5-Price_List_per_Amendment_Four__4_.xlsx

XLSX spreadsheet 166 KB Posted

Attached to
Master Agreement AZ|CTR076160
Contract number
CTR076160
Issued by
Arizona

About this file

This document is a Price List per Amendment Four for an On-Call Operational Support Services contract, specifically covering services in Arizona. The contractor has indicated service coverage for Region 4, which includes Maricopa, Pinal, and Gila Counties, and offers multiple service categories including General Contracting, Appliance Repair, Carpentry Repair, Plumbing Repair, Concrete Repair, and Pressure Washing.

The contract includes detailed labor rates for each service category, with base rates ranging from $85 to $185 per hour depending on the specific service. The estimated annual quantities for these services vary, with General Contracting having the highest at 2,000 hours. Additional fees are outlined, including specialized services like Architecture/Engineering Design at $350/hour and specific trade rates such as Concrete Mason at $105/hour. The pricing structure includes material markup at 28% overhead/profit, with overtime and weekend rates at time and a half, and holiday rates at double time. Evaluation pricing for materials/parts is also provided, with specific examples like cabinet pulls and kitchen faucets, totaling $650 for the evaluation materials.

View the file

Other files

File Type Posted
5-Trade Secrets.pdf PDF
5-Forced Labor.pdf PDF
ACCEPTED CTR076160 GL,AL,WC 10.14.25-12.05.25.pdf PDF
CTR076160_Pricing.xlsx XLSX spreadsheet
5-Boycott of Israel.pdf PDF
5-Offer and Acceptance.pdf PDF
5-Price Increase Percentages.pdf PDF
5-Sub List 1.pdf PDF
CTR076160_Contract_Amendment_1.pdf PDF
CTR076160_Contract_Documents.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions - (Read First) BPM006656 On-Call Operational Support Services Instructions for Pricing Sheet attachment:

The pricing sheet is made up of General Contracting Rates, Appliance Repair Rates, Capentry Rates, Plumbing Repair, Concrete Repair, Pressure Washing Rates, Materials/ Parts Pricing, any aditional fees which coincide with the tabs listed below.

Additionally, the Contractor shall indicate which regions they cover for the services that are being offered.

The Offeror must enter the total for each Evaluation section in the corresponding line items tab in APP.

General Information General Information

Instructions: General Information, This page includes two sections that must be completed by the Contractor.

1. The Contractor shall mark any Services that are being offered with their submittal.

2. The Contractor shall indicate what service Coverage areas are being offered. Any exceptions to those areas must be listed in the notes field.

1. The Contractor may provide goods/services described in any or all of the Services listed below. The Contractor shall indicate the Services with an (X) that are being offered:
Service:Mark (X)
General ContractingX
Appliance RepairX
Capentry RepairX
Plumbing RepairX
Concrete RepairX
Pressure WashingX
Instructions: Covered Region Areas being Offered, The Contractor shall mark all coverage areas by Regions as noted on the map that are included in the Contractors submission. Any exceptions to those areas must be listed in the notes field.
Yes or No (Y or N)Covered Region AreasNotes
Region 1 (Mohave County)N
Region 2 (La Paz and Yuma Counties)N
Region 3 (Coconino and Yavapai Counties)N
Region 4 (Maricopa, Pinal and Gila Counties)Y
Region 5 (Navajo and Apache Counties)N
Region 6 (Graham, Greenlee and Cochise Counties)N
Region 7 (Pima and Santa Cruz Counties)N

General Contracting Labor Rates General Contracting Labor Rates

Instructions: General Contracting Labor Rates , The Contractor shall provide labor rates for any labor levels that may be applicable to the service being offered. This Tab is to include any labor classifications that do not fall under Appliance Repair, Carpentry, Plumbing, Concrete or Pressure Washing. Labor rates may include Supervisor, Emergency After Hours, etc. Any labor rates shall be listed below. The General Contracting labor rate will be used for evaluation purposes.

Contractor shall enter the total amount in row 9 to Line #1 in APP under the line items tab.

Base LaborEstimated Annual QuantityRate per Hour ($)Extended Amount (Rate X QTY)
General Contracting Labor Rate2000$ 95.00$ 190,000.00
Total amount to be entered into Line #1 in the APP Line Items tab$ 190,000.00
Additional Labor Rate Clasifications/DescriptionRate per HourNotes
Estimator (investigate site if needed, office to office$ 95.00
(does not include preparing the quote) just travel$
$
$
$
$
$
$
$
$

Appliance Labor Rates Small Appliance Labor Rates

Instructions: Small Appliance Labor Rates , The Contractor shall provide labor rates for any labor levels that may be applicable to the service being offered. This may include Supervisor, Emergency After Hours, etc. Any labor rates shall be listed below. The Technician labor rate will be used for evaluation purposes.

Contractor shall enter the total amount in row 9 to Line #2 in APP under the line items tab.

Base LaborEstimated Annual QuantityRate per Hour ($)Extended Amount (Rate X QTY)
Small Appliance Technician Labor Rate100$ 140.00$ 14,000.00
Total Small Appliance amount to be entered into line 2 in the Items tab in APP.$ 14,000.00
Additional Labor Rate Clasifications/DescriptionRate per HourNotes
$
$
$
$
$
$
$
$
$
$

Carpentry Labor Rates Carpentry Labor Rates

Instructions: Carpentry Labor Rates , The Contractor shall provide labor rates for any labor levels that may be applicable to the service being offered. This may include Supervisor, Emergency After Hours, etc. Any labor rates shall be listed below. The Base Carpentry labor rate will be used for evaluation purposes.

Contractor shall enter the total amount in row 8 to Line #3 in APP under the line items tab.

Base LaborEstimated Annual QuantityRate per Hour ($)Extended Amount (Rate X QTY)
Base Carpentry Labor Rate100$ 85.00$ 8,500.00
Total Carpentry amount to be entered into line 3 in the Items tab in APP.$ 8,500.00
Additional Labor Rate Clasifications/DescriptionRate per HourNotes
General laborer$ 75.00
$
$
$
$
$
$
$
$
$

Plumbing Repairs Labor Rate Plumbing Service Labor Rates

Instructions: Plumbing Service Labor Rates , The Contractor shall provide labor rates for any labor levels that may be applicable to the service being offered. This may include Supervisor, Emergency After Hours, etc. Any labor rates shall be listed below. The Plumbing Technician labor rate will be used for evaluation purposes.

Contractor shall enter the total amount in row 8 to Line #4 in APP under the line items tab.

Base LaborEstimated Annual QuantityRate per Hour ($)Extended Amount (Rate X QTY)
Plumbing Technician Labor Rate100$ 185.00$ 18,500.00
Total Plumbing Technician amount to be entered into line 4 in the Items tab in APP.$ 18,500.00
Additional Labor Rate Clasifications/DescriptionRate per HourNotes
$
$
$
$
$
$
$
$
$
$

Concrete Labor Rates Concrete Services Labor Rates

Instructions: Concrete Service Labor Rates , The Contractor shall provide labor rates for any labor levels that may be applicable to the service being offered. This may include Supervisor, Emergency After Hours, etc. Any labor rates shall be listed below. The Concrete Service labor rate will be used for evaluation purposes.

Contractor shall enter the total amount in row 8 to Line #5 in APP under the line items tab.

Base LaborEstimated Annual QuantityRate per Hour ($)Extended Amount (Rate X QTY)
Concrete Service Labor Rate100$ 105.00$ 10,500.00
Total Concrete Service amount to be entered into line 5 in the Items tab in APP.$ 10,500.00
Additional Labor Rate Clasifications/DescriptionRate per HourNotes
$
$
$
$
$
$
$
$
$
$

Presser Washing Labor Rates Pressure Washing Services Labor Rates

Instructions: Pressure Washing Service Labor Rates , The Contractor shall provide labor rates for any labor levels that may be applicable to the service being offered. This may include Supervisor, Emergency After Hours, etc. Any labor rates shall be listed below. The Pressure Washing Services labor rate will be used for evaluation purposes.

Contractor shall enter the total amount in row 8 to Line #6 in APP under the line items tab.

Base LaborEstimated Annual QuantityRate per Hour ($)Extended Amount (Rate X QTY)
Pressure Washing Service Labor Rate100$ 85.00$ 8,500.00
Total Pressure Washing Service amount to be entered into line 5 in the Items tab in APP.$ 8,500.00
Additional Labor Rate Clasifications/DescriptionRate per HourNotes
$
$
$
$
$
$
$
$
$
$

Materials - Parts Materials/Parts Pricing

Instructions: For Materials/Parts used in Operational Support Services, The Contractor shall provide pricing structures for each classification/manufacture of materials/parts that may be used in any Service outlined in the Scope of Work. For each classification offered, include at a minimum, manufacturer’s name and or classification and the associated pricing structure (% discount off of list, cost plus etc. i.e.: All Materials 30%) that may be applicable. Additionally, the Contractor shall provide evaluation pricing in the table to the right labeled Evaluation Pricing. Evalaution Pricing: The contractor shall provide pricing for the listed evaluation Materials/parts. The pricing provided for the evaluation materials/parts will be used in evaluation.

Contractor shall enter the total amounts in row 10 to Line #7 in APP under the line items tab.

Classification/Manufacturer (Delta, Kwikset, Dow, Rmax, Armstrong, etc.)Pricing Structure (% discount off of List, Cost Plus Etc.)Evaluation Materials/PartsAmount $ (EA)QuantityExtended Amount RateX Usage
no discounts on materialCabinet Pull Bar -European Style, 3 in. (76 mm) Center-to-Center Satin Nickel$ 65.002$ 130.00
Delta Style or Equal Foundations 2-Handle Standard Goose Neck Kitchen Faucet in Chrome$ 260.002$ 520.00
Total Parts amount to be entered into Line #7 in the APP Line Items tab
$ 650.00

Additional Items Additional Fees

Instructions: Additional Fees, The Contractor shall list any additional fees that may be applicable to Operational Support Services that are not covered under Labor Rates and or Materials/Parts.

Additional Fees Description:Fee
Architecture/Engineering Design$350.00/hr
Concrete Mason$105.00/hr
Mason$140.00/hr
Metal Fabrication$150.00/hr
Garage Door technician$165.00/hr
Fencing and Gate Repairs$125.00/hr
All supplied material/rental equipment/
specialities will be marked up at28% OH/Profit
Overtimelabor at time and a half
Weekendslabor at time and a half
Holidayslabor at double time
Working hours 7:00am-4:00pm
Return trips will be an additiona cost of$250.00/trip
Rescheduling at the site by occupant$250.00/trip

image1.png

File details come from the government source that posted it. Updated .