CTR069179_Contract_Amendment_Summary_3.pdf
PDF 1 MB Posted
- Attached to
- Master Agreement AZ|CTR069179
- Contract number
- CTR069179
- Issued by
- Arizona
About this file
This document is a Contract Amendment Summary issued by the Arizona Department of Transportation (ADOT), located in Phoenix, Arizona. The amendment involves Southwest Siteworks as the contractor and relates to Amendment Number Three (3) for an existing contract.
The contract covers On-Call Pipelining and Drainage Repair Services. This amendment administratively corrects the contract term to extend the period from December 20, 2024 through December 19, 2025, with provisions for potential termination, cancellation, or extension as specified in the original contract. The amendment was necessitated by an error in a previous contract amendment (Amendment Two), and all other terms, conditions, and provisions of the original contract remain unchanged. The document is marked with a revision date of 03/2025, indicating the current update to the contract's administrative details.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2024 Q2 Usage Report.xlsx | XLSX spreadsheet | |
| 2024 Q4 Usage Report.xlsx | XLSX spreadsheet | |
| 2024 Q1 Usage Report.xlsx | XLSX spreadsheet | |
| CTR069179_Contract_Amendment_Summary_4.pdf | ||
| 2023 Q4 Usage Report.xlsx | XLSX spreadsheet | |
| 2024 Q3 Usage Report.xlsx | XLSX spreadsheet | |
| 2025 Q1 Usage Report.xlsx | XLSX spreadsheet | |
| ACCEPTED_ANY_ALL_GL_AL_WC_CONTRACTORS_POLL_LIAB_07.27.24-13.31.25.pdf | ||
| CTR069179_Contract_Amendment_Summary_One__1_.pdf | ||
| CTR069179_Contract_Amendment_Summary_Two__2_.pdf | ||
| CTR069179_Contract_Documents.pdf | ||
| Ordering_Guidlines_for_Contracts_with_Not_to_Exceed_Pricing.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ARIZONA DEPARTMENT OF TRANSPORTATION
1655 W. Jackson Street, MD 100P
Phoenix, AZ 85007
Contract Amendment Summary CONTRACTOR: Southwest Siteworks AMENDMENT NO.: Three (3)
DESCRIPTION: On-Call Pipelining and Drainage Repair Services
Rev. 03/2025
Pursuant to the Uniform Terms and Conditions, Section 5, Contract Changes, the above referenced contract is amended. Summary of changes is as follows:
1. Due to an error in Contract Amendment Summary Two (2), contract amendment summary three (3) was issued to administratively correct the contract term to December 20, 2024 through December 19, 2025, unless terminated, canceled or extended as otherwise provided in the contract.
2. All other terms, conditions and provisions of this contract remain unchanged.