This is a Contract Amendment Summary from the Arizona Department of Transportation (ADOT) in Phoenix, Arizona, involving C&S Construction, Inc. as the contractor for the City of Peoria Adaptive Signal Control Technology (ASCT) System project. The document is Amendment No. 1 to the original contract, issued in November 2024 and processed through ADOT's Risk Management division.

The amendment specifically modifies Section 21.2.4 of the contract's Special Terms and Conditions, reducing the Installation Floater Coverage amount from $2,127,124.00 to $1,640,159.00. The change appears to be related to insurance coverage for the project, which involves an adaptive signal control technology system for the City of Peoria. All other terms, conditions, and provisions of the original contract remain unchanged. The amendment suggests an adjustment in the project's insurance requirements while maintaining the core scope and objectives of the original contract.

View the file

Other files

File Type Posted
CTR074650_Contract_Amendment_Summary2..pdf PDF
CTR074650 Post Award Meeting Sign-In Sheet.docx DOCX document
CTR074650_Contract_Documents.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ARIZONA DEPARTMENT OF TRANSPORTATION

1655 W. Jackson Street, MD 100P

Phoenix, AZ 85007

Contract Amendment Summary CONTRACTOR: C&S Construction, Inc. AMENDMENT NO.: 1 DESCRIPTION: City of Peoria Adaptive Signal Control Technology (ASCT) System

Rev. 11/2024

Pursuant to the Uniform Terms and Conditions, Section 5, Contract Changes, the above referenced contract is amended. Summary of changes is as follows:

1. Per the Approval of Risk Management, the Special terms and Conditions of the above referenced contract, “Section 21.2.4 Installation Floater Coverage amount is $2,127,124.00” is hereby modified as follows:

“Section 21.2.4 Installation Floater Coverage amount is $ 1,640,159.00”

2. All other terms, conditions and provisions of this contract remain unchanged.