CTR079191_Contract_Documents.pdf

PDF 3 MB Posted

Attached to
AZ|CTR079191
Contract number
CTR079191
Issued by
Arizona

About this file

This document is a state contract (Contract No. CTR079191) between the Arizona Department of Transportation (ADOT) and an unnamed contractor for emergency road repair services. The contract is a federal-aid highway construction project located in Maricopa County, Arizona, and is subject to various federal and state regulations, including Davis-Bacon Act requirements, Disadvantaged Business Enterprise (DBE) provisions, and Equal Employment Opportunity guidelines.

The contract covers emergency road repair work on US 60 Eastbound between mileposts 241.4 and 242.0, addressing damage caused by recent flooding. The repair work includes removing damaged guardrails, reconstructing roadway edges, stabilizing embankment failures, and providing traffic control. The contract term is six months from the effective date of award, with the possibility of extension for up to an additional six months. While no specific contract value is explicitly stated, the scope involves interim repair measures to restore roadway functionality and safety. The contractor is responsible for all labor, equipment, materials, and traffic management necessary to complete the emergency repairs, with work to begin immediately upon receiving department approval.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT SIGNATURE PAGE

Contract No: CTR079191 Page 1 of 1

Rev. 08/2025

Contract Signature Page

The Undersigned hereby agrees to perform in compliance with all terms, conditions, specifications in the Contract.

Contractor Company Name Signature of Person Authorized to Sign Contract Date

Address Printed Name and Title

City, State, Zip Contact Name and Title

By checking this box, Offeror is certifying that it is exempt from the requirements regarding the forced labor of ethnic Uyghurs and boycott of Israel because of one of the following: Contractor is a Sole proprietorship, has fewer than ten (10) employees;

or is a non-profit organization.

Contact Email Address Contact Phone Number

CERTIFICATION: By signature in the above, Offeror certifies that it:

1. Will not discriminate against any employee or applicant for employment in violation of any Federal anti-discrimination laws, rules, regulations or executive orders, [Arizona] State Executive Orders 2023-09, 2023-01, 2009-09 or A.R.S. §§ 41-1461 through 41-1465;

2. Has not given, offered to give, nor intends to give at any time hereafter any economic opportunity, future employment, gift, loan, gratuity, special discount, trip, favor, or service to a public servant in connection with the Contract; failure to provide a valid signature affirming the stipulations required by this clause may void the Contract;

3. Has not signed the Contract with a false statement, which will void the Contract and may subject Contractor to legal penalties under law;

4. Complies with A.R.S. § 18-132 when offering electronics or information technology products, services, or maintenance;

5. Did not and will not involve collusion or other anti-competitive practices; and

6. Is not debarred from, or otherwise prohibited from, participating in any contract awarded by any federal entity, or state or local government.

7. Does not participate in, and agrees not to participate in during the term of the contract, a boycott of Israel in accordance with A.R.S. § 35-393 et seq. (Unless exempt)

8. Does not participate in the use of forced labor of ethnic Uyghurs as described in A.R.S. § 35-394. (Unless exempt)

CONTRACT EXECUTION BY PROCUREMENT AUTHORITY

The Contractor is now bound to sell the Materials or Services listed in the attached Contract, including all terms, conditions and specifications as stated herein.

The Contract shall henceforth be referred to as Contract No.

The effective date of the Contract is

The Contractor is cautioned not to commence any billable work or to provide any Material or Service under this Contract until Contractor receives an Order or written notice to proceed.

State of Arizona Awarded this day of 20

Amar Greasham Procurement Manager Procurement officer signature

Docusign Envelope ID: E9BFEAC4-BE6F-4B80-9E0C-D44152D5A282

11/7/2025

257th November

CTR079191

Rev. 03/2025

STATE OF ARIZONA

ARIZONA DEPARTMENT OF TRANSPORTATION

1655 W. Jackson St., MD 100P Phoenix, AZ 85007

CONTRACT

CONTRACT NUMBER: CTR079191

DESCRIPTION: US 60 Emergency Road Repair

Megan Walker Procurement Officer Phone: 602-712-8407 Email: mwalker2@azdot.gov

This contract is established in accordance with A.R.S. §41-2537 and A.A.C. R2-7-E302, Emergency Procurements.

“An Equal Opportunity Agency”

The Arizona Department of Transportation, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat.

252.42 U.S.C. §§ 2000d-4) and the Americans with Disabilities Act (ADA), hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, national origin in consideration for an award.

Persons that require a reasonable accommodation based on language or disability should contact ADOT’s Procurement Office by phone (602) 712-2089. Requests should be made as early as possible to ensure the State has an opportunity to address the accommodation.

Las personas que requieran asistencia (dentro de lo razonable) ya sea por el idioma o discapacidad deben ponerse en contacto con ADOT (602) 712-2089.

mailto:SAlberts@azdot.gov

TABLE OF CONTENTS

CONTRACT NO: CTR079191 Available online at https://app.az.gov/

SECTION PAGE

Cover Page 1

Table of Contents 2

Specifications 3

Special Terms and Conditions 8

Uniform Terms and Conditions 17

Federal Provisions 34

Exhibits

1 - Title VI/Non-Discrimination Assurances Appendix A 67

2 - Title VI/Non-Discrimination Assurances Appendix E 68

3 - 308C-P DBE Termination-Substitution-Reduction Request 69

4 - 310PS DBE Certification of Final Payments 71

5 - Request to Extend Decertified DBE Contract for DBE Credit (118DB-EX) 72

6 - FHWA 1273 74

7 – Wage Determination 88

8 - Safety Program Plan Requirements 98

Attachments

1 – Offer and Acceptance

2- List of Subcontractors

3 – ADOT Confidentiality and Trade Secrets

4 – Offeror Information

5 - DBE Regular Dealer-Distributor 107DBE RD-D

6 - ADOT Lobbying Certification

7- Certification of Domestic Construction Materials (BABA)

8 - Certification Steel, Iron or Manufactured Products (Buy America)

9 - Non-Collusion Affidavit

SPECIFICATIONS

1. Statement of Need

1.1. Pursuant to the Arizona Procurement Code, A.R.S. §41-2501 et seq., the State of Arizona Department of Transportation (Department), has a requirement for US 60 Emergency Road Repair.

2. Introduction and Background

2.1. Recent flooding events have caused significant damage along the US 60 Eastbound (EB) between milepost (MP) 241.4 and 242.0. The flooding impacted the roadway slope, shoulder, guardrail, and pavement, resulting in the closure of a one lane of the roadway.

This closure has had a substantial impact on traffic flow and has placed an increased burden on the Department’s maintenance that are providing twenty four hour traffic control to endure public safety.

2.2. The work and repairs performed under this contract are emergency repairs to U.S. 60 between Milepost (MP) 241.4 and MP 242.0, addressing damage caused by flooding that impacted the roadway slope, shoulder, guardrail, and pavement. The work performed is intended as an interim repair measure.

3. General Requirements

3.1. The Contractor shall perform all repair activities in accordance to the ADOT Standard

Specifications for Road and Bridge Construction current addition including errata, and addenda.

3.2. The Department Project Manager is Olivier Mirza, 602-712-4032, will provide general direction as necessary and be responsible for decisions pertaining to work under this contract.

3.3. Work Location

3.4.1. The work shall occur at the following location:

3.3.1.1. The areas between milepost 241.4 and 242.0, defined as two separate areas along the US 60 in the Southeast District. Area 1 will be closest to milepost 241.4 and Area 2 will be closest to milepost 241.7.

3.4. Time for Completion

3.4.1. The Contractor shall begin repair services immediately after receiving approval from the Department.

4. Specific Requirements

4.1. Repair Requirements

4.1.1. The Contractor shall provide all traffic control while repair work is being done, until the work has progressed to safely accommodate two lanes of traffic.

4.1.2. The Contractor shall maintain all existing temporary concrete barriers and impact attenuators. Contractor shall be responsible for replacing temporary barriers and impact attenuators as needed.

4.1.3. The Contractor shall be responsible of temporary movement of barriers in order to gain access to work zones and the reinstallation of the existing barriers upon completion of interim repairs.

4.1.4. At the conclusion of the emergency repair work, all existing temporary concrete barriers and attenuators used during the course of the work shall be left in place on the project site, positioned in front of the existing guardrail as directed by the Department. The Contractor shall make the necessary arrangements with the owner of the temporary concrete barriers and attenuators to facilitate procurement of these materials by the Department. It is the intent that the barrier and temporary impact attenuators shall become property of the Department.

4.1.5. At the conclusion of the emergency repair work, the roadway shall be restriped to its original preconstruction location.

4.1.6. Area 1 US60 EB, MP 241.4

4.1.6.1. The Contractor shall remove and dispose of damaged guardrail

4.1.6.2. The Contractor shall remove damaged asphalt and saw-cut the edge of pavement as needed.

4.1.6.3. The Contract shall stabilize areas of embankment failure that were washed away due to flood damage.

4.1.6.4. The Contractor shall reconstruct the edge of the roadway. The edge of the roadway shall be built up sufficiently to allow a temporary concrete barrier can occupy the location where the guardrail was removed due to the flood damage. Milling shall be supplied from the Departments Globe Yard (located off of the US 60 at milepost 253.3). The cost of hauling the millings from the yard to the jobsite shall be included in the cost.

4.1.6.5. Edges along the roadway that have been eroded below the pavement surface, milling material shall be placed and compacted to bring the should flush with the pavement surface. The limits of this work shall be confined to the project limits as directed by the Department.

4.1.6.6. The Contractor shall maintain and replace temporary striping as needed.

4.1.7. Area 2 US60 EB, MP 241.7

4.1.7.1. The Contractor shall remove asphalt concrete and concrete from the drainage channel.

4.1.7.2. The Contractor shall remove and dispose of damaged guardrail.

4.1.7.3. The Contractor shall remove damaged asphalt and saw-cut the edge of pavement as needed. Remove a section approximately one hundred sixty-two (162) feet in length by eleven (11) feet in width, using the white edge line as the reference point. The removal shall extend approximately five (5) feet into the travel land from the edge line. The area shall be constructed with eight (8) inches of new asphalt and eight (8) inches of aggregate base course.

4.1.7.4. The Contract shall stabilize areas of embankment failure that were washed away due to flood damage.

4.1.7.5. The Contractor shall reconstruct the edge of the roadway. The edge of the roadway shall be built up sufficiently to allow a temporary concrete barrier can occupy the location where the guardrail was removed due to the flood damage. Milling shall be supplied from the Departments Globe Yard (located off of the US 60 at milepost 253.3). The cost of hauling the millings from the yard to the jobsite shall be included in the cost.

4.1.7.6. Edges along the roadway that have been eroded below the pavement surface, milling material shall be placed and compacted to bring the should flush with the pavement surface. The limits of this work shall be confined to the project limits as directed by the Department.

4.1.7.7. The Contractor shall maintain and replace temporary striping as needed.

4.2. Traffic Control

4.2.1. The Contractor shall provide traffic control, to facilitate the emergency repair work and to assist the Department with the needed detours of the US 60 traffic.

4.2.2. All Traffic shall be maintained through the work area and protected in accordance with the requirements of the Manual on Uniform Traffic Control Devices (MUTCD) current edition as adopted by ADOT including errata and addenda and the ADOT Traffic Control Supplement current Edition of MUTCD, Part VI, Standards and Guides for Traffic Controls for Street and Highway Construction, Maintenance, Utility, and Incident Management Operations, as revised, including future revisions;

and the ADOT Traffic Control Manual for Highway Construction and Maintenance, current edition, including future revisions.

4.2.3. If any conditions exist, which in the judgment of the Project Manager or their representative requires additional or special traffic control methods or signing, such traffic control shall be supplied by the Contractor.

4.2.4. All traffic control devices shall be furnished by the Contractor and must be in place prior to the commencement of work.

4.2.5. The Contractor shall prepare a specific traffic control plan for the project any traffic control situation that requires more than routine traffic control methods or signing shall be discussed with the Department and shall be subject to acceptance by the ADOT Regional Traffic Engineer.

4.2.6. The Contractor shall notify the Department Representative immediately prior to establishing any lane closure or restriction and immediately upon dismantling any lane closure or restriction.

4.2.7. When used, arrow panels shall conform to the requirements and standards of the

MUTCD, current edition as adopted by ADOT, Part VI, Temporary Traffic Control, Section 6F.56, Arizona Supplement to current edition of the MUTCD and in accordance with the Standard Specifications, Subsection 701-2.02. Arrow panels shall be truck or trailer mounted and shall be of the sequential chevron type.

4.3. Materials

4.3.1. The materials furnished and installed along with all other work performed under this contract shall conform to all applicable State, Federal, and local requirements.

This includes the following:

4.3.1.1. Manual on Uniform Traffic Control Devices (MUTCD), the latest edition as officially adopted by the Department and the Department’s supplement to this document. Refer to the following link:

https://mutcd.fhwa.dot.gov/

4.3.1.2. The Department’s Standard Specifications for Road and Bridge Construction, current Edition, including errata, and addenda:

https://azdot.gov/business/contracts-and-specifications/specifications

4.3.1.3. ADOT Stored Specifications

4.3.1.4. Any other documents referenced directly in the specifications and the Contract.

4.4. Suspension of Work

4.4.1. The Contractor may suspend operations at any time, if weather, road, or traffic conditions are such that the work operations cannot be carried out in a safe and effective manner or will pose an environmental hazard. If such suspension occurs, the Contractor shall immediately notify the Project Manager or their designated representative.

4.4.2. The Project Manager or their designated representative may suspend work operations at any time, when in their judgment, present or impending weather conditions are such that the work cannot be carried out in a safe and effective manner.

4.4.3. The Project Manager or their designate representative shall immediately suspend operations when work performance is observed in violation of safety rules, regulations or practices. Violations of safety rules, regulations, or practices may be considered grounds for termination of the contract.

https://app.az.gov/ https://mutcd.fhwa.dot.gov/

4.5. Safety Sanitary & Health Conditions

4.5.1. The Contractor shall provide and maintain in a neat and sanitary condition such accommodations for the use of the Contractor’s employees as may be necessary to comply with the requirements and regulations of the Arizona State Department of Health Services or other authorities having jurisdiction therein.

4.5.2. Attention is directed to Federal, State, and local laws, rules, and regulations, concerning construction safety and health standards. The Contractor shall not require any workers to work in surroundings or under conditions that are unsanitary, hazardous, or dangerous to their health or safety.

4.5.3. All Contractor employees shall be incompliance with Occupational Safety and Health Administration (OSHA), and all State, Federal, Tribal, and local law regulatory agency requirements.

5. Contractor’s Responsibilities

5.1. The Contractor shall furnish all necessary labor, tools, equipment, supplies, and materials, necessary to effectively perform the required services in accordance with the specifications described herein.

5.2. The Contractor shall furnish, and install all temporary traffic controls that provide the user with adequate warning of hazardous conditions associated with the Contractor’s operations.

5.3. The Contractor shall be responsible for coordinating all road repair and traffic control services with the Project Manager or their designee.

6. Department’s Responsibilities

6.1. The Department will decide all questions that may arise as to the acceptability of any work performed under this contract.

6.2. The applicable Project Manager or appointed representative(s) has the authority to coordinate, schedule, conduct, inspect, accept, monitor performance, and invoke warranty provisions within the stated provisions of this contract.

6.3. The Department will notify the Contractor, verbally and in writing, of any deficiencies found within the contract limits. If deficiencies are noted, a copy of the completed deficiency report will be furnished to the Contractor.

6.4. The Department reserves the right to inspect equipment at any time and require the replacement of any that does not meet minimum serviceability standards. Equipment, machinery, component, or system failures that affect the safe operation of any equipment shall be corrected prior to using the equipment.

6.5. The Department shall maintain all temporary traffic controls that provide the user with adequate warning of hazardous conditions associated with the Contractor’s operations.

SPECIAL TERMS AND CONDITIONS

1. CONTRACT TERM

The term of any resultant contract shall commence on the effective day of award and shall continue for a period of six months (6) thereafter, unless terminated, cancelled or extended as otherwise provided herein.

2. CONTRACT EXTENSION

By mutual written contract amendment, any resultant contract may be extended for supplemental periods of up to a maximum of six (6) months.

3. ELIGIBLE AGENCIES

This contract shall be for the exclusive use of the Arizona Department of Transportation.

4. NON-EXCLUSIVE CONTRACT

This contract shall be for the sole convenience of the Department. The Department reserves the right to obtain like goods or services from another source when necessary. The Off-Contract Purchase Authorization and subsequent procurement shall be consistent with the Arizona Procurement Code.

5. ORDERING PROCESS

The Department shall issue a purchase order to the Contractor. Each purchase order must cite the contract number. This purchase order shall be the only document required for the Department to order and the Contractor to deliver the material and/or service.

Any attempts to represent any material and/or service not specifically awarded as being under contract is a breach of the contract and a violation of the Arizona Procurement Code. Any such action is subject to the legal and contractual remedies available to the State inclusive of but not limited to contract cancellation, suspension and/or debarment of the Contractor.

6. INVOICING and PAYMENT

Separate invoices are required for each shipment of product or delivery of service and shall include at a minimum:

• Department Location’s Name and Address

• Vendor Name, Remit to Address and Contact Information

• Contract Number

• Purchase Order Number

• Invoice Number and Date

• Date the items were shipped to the Department

• Contract Line Item Number

• Line Item Description or Item or Service

• Quantity Purchased

• Line Item Unit of Measure

• Price per Unit and Total per Unit

• Catalog or Other Discount (if applicable)

• Net Unit Price and Total per Unit (if applicable)

• Applicable taxes

• Applicable Shipping/Freight Charges

• Total Invoice Amount Due

Invoices not sent to the proper address, or not containing the necessary and required information may delay payment. A Contractor whose payments are delayed due to improper invoicing shall make no claim against the Department or the State for late or finance charges.

The Department will make every effort to process payment for the purchase of product within thirty

(30) calendar days after the Department has conducted the necessary reviews, inspections and acceptance as described herein.

The department acceptance date will be the valid date for starting the thirty (30) calendar day payment period.

Payment due dates, including discount periods, will be computed from the date of acceptance or date of correct invoice (whichever is later) to the date the Department’s warrant is mailed.

7. PRICE REDUCTION

A price reduction adjustment may be offered at any time during the term of a contract and shall become effective upon notice through a written contract amendment.

8. CONTRACT ADMINISTRATION

The Contractor shall contact the assigned Procurement Officer for guidance or direction in matters of contract interpretation or questions regarding the terms, conditions or scope of the contract.

9. NOTICES

All notices, requests, demands, consents, approvals, and other communications which may or are required to be served or given hereunder (for the purposes of this provisions collectively called “Notices”), shall be in writing and shall be sent by certified United States mail, return receipt requested, or by any other method that provides evidence of receipt, addressed to the party or parties to receive such notice as follows:

a. If intended for the State, to:

Arizona Department of Transportation, Procurement Group 1655 W. Jackson Street, MD 100P

Phoenix, Arizona 85007-3276

b. If intended for the Contractor, to the address as identified in the Contractor’s electronic vendor profile.

Or to such other address as either party may from time to time furnish in writing to the other by notice hereunder. Any notice so mailed shall be deemed to have been given as of the date such notice is received as shown on the return receipt. Furthermore, such notice may be given by delivering personally such notice, if intended for the State, to the Arizona Department of Transportation, Procurement Officer and, if intended for the Contractor, to the person named on the Offer & Contract Award of this contract, or to such other person as either party may from time to time furnish in writing to the other by notice hereunder. Any notice so delivered shall be deemed to have been given as of the date such notice is personally delivered to the other party.

10. CANCELLATION FOR POSSESSION OF WEAPONS ON ADOT PROPERTY

The Contractor or any subcontractors are prohibited from having weapons in their possession or on their person within the building. Weapons shall be stored securely, consistent with A.R.S. § 13-3118, in the Contractor’s or any subcontractor’s vehicle if there are no storage amenities available at the ADOT facility. This contract may be cancelled if Contractor or any subcontractors or others in the employ or under the supervision of the Contractor or subcontractors is found to be in possession of weapons.

Possession of weapons (firearms, explosive device, knife or blade of more than three inches, or any other instrument designed for lethal or disabling use) is prohibited on ADOT property except in the manner stated above.

Further, if the Contractor or any subcontractors or others in the employ or under the supervision of the Contractors or subcontractors are asked by an ADOT official to leave the ADOT property, they are advised that failure to comply with such a request shall result in cancellation of the contract and anyone who refuses, whether armed or not, is subject to prosecution under A.R.S.

§ 13-1502, "Criminal trespass in the third degree; classification."

11. REVIEW OF CONTRACTOR’S WORK

Work performed by the Contractor shall be subject to periodic reviews and partial acceptance at various stages. The Department reserves the right to make such reviews and pass upon the acceptability of the Contractor’s work. Partial acceptance shall not relieve the Contractor’s obligation to correct, without charge, any errors in the work performed under this contract.

12. ACCURACY OF WORK

The Contractor shall be responsible for the accuracy of the work and shall promptly make all the necessary revisions or corrections resulting from errors and omissions on the part of the Contractor without additional compensation. Acceptance of the work by the Department shall not relieve the Contractor of the responsibility for subsequent correction of any such errors and clarification of ambiguities.

13. WARRANTY

Excluded

14. INDEMNIFICATION CLAUSE

To the fullest extent permitted by law, Contractor shall defend, indemnify, and hold harmless the State of Arizona, and its departments, agencies, boards, commissions, universities, officers, officials, agents, and employees (hereinafter referred to as “Indemnitee”) from and against any and all claims, actions, liabilities, damages, losses, or expenses (including court costs, attorneys’ fees, and costs of claim processing, investigation and litigation) (hereinafter referred to as “Claims”) for bodily injury or personal injury (including death), or loss or damage to tangible or intangible property caused, or alleged to be caused, in whole or in part, by the negligent or willful acts or omissions of Contractor or any of its owners, officers, directors, agents, employees or subcontractors. This indemnity includes any claim or amount arising out of, or recovered under, the Workers’ Compensation Law or arising out of the failure of such Contractor to conform to any federal, state, or local law, statute, ordinance, rule, regulation, or court decree. It is the specific intention of the parties that the Indemnitee shall, in all instances, except for Claims arising solely from the negligent or willful acts or omissions of the Indemnitee, be indemnified by Contractor from and against any and all claims. It is agreed that Contractor will be responsible for primary loss investigation, defense, and judgment costs where this indemnification is applicable. In consideration of the award of this contract, the Contractor agrees to waive all rights of subrogation against the State of Arizona, its officers, officials, agents, and employees for losses arising from the work performed by the Contractor for the State of Arizona.

This indemnity shall not apply if the contractor or sub-contractor(s) is/are an agency, board, commission or university of the State of Arizona.

the fullest extent permitted by law, Contractor shall defend, indemnify, and hold harmless the State of Arizona, and its departments, agencies, boards, commissions, universities, officers, officials, agents, and employees (hereinafter referred to as “Indemnitee”) from and against any and all claims, actions, liabilities, damages, losses, or expenses (including court costs, attorneys’ fees, and costs of claim processing, investigation and litigation) (hereinafter referred to as “Claims”) for bodily injury or personal injury (including death), or loss or damage to tangible or intangible property caused, or alleged to be caused, in whole or in part, by the negligent or willful acts or omissions of Contractor or any of its owners, officers, directors, agents, employees or subcontractors. This indemnity includes any claim or amount arising out of, or recovered under, the Workers’ Compensation Law or arising out of the failure of such Contractor to conform to any federal, state, or local law, statute, ordinance, rule, regulation, or court decree. It is the specific intention of the parties that the Indemnitee shall, in all instances, except for Claims arising solely from the negligent or willful acts or omissions of the Indemnitee, be indemnified by Contractor from and against any and all claims. It is agreed that Contractor will be responsible for primary loss investigation, defense, and judgment costs where this indemnification is applicable. In consideration of the award of this contract, the Contractor agrees to waive all rights of subrogation against the State of Arizona, its officers, officials, agents, and employees for losses arising from the work performed by the Contractor for the State of Arizona.

This indemnity shall not apply if the contractor or sub-contractor(s) is/are an agency, board, commission or university of the State of Arizona.

15. Insurance Requirements

The Contractor shall furnish Certificate(s) of Insurance inclusive of the following requirements to the Department. Certificate(s) shall be received within five (5) calendar days of notification of contract award by the Procurement Officer.

Contractor and subcontractors shall procure and maintain, until all of their obligations have been discharged, including any warranty periods under this Contract, insurance against claims for injury to persons or damage to property arising from, or in connection with, the performance of the work hereunder by the Contractor, its agents, representatives, employees or subcontractors.

The Insurance Requirements herein are minimum requirements for this Contract and in no way limit the indemnity covenants contained in this Contract. The State of Arizona in no way warrants that the minimum limits contained herein are sufficient to protect the Contractor from liabilities that arise out of the performance of the work under this Contract by the Contractor, its agents, representatives, employees or subcontractors, and the Contractor is free to purchase additional insurance.

A. Minimum Scope and Limits of Insurance

Contractor shall provide coverage with limits of liability not less than those stated below.

1.A.1 Commercial General Liability (CGL) – Occurrence Form

Policy shall include bodily injury, property damage, and broad form contractual liability coverage.

• General Aggregate $2,000,000

• Products – Completed Operations Aggregate $1,000,000

• Personal and Advertising Injury $1,000,000

• Damage to Rented Premises $50,000

• Each Occurrence $1,000,000

a. The policy shall be endorsed, as required by this written agreement, to include the State of Arizona, and its departments, agencies, boards, commissions, universities, officers, officials, agents, and employees as additional insureds with respect to liability arising out of the activities performed by or on behalf of the Contractor.

b. Policy shall contain a waiver of subrogation endorsement, as required by this written agreement, in favor of the State of Arizona, and its departments, agencies, boards, commissions, universities, officers, officials, agents, and employees for losses arising from work performed by or on behalf of the Contractor.

1.A.2 Business Automobile Liability

Bodily Injury and Property Damage for any owned, hired, and/or non- owned automobiles used in the performance of this Contract.

• Combined Single Limit (CSL) $1,000,000

a. Policy shall be endorsed, as required by this written agreement, to include the State of Arizona, and its departments, agencies, boards, commissions, universities, officers, officials, agents, and employees as additional insureds with respect to liability arising out of the activities performed by, or on behalf of, the Contractor involving automobiles owned, hired and/or non-owned by the Contractor.

b. Policy shall contain a waiver of subrogation endorsement as required by this written agreement in favor of the State of Arizona, and its departments, agencies, boards, commissions, universities, officers, officials, agents, and employees for losses arising from work performed by or on behalf of the Contractor.

1.A.3 Workers’ Compensation and Employers’ Liability

• Workers' Compensation Statutory

• Employers' Liability o Each Accident $1,000,000 o Disease – Each Employee $1,000,000 o Disease – Policy Limit $1,000,000

a. Policy shall contain a waiver of subrogation endorsement, as required by this written agreement, in favor of the State of Arizona, and its departments, agencies, boards, commissions, universities, officers, officials, agents, and employees for losses arising from work performed by or on behalf of the Contractor.

b. This requirement shall not apply to each Contractor or subcontractor that is exempt under A.R.S. § 23-901, and when such Contractor or subcontractor executes the appropriate waiver form (Sole Proprietor or Independent Contractor).

B. Additional Insurance Requirements

The policies shall include, or be endorsed to include, as required by this written agreement, the following provisions:

1.B.1 The Contractor's policies, as applicable, shall stipulate that the insurance afforded the Contractor shall be primary and that any insurance carried by the Department, its agents, officials, employees or the State of Arizona shall be excess and not contributory insurance, as provided by A.R.S. § 41-621 (E).

1.B.2 Insurance provided by the Contractor shall not limit the Contractor’s liability assumed under the indemnification provisions of this Contract.

C. Notice of Cancellation

Applicable to all insurance policies required within the Insurance Requirements of this Contract, Contractor’s insurance shall not be permitted to expire, be suspended, be canceled, or be materially changed for any reason without thirty (30) days prior written notice to the State of Arizona. Within two (2) business days of receipt, Contractor must provide notice to the State of Arizona if they receive notice of a policy that has been or will be suspended, canceled, materially changed for any reason, has expired, or will be expiring. Such notice shall be sent directly to the Department and shall be mailed, emailed, hand delivered or sent by facsimile transmission to (State Representative’s Name, Address & Fax Number).

D. Acceptability of Insurers

Contractor’s insurance shall be placed with companies licensed in the State of Arizona or hold approved non-admitted status on the Arizona Department of Insurance List of Qualified Unauthorized Insurers. Insurers shall have an “A.M. Best” rating of not less than A- VII. The State of Arizona in no way warrants that the above-required minimum insurer rating is sufficient to protect the Contractor from potential insurer insolvency.

E. Verification of Coverage

Contractor shall furnish the State of Arizona with certificates of insurance (valid ACORD form or equivalent approved by the State of Arizona) evidencing that Contractor has the insurance as required by this Contract. An authorized representative of the insurer shall sign the certificates.

1.E.1 All such certificates of insurance and policy endorsements must be received by the

State before work commences. The State’s receipt of any certificates of insurance or policy endorsements that do not comply with this written agreement shall not waive or otherwise affect the requirements of this agreement.

1.E.2 Each insurance policy required by this Contract must be in effect at, or prior to, commencement of work under this Contract. Failure to maintain the insurance policies as required by this Contract, or to provide evidence of renewal, is a material breach of contract.

1.E.3 All certificates required by this Contract shall be sent directly to the Department.

The State of Arizona project/contract number and project description shall be noted on the certificate of insurance. The State of Arizona reserves the right to require complete copies of all insurance policies required by this Contract at any time.

F. Subcontractors

Contractor’s certificate(s) shall include all subcontractors as insureds under its policies or Contractor shall be responsible for ensuring and/or verifying that all subcontractors have valid and collectable insurance as evidenced by the certificates of insurance and endorsements for each subcontractor. All coverages for subcontractors shall be subject to the minimum Insurance Requirements identified above. The Department reserves the right to require, at any time throughout the life of this contract, proof from the Contractor that its subcontractors have the required coverage.

G. Approval and Modifications

The Contracting Agency, in consultation with State Risk, reserves the right to review or make modifications to the insurance limits, required coverages, or endorsements throughout the life of this contract, as deemed necessary. Such action will not require a formal Contract amendment but may be made by administrative action.

H. Exceptions

In the event the Contractor or subcontractor(s) is/are a public entity, then the Insurance Requirements shall not apply. Such public entity shall provide a certificate of self-insurance. If the Contractor or subcontractor(s) is/are a State of Arizona agency, board, commission, or university, none of the above shall apply.

16. SUBCONTRACTORS

It is essential that the Contractor provides adequate experienced subcontractors, capable of and devoted to the successful accomplishment of work to be performed under this contract.

The Contractor agrees that, once assigned to work under this contract, subcontractors shall not be removed or replaced without written notice to the Procurement Officer. The Contractor shall immediately notify the Procurement Officer of subcontractor changes. Replacement subcontractors shall have substantially similar qualifications and experience. All subcontractor changes are subject to the written concurrence of the Procurement Officer prior to any billable work being performed.

17. REMOVAL OF CONTRACTOR’S EMPLOYEES

The Contractor agrees to utilize only experienced, responsible and capable personnel in the performance of the work. The Department may require that the Contractor remove from the job covered by this contract, employees who endanger persons or property or whose continued employment under the contract is inconsistent with the interest of the Department.

18. PROJECT ADMINISTRATION

The Project Manager shall be designated at the time of project assignment. The Project Manager will provide general direction as necessary and be responsible for decisions pertaining to work under this Contract.

19. LICENSES, PERMITS, CERTIFICATIONS

Contractor, at their expense, shall maintain in current status without any violations, complaints, or suspensions during the term of this contract all Federal, State and Local licenses, permits and certifications required for the operation of a business conducted by the contractor.

20. POST AWARD MEETING

At the discretion of the Department, the Contractor, at their expense, shall attend and participate in post award meetings as scheduled by the Procurement Officer.

21. Contract Order of Precedence

In the event of a conflict in the provisions of this Solicitation, the following shall prevail in the order set forth below:

• Federal Terms & Conditions;

• Special Terms and Conditions;

• Uniform Terms and Conditions;

• Statement or Scope of Work;

• Specifications;

• Attachments;

• Exhibits;

• Special Instructions to Offerors;

• Uniform Instructions to Offerors; and

• Other documents referenced or included in the Solicitation

UNIFORM TERMS AND CONDITIONS

1. Definition of Terms. As used in this Solicitation and any resulting Contract, the terms listed below are defined as follows:

1.1. “AI” means the science and engineering of making machines capable of performing tasks that are typically associated with human intelligence, such as learning and problem-solving, and includes without limitation: AI systems, classic AI, external AI, generative AI, and large language model (LLM) AI.

1.2. “Attachment” means any item the Solicitation which requires the Offeror to submit as part of the Offer.

1.3. “Contract” means the combination of the Solicitation, including the Instructions to Offerors, the Uniform and Special Terms and Conditions, and the Specifications and Statement or Scope of Work; the Offer and any Best and Final Offers; and any Solicitation Amendments or Contract Amendments.

1.4. "Contract Amendment" means a written document signed by the Procurement Officer that is issued for the purpose of making changes in the Contract.

1.5. “Contractor” means any person who has a Contract with the State.

1.6. “Data” means recorded information, regardless of form or the media on which it may be recorded. The term may include technical data and computer software. The term does not include information incidental to contract administration, such as financial, administrative, cost or pricing, or management information.

1.7. “Days” means calendar days unless otherwise specified.

1.8. “Exhibit” means any item labeled as an Exhibit in the Solicitation or placed in the Exhibits section of the Solicitation generally containing maps, schematics, examples of reports, or other documents that will be used to perform the requirements of the Scope of Work after contract award.

1.9. “Gratuity” means a payment, loan, subscription, advance, deposit of money, services, or anything of more than nominal value, present or promised, unless consideration of substantially equal or greater value is received.

1.10. “Materials” means all property, including equipment, supplies, printing, insurance and leases of property but does not include land, a permanent interest in land or real property or leasing space.

1.11. “Procurement Officer” means the person, or his or her designee, duly authorized by the State to enter into and administer Contracts and make written determinations with respect to the Contract.

1.12. “Services” means the furnishing of labor, time or effort by a Contractor or Subcontractor which does not involve the delivery of a specific end product other than required reports and performance, but does not include employment agreements or collective bargaining agreements.

1.13. “State” means any department, commission, council, board, bureau, committee, institution, agency, government corporation or other establishment or official of the executive branch or corporation commission of the State of Arizona that executes the Contract.

1.14. “State Fiscal Year” means the period beginning with July 1 and ending June 30.

1.15. “Subcontract” means any Contract, express or implied, between the Contractor and another party or between a Subcontractor and another party delegating or assigning, in whole or in part, the making or furnishing of any Materials or any Services required for the performance of the Contract.

1.16. “Subcontractor” means a person who contracts to perform work or render Services to a Contractor or to another Subcontractor as a part of a Contract with the State.

2. Contract Interpretation

2.1. Arizona Law. The Arizona law applies to this Contract including, where applicable, the Uniform Commercial Code as adopted by the State of Arizona and the Arizona Procurement Code, Arizona Revised Statutes (A.R.S.) Title 41, Chapter 23, and its implementing rules, Arizona Administrative Code (A.A.C.) Title 2, Chapter 7.

2.2. Implied Contract Terms. Each provision of law and any terms required by law to be in this Contract are a part of this Contract as if fully stated in it.

2.3. Contract Order of Precedence. In the event of a conflict in the provisions of the Contract, as accepted by the State and as they may be amended, the following shall prevail in the order set forth below:

2.3.1. Special Terms and Conditions;

2.3.2. Uniform Terms and Conditions;

2.3.3. Statement or Scope of Work;

2.3.4. Specifications;

2.3.5. Attachments;

2.3.6. Exhibits; then

2.3.7. Any other documents referenced or included in the Solicitation including, but not limited to, any Bid or Offer documents provided by the Contractor that do not fall into one of the above categories.

2.4. Relationship of Parties. The Contractor under this Contract is an independent

Contractor. Neither party to this Contract shall be deemed to be the employee or agent of the other party to the Contract.

2.5. Severability. The provisions of this Contract are severable. Any term or condition deemed illegal or invalid shall not affect any other term or condition of the Contract.

2.6. No Parol Evidence. This Contract is intended by the parties as a final and complete expression of their agreement. No course of prior dealings between the parties and no usage of the trade shall supplement or explain any terms used in this document and no other understanding either oral or in writing shall be binding.

2.7. No Waiver. Either party’s failure to insist on strict performance of any term or condition of the Contract shall not be deemed a waiver of that term or condition even if the party accepting or acquiescing in the nonconforming performance knows of the nature of the performance and fails to object to it.

3. Contract Administration and Operation

3.1. Records. Under A.R.S. § 35-214 and § 35-215, the Contractor shall retain and shall contractually require each Subcontractor to retain any and all Data and other “records” relating to the acquisition and performance of the Contract for a period of five (5) years after the completion of the Contract. All records shall be subject to inspection and audit by the State at reasonable times. Upon request, the Contractor shall produce a legible copy of any or all such records.

3.2. Non-Discrimination. The Contractor shall comply with State Executive Orders Nos.

2023-09, 2023-01, 2009-09, and any and all other applicable Federal and State laws, rules and regulations, including the Americans with Disabilities Act. Contractor shall include these provision in contracts with Subcontractors when required by Federal or State law.

3.3. Audit. Pursuant to A.R.S. § 35-214, at any time during the term of this Contract and five (5) years thereafter, the Contractor’s or any Subcontractor’s books and records shall be subject to audit by the State and, where applicable, the Federal Government, to the extent that the books and records relate to the performance of the Contract or Subcontract.

3.4. Facilities Inspection and Materials Testing. The Contractor agrees to permit access to its facilities, Subcontractor facilities, and the Contractor’s processes or services, at reasonable times for inspection of the facilities or Materials covered under this Contract as required under A.R.S. § 41-2547. The State shall also have the right to test, at its own cost, the Materials to be supplied under this Contract. Neither inspection of the Contractor’s facilities nor Materials testing shall constitute final acceptance of the Materials or Services. If the State determines non-compliance of the Materials, the Contractor shall be responsible for the payment of all costs incurred by the State for testing and inspection.

3.5. Notices. Notices to the Contractor required by this Contract shall be made by the State to the person indicated on the Offer and Acceptance form submitted by the Contractor unless otherwise stated in the Contract. Notices to the State required by the Contract shall be made by the Contractor to the Solicitation Contact Person indicated on the Solicitation, stated in the Contract, or listed on the State’s eProcurement system. An authorized Procurement Officer and an authorized Contractor representative may change their respective person to whom notice shall be given by written notice to the other and an amendment to the Contract shall not be necessary.

3.6. Advertising, Publishing and Promotion of Contract. The Contractor shall not use, advertise or promote information for commercial benefit concerning this Contract without the prior written approval of the Procurement Officer.

3.7. Continuous Improvement. Contractor shall recommend continuous improvements on an on-going basis in relation to any Materials and Services offered under the Contract, with a view to reducing State costs and improving the quality and efficiency of the provision of Materials or Services. State may require Contractor to engage in continuous improvements throughout the term of the Contract.

3.8. Other Contractors. State may undertake on its own or award other contracts to the same or other suppliers for additional or related work. In such cases, the Contractor shall cooperate fully with State employees and such other suppliers and carefully coordinate, fit, connect, accommodate, adjust, or sequence its work to the related work by others. Where the Contract requires handing-off Contractor’s work to others, Contractor shall cooperate as State instructs regarding the necessary transfer of its work product, Materials, Services, or records to State or the other suppliers.

Contractor shall not commit or permit any act that interferes with the State’s or other suppliers’ performance of their work, provided that, State shall enforce the foregoing section equitably among all its suppliers so as not impose an unreasonable burden on any one of them.

3.9. Ownership of Intellectual Property

3.9.1. Rights In Work Product. All intellectual property originated or prepared by Contractor pursuant to the Contract, including but not limited to, inventions, discoveries, intellectual copyrights, trademarks, trade names, trade secrets, technical communications, records reports, computer programs and other documentation or improvements thereto, including Contractor’s administrative communications and records relating to the Contract, are considered work product and Contractor’s property, provided that, State has Government Purpose Rights to that work product as and when it was delivered to State.

3.9.2. “Government Purpose Rights” are:

3.9.2.1. the unlimited, perpetual, irrevocable, royalty free, non-exclusive, worldwide right to use, modify, reproduce, release, perform, display, sublicense, disclose and create derivatives from that work product without restriction for any activity in which State is a party;

3.9.2.2. the right to release or disclose that work product to third parties for any State government purpose; and

3.9.2.3. the right to authorize those to whom it rightfully releases or discloses that work product to use, modify, release, create derivative works from the work product for any State government purpose; such recipients being understood to include the federal government, the governments of other states, and various local governments.

3.9.3. “Government Purpose Rights” do not include any right to use, modify, reproduce, perform, release, display, create derivative works from or disclose that work product for any commercial purpose, or to authorize others to do so.

3.9.4. Joint Developments. The Contractor and State may each use equally any ideas, concepts, know-how, or techniques developed jointly during the course of the Contract, and may do so at their respective discretion, without obligation of…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .