CU150~17.docx
DOCX document 21 KB Posted
- Attached to
- DHS SP Kiley- Replace D14 Sewer Line- PIF FY27
- Solicitation number
- 27-444DHS-DEVDI-B-53484
- Issued by
- Lake County, Illinois
About this file
This supplemental terms and conditions attachment pertains to a public works project for the Illinois Department of Human Services (DHS) involving the removal and replacement of sewer lines at the Ann Kiley Center in Waukegan, Illinois. The document establishes employment, wage, and compliance requirements that vendors must meet to be considered responsive bidders for this construction project.
Vendors must certify compliance with multiple statutory requirements including the Illinois Prevailing Wage Act (820 ILCS 130/.01 et seq.) and the Illinois Procurement Code (30 ILCS 500). Key responsiveness requirements include: employing at least 90% Illinois laborers during periods of excessive unemployment (defined as any month following two consecutive months with unemployment exceeding 5%), maintaining an Illinois primary office for construction personnel, obtaining hazardous occupation insurance with the State named as additionally insured, providing a United States Department of Labor Apprenticeship and Training Certificate or Program Letter, and submitting either a written Equal Employment Opportunities policy or an acceptable Workforce Projection detailing workforce composition by race, gender, ethnicity, veteran status, and trade category. Vendors must pay prevailing wage rates as published by the Illinois Department of Labor for the county where work is performed, monitor the Department of Labor website for rate revisions, and maintain compliance with all record-keeping and notice requirements. All employees must carry vendor-supplied identification, comply with OSHA standards, perform quality work, and adhere to site safety protocols.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Terms And Cond~4.pdf | ||
| RFQ - Sanitary Line D14~3.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment A – Additional Supplemental Terms & Conditions
EMPLOYMENT OF PUBLIC WORKERS ON PUBLIC WORKS
In a period of excessive unemployment rates, State contractors (1) constructing or building any public works or (2) cleaning-up and disposing on-site of hazardous waste, and that clean-up or on-site disposal is funded or financed in whole or in part with State funds or funds administered by the State, are required to employ at least 90% Illinois laborers on such project. For projects involving clean-up and on-site disposal of hazardous waste, emergency response or immediate removal activities are excluded. This requirement applies to all labor whether skilled, semi-skilled or unskilled, whether manual or non-manual.
A period of excessive unemployment rates is defined as any month immediately following two consecutive calendar months during which the level of unemployment in the State of Illinois has exceeded 5% as measured by the United States Bureau of Labor Statistics in its monthly publication of employment and unemployment figures. Any public works project financed in whole or in part by federal funds administered by the State of Illinois is covered under the provisions of this requirement, to the extent permitted by any applicable federal law or regulation. 30 ILCS 570. Contractors may receive an exception from this requirement by submitting a request and supporting documents certifying that Illinois laborers are either not available or are incapable of performing the particular type of work involved. The certification must: (a) be submitted to the agency within the first quarter of the Contract Term; (b) provide sufficient support that demonstrates the exception is met; (c) be signed by an authorized signatory of the contractor; and (d) be approved by the agency.
30 ILCS 500/25-60 Prevailing Wage The Vendor shall provide services in compliance with accreditation standards and all other applicable codes, standards, laws, rules and regulations including Occupational Safety and Health Administration (OSHA) standards.
The Vendor’s employees shall demonstrate competence and experience in their work and quality work is required. Hasty and careless performance of work will not be acceptable. Work that is deemed unsatisfactory will immediately be called to the attention of the Vendor and corrections will be made at the Vendor’s expense.
The Vendor’s employees shall carry identification, supplied by the Vendor, at all times.
The Vendor and Vendor’s employees shall obey all traffic regulations at the Center. All unattended vehicles must be locked and the motor shut off.
The Vendor and Vendor’s employees shall not leave any tools, equipment or materials unsupervised, as they could become a potential safety hazard. Vehicles, tools and work supplies are to be secured at all times.
The Vendor shall certify compliance with the Illinois Prevailing Wage Act by checking the box below:
This contract calls for the construction of a “public work”, within the meaning of the Illinois Prevailing Wage Act, 820 ILCS 130/.01 et seq. (“the Act”) or is a service contract subject to the prevailing wage requirements of the Illinois Procurement Code, 30 ILCS 500/25-60 (“the Code”). The Act requires contractors and subcontractors to pay laborers, workers and mechanics performing services on public works projects no less than the current “prevailing rate of wages” (hourly cash wages plus amount for fringe benefits) in the county where the work is performed. The Code requires vendors awarded certain service contracts to pay service workers no less than the general prevailing wages rate of hourly wages (hourly cash wages plus amount for fringe benefits) in the county where the work is performed. The Illinois Department of Labor publishes the prevailing wage rates on its website at http://labor.illinois.gov. The Illinois Department of Labor revises the prevailing wage rates and the contractor/subcontractor has an obligation to check the Illinois Department of Labor’s website for revisions to prevailing wage rates. All contractors and subcontractor’s rendering services under this contract must comply with all requirements of the Act and Code, including but not limited to, all wage requirements and notice and record keeping duties.
Will comply: |_| Yes |_| No It shall be the Vendor’s responsibility to secure and utilize the copies of the prevailing wage rates in effect. Please visit: http://www.illinois.gov/idol/Laws-Rules/CONMED/Pages/Rates.aspx for the most current data.
| _______________________________ | ____________________ | |
| Vendor Signature | Date |
Vendor must check “YES” checkbox to indicate compliance for bid to be considered responsive.
30 ILCS 500/30-22 Additional responsiveness requirements
1. Vendor certifies it will comply with applicable provisions of the Illinois Procurement Code 30 ILCS 500 and applicable rules in performance of this contract.
Will comply: |_| Yes |_| No
2. Vendor certifies it will maintain an Illinois office as the primary place of employment for persons employed in the construction work identified in this solicitation.
Will comply: |_| Yes |_| No
3. Vendor shall at all times during the contract term and any renewals, maintain “hazardous occupation” (commonly known as “Builder’s Risk) Insurance in addition to the Insurances described elsewhere. Vendor shall, at all times during the term and any renewals maintain and provide a Certificate of Insurance naming the State as additionally insured for all required bonds and insurance. Insurance shall not limit Vendor’s obligation to indemnify, defend, or settle any claims.
Will comply: |_| Yes |_| No
4. Bidder must provide a copy of their United States Department of Labor (USDOL) Apprenticeship and Training Certificate or Program Letter.
5. Bidder must provide one of the following:
· a copy of their written Equal Employment Opportunities (EEO) policy;
OR
· a Workforce Projection for work performed on the project being bid. Workforce projections shall include any subcontractor’(s’) workforce. Workforce hours should be broken out by African American male or female, Hispanic male or female, Native American male or female, Asian male or female, Caucasian male or female and Veteran male or female; and by Trade Category. DHS’ acceptance of the bidder’s projection is a condition of contract award. DHS will notify the bidder if the projection is unacceptable. The bidder shall be given the opportunity to negotiate an acceptable projection with the DHS. Failure to reach an acceptable workforce projection may result in rejection of the contract award.
| _______________________________ | ____________________ | |
| Vendor Signature | Date |
To be considered responsive, Vendor must:
· check “YES” for each checkbox to indicate compliance;
· provide copy of USDOL Apprenticeship and Training Certificate or Program Letter; and
· a copy of their written Equal Employment Opportunities (EEO) policy; OR a Workforce Projection
File details come from the government source that posted it. Updated .