus |
| UC Davis Campus |
| Davis, California |
| Davis, California |
| b. Project Title: “Construct New Water Management Research Unit Facility, UC Davis Campus, Davis, California. |