CTR076160_Pricing.xlsx
XLSX spreadsheet 166 KB Posted
- Attached to
- Master Agreement AZ|CTR076160
- Contract number
- CTR076160
- Issued by
- Arizona
About this file
This document appears to be a detailed pricing spreadsheet for a state and local contract indefinite delivery vehicle for Operational Support Services, specifically covering the state of Arizona. The contractor indicates coverage for Region 4, which includes Maricopa, Pinal, and Gila Counties. The document is structured as a comprehensive pricing submission for various service categories, with a focus on providing labor rates and additional service details for potential government procurement.
The contract covers six primary service categories: General Contracting, Appliance Repair, Carpentry Repair, Plumbing Repair, Concrete Repair, and Pressure Washing. Labor rates are specified for each category, with base rates ranging from $85 to $185 per hour. The contractor provides estimated annual quantities and extended amounts for each service, totaling $250,000 across all categories. Additional fees include specialized services like architecture/engineering design at $350/hour, concrete mason at $105/hour, and various markup provisions such as 28% overhead/profit on supplied materials. The pricing structure allows for different labor rates during standard hours, overtime, weekends, and holidays, with specific provisions for return trips and rescheduling.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 5-Trade Secrets.pdf | ||
| ACCEPTED CTR076160 GL,AL,WC 10.14.25-12.05.25.pdf | ||
| 5-Boycott of Israel.pdf | ||
| 5-Offer and Acceptance.pdf | ||
| 5-Price Increase Percentages.pdf | ||
| 5-Sub List 1.pdf | ||
| CTR076160_Contract_Amendment_1.pdf | ||
| CTR076160_Contract_Documents.pdf | ||
| 5-Forced Labor.pdf | ||
| 5-Price_List_per_Amendment_Four__4_.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions - (Read First) BPM006656 On-Call Operational Support Services Instructions for Pricing Sheet attachment:
The pricing sheet is made up of General Contracting Rates, Appliance Repair Rates, Capentry Rates, Plumbing Repair, Concrete Repair, Pressure Washing Rates, Materials/ Parts Pricing, any aditional fees which coincide with the tabs listed below.
Additionally, the Contractor shall indicate which regions they cover for the services that are being offered.
The Offeror must enter the total for each Evaluation section in the corresponding line items tab in APP.
General Information General Information
Instructions: General Information, This page includes two sections that must be completed by the Contractor.
1. The Contractor shall mark any Services that are being offered with their submittal.
2. The Contractor shall indicate what service Coverage areas are being offered. Any exceptions to those areas must be listed in the notes field.
| 1. The Contractor may provide goods/services described in any or all of the Services listed below. The Contractor shall indicate the Services with an (X) that are being offered: | |
| Service: | Mark (X) |
| General Contracting | X |
| Appliance Repair | X |
| Capentry Repair | X |
| Plumbing Repair | X |
| Concrete Repair | X |
| Pressure Washing | X |
| Instructions: Covered Region Areas being Offered, The Contractor shall mark all coverage areas by Regions as noted on the map that are included in the Contractors submission. Any exceptions to those areas must be listed in the notes field. | ||
| Yes or No (Y or N) | Covered Region Areas | Notes |
| Region 1 (Mohave County) | N | |
| Region 2 (La Paz and Yuma Counties) | N | |
| Region 3 (Coconino and Yavapai Counties) | N | |
| Region 4 (Maricopa, Pinal and Gila Counties) | Y | |
| Region 5 (Navajo and Apache Counties) | N | |
| Region 6 (Graham, Greenlee and Cochise Counties) | N | |
| Region 7 (Pima and Santa Cruz Counties) | N |
General Contracting Labor Rates General Contracting Labor Rates
Instructions: General Contracting Labor Rates , The Contractor shall provide labor rates for any labor levels that may be applicable to the service being offered. This Tab is to include any labor classifications that do not fall under Appliance Repair, Carpentry, Plumbing, Concrete or Pressure Washing. Labor rates may include Supervisor, Emergency After Hours, etc. Any labor rates shall be listed below. The General Contracting labor rate will be used for evaluation purposes.
Contractor shall enter the total amount in row 9 to Line #1 in APP under the line items tab.
| Base Labor | Estimated Annual Quantity | Rate per Hour ($) | Extended Amount (Rate X QTY) |
| General Contracting Labor Rate | 2000 | $ 95.00 | $ 190,000.00 |
| Total amount to be entered into Line #1 in the APP Line Items tab | $ 190,000.00 | ||
| Additional Labor Rate Clasifications/Description | Rate per Hour | Notes | |
| Estimator (investigate site if needed, office to office | $ 95.00 | ||
| (does not include preparing the quote) just travel | $ | ||
| $ | |||
| $ | |||
| $ | |||
| $ | |||
| $ | |||
| $ | |||
| $ | |||
| $ |
Appliance Labor Rates Small Appliance Labor Rates
Instructions: Small Appliance Labor Rates , The Contractor shall provide labor rates for any labor levels that may be applicable to the service being offered. This may include Supervisor, Emergency After Hours, etc. Any labor rates shall be listed below. The Technician labor rate will be used for evaluation purposes.
Contractor shall enter the total amount in row 9 to Line #2 in APP under the line items tab.
| Base Labor | Estimated Annual Quantity | Rate per Hour ($) | Extended Amount (Rate X QTY) |
| Small Appliance Technician Labor Rate | 100 | $ 140.00 | $ 14,000.00 |
| Total Small Appliance amount to be entered into line 2 in the Items tab in APP. | $ 14,000.00 | ||
| Additional Labor Rate Clasifications/Description | Rate per Hour | Notes | |
| $ | |||
| $ | |||
| $ | |||
| $ | |||
| $ | |||
| $ | |||
| $ | |||
| $ | |||
| $ | |||
| $ |
Carpentry Labor Rates Carpentry Labor Rates
Instructions: Carpentry Labor Rates , The Contractor shall provide labor rates for any labor levels that may be applicable to the service being offered. This may include Supervisor, Emergency After Hours, etc. Any labor rates shall be listed below. The Base Carpentry labor rate will be used for evaluation purposes.
Contractor shall enter the total amount in row 8 to Line #3 in APP under the line items tab.
| Base Labor | Estimated Annual Quantity | Rate per Hour ($) | Extended Amount (Rate X QTY) |
| Base Carpentry Labor Rate | 100 | $ 85.00 | $ 8,500.00 |
| Total Carpentry amount to be entered into line 3 in the Items tab in APP. | $ 8,500.00 |
| Additional Labor Rate Clasifications/Description | Rate per Hour | Notes |
| General laborer | $ 75.00 | |
| $ | ||
| $ | ||
| $ | ||
| $ | ||
| $ | ||
| $ | ||
| $ | ||
| $ | ||
| $ |
Plumbing Repairs Labor Rate Plumbing Service Labor Rates
Instructions: Plumbing Service Labor Rates , The Contractor shall provide labor rates for any labor levels that may be applicable to the service being offered. This may include Supervisor, Emergency After Hours, etc. Any labor rates shall be listed below. The Plumbing Technician labor rate will be used for evaluation purposes.
Contractor shall enter the total amount in row 8 to Line #4 in APP under the line items tab.
| Base Labor | Estimated Annual Quantity | Rate per Hour ($) | Extended Amount (Rate X QTY) |
| Plumbing Technician Labor Rate | 100 | $ 185.00 | $ 18,500.00 |
| Total Plumbing Technician amount to be entered into line 4 in the Items tab in APP. | $ 18,500.00 |
| Additional Labor Rate Clasifications/Description | Rate per Hour | Notes |
| $ | ||
| $ | ||
| $ | ||
| $ | ||
| $ | ||
| $ | ||
| $ | ||
| $ | ||
| $ | ||
| $ |
Concrete Labor Rates Concrete Services Labor Rates
Instructions: Concrete Service Labor Rates , The Contractor shall provide labor rates for any labor levels that may be applicable to the service being offered. This may include Supervisor, Emergency After Hours, etc. Any labor rates shall be listed below. The Concrete Service labor rate will be used for evaluation purposes.
Contractor shall enter the total amount in row 8 to Line #5 in APP under the line items tab.
| Base Labor | Estimated Annual Quantity | Rate per Hour ($) | Extended Amount (Rate X QTY) |
| Concrete Service Labor Rate | 100 | $ 105.00 | $ 10,500.00 |
| Total Concrete Service amount to be entered into line 5 in the Items tab in APP. | $ 10,500.00 |
| Additional Labor Rate Clasifications/Description | Rate per Hour | Notes |
| $ | ||
| $ | ||
| $ | ||
| $ | ||
| $ | ||
| $ | ||
| $ | ||
| $ | ||
| $ | ||
| $ |
Presser Washing Labor Rates Pressure Washing Services Labor Rates
Instructions: Pressure Washing Service Labor Rates , The Contractor shall provide labor rates for any labor levels that may be applicable to the service being offered. This may include Supervisor, Emergency After Hours, etc. Any labor rates shall be listed below. The Pressure Washing Services labor rate will be used for evaluation purposes.
Contractor shall enter the total amount in row 8 to Line #6 in APP under the line items tab.
| Base Labor | Estimated Annual Quantity | Rate per Hour ($) | Extended Amount (Rate X QTY) |
| Pressure Washing Service Labor Rate | 100 | $ 85.00 | $ 8,500.00 |
| Total Pressure Washing Service amount to be entered into line 5 in the Items tab in APP. | $ 8,500.00 |
| Additional Labor Rate Clasifications/Description | Rate per Hour | Notes |
| $ | ||
| $ | ||
| $ | ||
| $ | ||
| $ | ||
| $ | ||
| $ | ||
| $ | ||
| $ | ||
| $ |
Materials - Parts Materials/Parts Pricing
Instructions: For Materials/Parts used in Operational Support Services, The Contractor shall provide pricing structures for each classification/manufacture of materials/parts that may be used in any Service outlined in the Scope of Work. For each classification offered, include at a minimum, manufacturer’s name and or classification and the associated pricing structure (% discount off of list, cost plus etc. i.e.: All Materials 30%) that may be applicable. Additionally, the Contractor shall provide evaluation pricing in the table to the right labeled Evaluation Pricing. Evalaution Pricing: The contractor shall provide pricing for the listed evaluation Materials/parts. The pricing provided for the evaluation materials/parts will be used in evaluation.
Contractor shall enter the total amounts in row 10 to Line #7 in APP under the line items tab.
| Classification/Manufacturer (Delta, Kwikset, Dow, Rmax, Armstrong, etc.) | Pricing Structure (% discount off of List, Cost Plus Etc.) | Evaluation Materials/Parts | Amount $ (EA) | Quantity | Extended Amount RateX Usage |
| no discounts on material | Cabinet Pull Bar -European Style, 3 in. (76 mm) Center-to-Center Satin Nickel | $ 65.00 | 2 | $ 130.00 | |
| Delta Style or Equal Foundations 2-Handle Standard Goose Neck Kitchen Faucet in Chrome | $ 260.00 | 2 | $ 520.00 | ||
| Total Parts amount to be entered into Line #7 in the APP Line Items tab | |||||
| $ 650.00 |
Additional Items Additional Fees
Instructions: Additional Fees, The Contractor shall list any additional fees that may be applicable to Operational Support Services that are not covered under Labor Rates and or Materials/Parts.
| Additional Fees Description: | Fee |
| Architecture/Engineering Design | $350.00/hr |
| Concrete Mason | $105.00/hr |
| Mason | $140.00/hr |
| Metal Fabrication | $150.00/hr |
| Garage Door technician | $165.00/hr |
| Fencing and Gate Repairs | $125.00/hr |
| All supplied material/rental equipment/ | |
| specialities will be marked up at | 28% OH/Profit |
| Overtime | labor at time and a half |
| Weekends | labor at time and a half |
| Holidays | labor at double time |
| Working hours 7:00am-4:00pm | |
| Return trips will be an additiona cost of | $250.00/trip |
| Rescheduling at the site by occupant | $250.00/trip |
image1.png
File details come from the government source that posted it. Updated .