D.2 ATTACHMENT B - SAP QASP_CRRC_SHEP IT Security.doc

DOC document 110 KB Posted

Attached to
System Security Maintenance Federal contract opportunity
Solicitation number
36C10X24Q0338
Issued by
Department of Veterans Affairs Strategic Acquisition Center Frederick

About this file

This document is a Simplified Acquisition Procedures (SAP) Quality Assurance Surveillance Plan (QASP) that provides a systematic method for the government to monitor contractor performance for a federal contract opportunity. The QASP outlines the performance standards, acceptable levels of performance, and surveillance methods the government will use to assess the contractor's work, including 100% inspection, customer complaints, and on-site surveillance. The QASP also describes how the government will document acceptable and unacceptable performance, including the issuance of Contract Discrepancy Reports if necessary. This QASP supports a federal contract opportunity for System Security Maintenance services for the Department of Veterans Affairs, with the goal of maintaining electronic security systems including Lenel OnGuard and Pelco video at two VA facilities. The contract requires 24/7 maintenance and support services, software and hardware support, licensing, upgrades, and replacement parts.

View the file

Other files for this federal contract opportunity

Other files attached to System Security Maintenance, newest first.
File Type Posted
Security Sytem Maintenance QA.docx DOCX document
D.4 ATTACHMENT D - PAST PERFORMANCE REFERENCES.pdf PDF
D.1 ATTACHMENT A - APPENDIX B and C.docx DOCX document
D.3 ATTACHMENT C - Wage Determination.txt TXT text file
S02 - 36C10X24Q0338 - OIT Martinsburg Sec System Mx_ZRM.docx DOCX document
D.5 ATTACHMENT E - PAST PERFORMANCE QUESTIONAIRE.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Security Systems Preventative Maintenance and Parts

SIMPLIFIED ACQUISITION PROCEDURES (SAP) QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

DEPARTMENT OF VETERANS AFFAIRS

Office of Information & Technology

Space and Facilities Management Security Systems Preventative Maintenance and Parts Date: 06-17-2019 QASP Version Number: 2.0 Quality Assurance Surveillance Plan (QASP) Template Version History

Template Version #
Version Description
Release Date
2.0
1. Replaced “Acceptable Quality Level (AQL) with Acceptable Levels of Performance (ALPs) document wide

2. SAP Performance Based Service Assessment – Replaced “Objective” with “Standard”. Added review of invoices under section B.2

Sep 14, 2012

Initial Release
Dec 7, 2011

This document does not get incorporated into the contract/ORDER; it is used by government representatives to monitor performance and the government has the right to change its method of surveillance at any time. the co/COR should provide a copy to the contractor through correspondence.

1. SIMPLIFIED ACQUISITION PROCEDURES (SAP) Quality Assurance Surveillance Plan

This Simplified Acquisition Procedures (SAP) Quality Assurance Surveillance Plan (QASP) provides a systematic method to monitor Contractor performance.

2. Performance Standards Performance Standards define acceptable performance for specific tasks. The Government performs surveillance to determine if the Contractor meets or does not meet these standards.

The Performance Metrics for Deliverables and Performance Standards are outlined in the SAP Performance Work Statement (PWS). The schedule of deliverables is outlined in Section B of the contract/order. The Government will utilize the Simplified Acquisition Procedures (SAP) Performance Based Service Assessment Survey, provided at the end of this document to compare Contractor performance to the Acceptable Levels of Performance (ALPs).

At the end of each assessment period, the assessment will be reviewed by the CO. The COR/CO will notify the Contractor of the results no later than 15 working days after the end of the assessment period.

3. Methods of QUALITY ASSURANCE (QA) Surveillance

The COR shall use any or several of the surveillance methods listed below in the administration of this SAP QASP.

FORMCHECKBOX

100% INSPECTION (of a Specific type of Deliverable) in a Specific Area Each assessment period, the COR shall review the Contractor’s performance/generated documentation and document the results accordingly. This assessment shall be placed in the COR’s Quality Assurance (QA) file.

FORMCHECKBOX

Validated Customer Complaint or Validated Unacceptable Level of Performance

Each assessment period, the COR shall review the Contractor’s performance/generated documentation corresponding to a validated customer complaint or validated Inablility to perform in accordance with the ALP and document your results accordingly. This assessment shall be placed in the COR’s QA file.

FORMCHECKBOX

On-Site Surveillance

Each assessment period, the COR shall review and document findings from an on-site surveillance and document your results accordingly. This assessment shall be placed in the COR’s QA file.

4. DOCUMENTING PERFORMANCE

a. Acceptable Performance The Government shall document acceptable performance accordingly. Any report may become a part of the supporting documentation for any contractual action.

b. Unacceptable performance When unacceptable performance occurs, the COR shall inform the CO. This will always be in writing although when circumstances necessitate immediate verbal communication, that communication will be followed in writing. The COR shall document the discussion and place it in the COR file.

When the CO determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR), and present it to the Contractor's program manager.

The Contractor shall acknowledge receipt of the CDR in writing to the CO. The CDR will state how long after receipt the Contractor has to take corrective action. The CDR will also specify if the Contractor is required to prepare a corrective action plan to document how the Contractor shall correct the unacceptable performance and avoid a recurrence. The CO shall review the Contractor's corrective action plan to determine acceptability.

Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO.

5. Frequency of Measurement

During contract/order performance, the COR will periodically analyze whether the negotiated frequency of surveillance is appropriate for the work being performed, and at a minimum shall be performed twice within the Period of Performance.

SAP PERFORMANCE BASED SERVICE ASSESSMENT

CONTRACTOR:
GOVERNMENT REQUIRING ACTIVITY

CONTRACT/ORDER NUMBER/ TITLE:

PERIOD COVERED:

Place an X in the appropriate response

I. Performance Standards for Assessment
Acceptable
Unacceptable *

A. MEETING TECHNICAL NEEDS:

1. What level of understanding does the contractor have of my technical needs and my mission requirements?

2. What level of efficiency and effectiveness does the contractor demonstrate in meeting my requirements?

3. Overall, how well does the contractor meet my technical needs and mission requirements?

4. Overall, the quality of the products/services provided are….

B. PROJECT MILESTONES AND SCHEDULE:

1. How well does the contractor meet my established milestones and project dates?

2. How timely are products, reports and invoices completed, reviewed, and delivered?

3. How well does the contractor notify me in advance about potential milestones and scheduling problems so that I have enough time to correct them?

*Unacceptable ratings must be explained in Section II (Narrative Clarification) below.

II. NARRATIVE CLARIFICATION

(USE ADDITIONAL

SPACE AS REQUIRED)

SAP QASP Template_Sep_14_2012

SAP QASP Template_Sep_14_2012