This document is a Contract Amendment (Amendment No. 5) for Contract No. CTR065769 issued by the Arizona Department of Environmental Quality (ADEQ) for Statewide Lead Service Line Identification and Inventory Services. The contractor is Hazen and Sawyer, a professional engineering and consulting firm specializing in water and environmental services.
The amendment formally adds eight key personnel to the existing contract: Jared Eichmiller, Brixie Guzman-Perez, Taylor Northcott, Angel Ortiz, Jenna Phillips, Clark Safely, Rachel Soh, and Max Sugarman. These professionals have diverse backgrounds in water and wastewater engineering, GIS analysis, data management, and environmental science, with experience in projects involving lead service line inventories, water treatment facility assessments, asset management, and infrastructure planning across multiple California, Arizona, and Colorado municipalities.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Form approved by CPO, Rev. 12-18-2018
CONTRACT
AMENDMENT
CONTRACT NO.: CTR065769
AMENDMENT NO.: 5
TITLE: Statewide Lead Service Line Identification and Inventory Services CONTRACTOR: Hazen and Sawyer
ADEQ PROCUREMENT
1110 W. Washington Street Phoenix, AZ 85007 602-771- 4140
THE PURPOSE OF THIS AMENDMENT IS TO:
In accordance with the Special Terms and Conditions, 5.1 Contract Amendments, this contract is hereby amended as follows:
1. Add the following Contractor Key Personnel to this contract:
1. Jared Eichmiller
2. Brixie Guzman-Perez
3. Taylor Northcott
4. Angel Ortiz
5. Jenna Phillips
6. Clark Safely
7. Rachel Soh
8. Max Sugarman
2. All other Terms and Conditions remain unchanged.
THE ABOVE REFERENCED AMENDMENT IS A
UNILATERAL ACKNOWLEDGEMENT OF
CONTRACTOR’S APPROVED CHANGED
REQUEST.
ARIZONA DEPARTMENT OF ENVIRONMENTAL QUALITY
The above referenced Amendment is hereby executed this 4th day of March, 2025 at Phoenix, Arizona.
Ana Machiche Procurement Officer
Available online at Arizona Procurement Portal (APP) eProcurement System https://app.az.gov https://app.az.gov/
Hazen and Sawyer
Jared Eichmiller
Lead and Copper Rule Revisions, Los Angeles Department of Water and Power, Los Angeles, CA GIS Analyst. Jared is the GIS Analyst for LADWP’s evaluation of historical lead service line use and code reviews, development of an LSL inventory in GIS, use of alternative verification methods (predictive modeling and geospatial statistical analysis), funding assistance, and communications with DDW.
District-Wide Asset Management Plan, El Toro Water District, Lake Forest, CA GIS Analyst. Hazen was selected through a competitive procurement to develop an asset management plan for the El Toro Water District’s Pumping Division, which is responsible for the District’s potable water pump stations, wastewater lift stations, storage tanks, and pressure-reducing valves. The effort included the development of the District’s first ever asset management plan. Key elements of the asset management plan included adopting formal strategies around risk analysis, assigning likelihood and consequence of failure values, and performing staff consultation and field condition assessment to capture key asset condition and performance information. This information was used to identify and prioritize the District’s capital improvement program. Deliverables of the work included an update asset register, written asset management plan, and data visualization dashboard
Master Plan and Condition Assessment, Trabuco Canyon Water District, Trabuco Canyon, CA GIS Analyst. Mr. Eichmiller developed deliverables for this project which involves field and desktop condition assessment data for several lift stations, pump stations, water and wastewater treatment plants.
Condition Assessment, San Bernardino Municipal Water District, San Bernardino, CA GIS Analyst. Mr. Eichmiller is supporting the Asset Management team by developing Survey123 field collection forms. Surveys will be customized to meet the needs of collection type along with levying task assignments through an Operations Dashboard. These advancements will reduce data collection time. .
O pp or tu ni ty
N um be r
Education BS, Civil Engineering with Environmental Focus, California State Polytechnic University, Pomona, CA 2024
Experience
• 1 total years
• <1 year with Hazen
Professional Activities American Society of Civil Engineers (ASCE) .
Brixie Guzman-Perez Assistant Engineer I
Ms. Guzman is an Assistant Engineer with Hazen and Sawyer who has experience in both the Construction and Water Engineering fields.
She has played a crucial role in a wide range of water supply, stormwater, and drinking water projects. Her experience includes utility alignment, hydrologic modeling, preparation of Stormwater Pollution Prevention Plans (SWPPP), preparation of Water Quality Management Plans (WQMP), water quality analysis, and water quality compliance.
Lead and Copper Rule Revisions, Los Angeles Department of Water and Power, Los Angeles, CA Assistant Engineer. Provided verification of service line materials for the development of customer and utility inventory as well as GIS data input for the development of a thorough inventory of possible dependent meters within the service area. Verification services included managing, accept-ing, and following up on applications submitted by contractors for accu-rate reporting of service lines. GIS data input included accessing data-bases for locations generally prone to having dependent meters and marking such locations for further development of analysis.
Lead and Copper Rule Revisions, City of Beverly Hills, CA Assistant Engineer. Assisted in the development of the City’s lead service line (LSL) inventory, which serves as the foundation for the other critical lead and copper rule revision (LCRR) and lead and copper rule improve-ments (LCRI) compliance requirements.
Assistance with Completion and Submission of LCRR Service Line Inventories for MWDOC Agencies, CA Assistant Engineer. Assisted with the development of DDW deliverables for agencies, conducted water system research, and assisted with the development of the lead service line inventory technical memorandum.
Annual Report on Supplemental Water Criteria for the Injection Program, Valley Water Company, CA Assistant Engineer. Prepared the annual water quality report for the VWC Well Injection Program. Compared and analyzed water quality
Brixie Guzman-Perez parameters such as total dissolved solids (TDS), sulfate, chloride, and nitrate. Compared and analyzed water quality parameters from the previous fiscal year to those of the most recent fiscal year.
S-Wells Treatment and Disinfection Facility Stormwater Pollution Prevention Plan (SWPPP), Santa Clarita Valley Water Agency (SCV Water), Santa Clarita CA Assistant Engineer. Prepared a Stormwater Pollution Prevention Plan for the proposed S-Wells Facility in accordance with the National Pollut-ant Discharge Elimination System (NPDES) General Permit for Storm-water Discharges Associated with Construction and Land Disturbance Activities. Tasks included conducting a risk assessment, developing a sedimentation and erosion control plan, calculating runoff coefficients, and calculating sediment risk.
Newhall Wells Improvements Project Stormwater Pollution Prevention Plan (SWPPP), Santa Clarita Valley Water Agency (SVC Water), Santa Clarita CA Assistant Engineer. Prepared a Stormwater Pollution Prevention Plan for the Newhall Wells Improvements Project in accordance with the National Pollutant Discharge Elimination System (NPDES) General Per-mit for Stormwater Discharges Associated with Construction and Land Disturbance Activities. Tasks included conducting a risk assessment, developing a sedimentation and erosion control plan, calculating runoff coefficients, and calculating sediment risk.
Biosolids Loadout Condition Assessment Study and Detailed Design, Eastern Municipal Water District, Perris CA Assistant Engineer. Provided engineering support and review of con-tractor submittals for the biosolids loadout facility at the PVRWRRF which has experienced failure of several components.
Manhattan Beach Water Line Improvements Project, City of Manhattan Beach, CA Assistant Engineer. Developed pipeline alignments for the proposed pipelines in accordance with city standards.
El Dorado Hills WTP Improvements Project, El Dorado Irrigation District, CA Assistant Engineer. Assisted in the development of a mass balance tool for the water treatment plant and in the development of the basis of design report.
Chino-State Street WTP Design, City of Chino, CA Assistant Engineer. Assisted in the development of a Water Quality Management Plan (WQMP) for the Chino-State Street WTP which consisted of performing various calculations.
or tu ni ty
N um be r
Education BS Civil Engineering, Arizona State University, 2023
Areas of Expertise
• Wastewater treatment
• Wastewater collections
• System evaluations
• Permitting
• Water distribution
Experience
• 1 total years
• <1 year with Hazen
Professional Activities AZ Water Association
Taylor Northcott Assistant Engineer I
Ms. Northcott is an Engineer-In-Training with
1.5 years of professional experience in the wastewater design industry. She has performed design, evaluation, planning and permitting of wastewater treatment plants, pump stations, force/gravity mains, effluent discharge points, and chemical dosing systems.
Experience Prior to Hazen Palo Verde Utilities Company WWTP Campus 2 (Southwest) Rehabilitation, Maricopa, AZ Lead Design Engineer. For the complete rehabilitation and reconfigura-tion of a 1 MGD. The PVUC WWTP Campus 2 was built in 2006 for an anticipated housing development but was shut down due to the 2008 market crash. In 2021, the client and local development encouraged the rehabilitation of Campus 2 however they wanted to change technology from SBR to MLE to keep operations consistent with Campus 1. Respon-sibilities on this project included process design, equipment sizing and procurement, yard pipe design, hydraulic profile modeling, technical review of submittal items, client coordination, cost estimates, and pro-viding design documents such as drawings, reports and specifications.
Old Trails Bridge RV Resort WWTP Design/Build, Catfish Paradise, AZ
Assistant Design Engineer/Lead CAD Specialist. For the design and per-mitting of a new 20,000 GPD package WWTP and wastewater effluent disposal basins for Blue Diamond Capital Investment Group’s new RV Park. Responsibilies on this project included formulating grading plans, yard pipe design, disposal basin design, basis of design report, closure cost report, contingency plan, aquifer protection permit submission, client coordination, interdisciplinary coordination (structural, civil and electrical engineers), CAD drafting and leading the CAD drafting team.
Sweetwater WWTP and Pump Station Evaluation, Yuma, AZ Assistant Design Engineer. For the evaluation of an entire wastewater treatment plant and pump station to identify needed improvements to bring the treatment facility into compliance. Responsibilities included working with the Arizona Department of Environmental Quality to in-vestigate and model certain areas of concern, assisted in performing a field assessment of the treatment facility, performing investigative cal-
Taylor Northcott culations, presenting discoveries to client, and writing the evaluation report.
Shipp Estates Utilities WWTP Permit Transfer, Yuma, AZ Design Engineer. For the permitting of Shipp Estates Utilities WWTP.
Shipp Estates is a 50,000 GPD conventional activated sludge wastewater treatment plant. The treatment plant ownership was transferred to Cactus States Water Resources. Responsibilities were client coordination and assisting CSWR with aquifer protection permit transfer documen-tation including writing a contingency plan, closure cost, and APP trans-fer paperwork.
Liberty Utilities Polymer Project, Litchfield Park, AZ Lead CAD Specialist. For the design and permitting of a new polymer system as required by the Arizona Department of Environmental Qual-ity. The client needed a new polymer system added to their tertiary disc filters based on new regulations. Responsibilities on this project includ-ed learning the permitting process, coordination with the polymer supplier and the lead engineer, as well as drafting design drawings.
Q Mountain Water Distribution System Improvement Design, Quartzsite, AZ Design Engineer/CAD Specialist. For the system improvement design of the Q Mountain Water Distribution System owned and operated by Cac-tus State Water Resources. Responsibility included water storage tank design, and hydropneumatic tank design as well as CAD drafting of design drawings. Post-construction, WIFA funding was sought.
Santa Cruz Water Company Well Improvement Design, Elgin, AZ CAD Specialist. For the system improvement design of Santa Cruz Well Improvement Design owned and operated by Cactus State Water Resourc-
es. Responsibility included drafting design drawings for the lead engineer.
or tu ni ty
N um be r
Education B.S., Environmental Resources Engineering, Humboldt State University, Arcata, CA, 2023
Certification/License Professional Engineer: TX, VA, MD, DC
Experience
• 1 total year
• 1 year with Hazen
Professional Activities Water Environment Federation
Angel Ortiz, EIT Assistant Engineer I
Ms. Ortiz serves as an Assistant Engineer I at Hazen and Sawyer’s San Diego office. She has accumulated over three years of experience in various wastewater, drinking water, stormwater, and hydrology projects throughout her academic career. As an undergraduate researcher, she developed technical and field work capabilities to collaborate in diverse work settings. She assisted in multiple drinking and wastewater projects through data collection and analysis, design, cost estimates, and report drafting.
Plant 3A Solids Handling Facilities Improvements, Moulton Nigel Water District, Laguna Hilla, CA Assistant Engineer. Assisted with review of submittals, coordinated communication and reviews between owner and construction manager, preparation of progress payment summaries.
Co-Digestion Feasibility Study, Union Sanitary District, Union City, CA
Assistant Engineer. Assisted with solids process calculations, biogas production calculations, pipe and tank sizing calculations, preliminary design layout of co-digestion facility, and preparation of technical mem-orandums.
Secondary Treatment Facility Plan for A.K. Warren Water Resource Facility, Los Angeles County Sanitary District, Carson, CA Assistant Engineer. Assisted with preliminary design layout of secondary screening, vendor procurement, cost estimates, and preparation of technical memorandum.
Lakeside Valve Station Replacement CM Services, City of San Diego, Lakeside, CA Assistant Engineer. Assisted the construction management team with daily oversight of contractor progress on-site, created summary daily reports, management of submittal and RFI’s, communication between Contractor and Engineer, preparation of meeting minutes for progress meetings with Contractor and Owner.
Angel Ortiz, EIT
TVRWRF Nutrient Loading and Treatment Evaluation, Eastern Municipal Water District, Temecula Valley, CA Assistant Engineer. Assisted with field testing including TSS, FSS, DSS, MLSS, settling rates, etc., processing and analysis of field data, prepa-ration of technical memorandum, and preparation of presentation to summarize results.
Assistance with Completion and Submission of LCRR Service Line Inventories for OC Agencies, Municipal Water District of Orange County, Orange County, CA Assistant Engineer. Assisted in the analysis historical lead and copper records, evaluated code reviews, updated GIS with service connections, development of technical memorandums summarizing LSL inventory, action plans, and development of LSL material database for EPA and DDW.
Chino II Desalter Lime Storage Tanks Mixing Evaluation Project, Chino Basin Desalter Authority, Jurupa Valley, CA Assistant Engineer. Assisted with analysis of mixer model results, iden-tification of potential areas for improvement, development of technical memorandum.
Camarillo Water Reclamation Plant Upgrades, Camarillo Sanitary District, Camarillo, CA Assistant Engineer. Assisted with solids flows and load calculations, solids pro calculations, analysis of historical solids data, and NDPES permitting review.
Coachella Valley Water District, Coachella Valley, CA Assistant Engineer. Assisted with preliminary review of submittals during construction phase.
WWTP Operational and Optimization Services, Fritz Wastewater Treatment Plant, Reading, PA Assistant Engineer. Assisted with data analysis of historical hypochlorite data and development of technical memorandum.
PVRWRF and TVRWRF Sidestream Design, Eastern Municipal Water District, Temecula Valley, CA Assistant Engineer. Assisted with consolidation of client comments in tracking log, updated specifications for design and bid sets, and assisted in submittal reviews during PVRWRF construction phase.
or tu ni ty
N um be r
Education BE, Chemical Engineering, Vanderbilt University, 2023
Areas of Expertise
• Water treatment process and facility design
• Geographic information system
Experience
• 2 total years
• 2 years with Hazen
Professional Activities American Water Works Associa tion (AWWA)
Jenna Phillips Assistant Engineer I
Jenna Phillips is a member of Hazen’s Drinking Water Process team in Denver. Her experience includes drinking water process design, distribution system program management support, and utility planning projects.
Charles Allen Water Treatment Plant Solids Handling Improvement Program, City of Englewood, CO Project Mechanical Discipline Lead. Responsible for detailed design of a retrofitted solids handling system. Project scope includes replacing an existing belt filter press dewatering system with a centrifuge dewatering system in an existing building as well as upgrading associated equipment including sludge feed pump, sludge feed piping, and solids conveyance for disposal. Tasks include equipment sizing and equipment procurement assistance (including preselection).
City of Englewood Lead Reduction Program, City of Englewood, CO Project Engineer. Responsible for development of a comprehensive in-ventory of city-wide drinking water service lines. This includes geospa-tial analysis of data in ArcGIS, creation of data collection applications for field verification/QC, and incorporation of verified material results from construction work. Other responsibilities include generating layouts to convey inventory statuses and construction prioritization criteria, coordination with contractors performing material verification and replacement of lead and galvanized service lines, and generating pub-lic-facing web applications for customers to check their pipe material status.
City of Northglenn Chemical and Filter Improvement Project, City of Northglenn, CO Project Engineer. Designed an upgraded chemical feed facility at the Northglenn WTP. Upgrades included installation of new tanks and ap-purtenances, chemical feed pump skids, secondary containment and dual contained chemical feed piping, and level instrumentation. Improve-ments were also made to the emergency eyewash/safety showers and the chemical feed building potable and non-potable water supply systems.
Binney Water Purification Facility Groundwater Selenium Treatment System Study, City of Aurora, CO Project Engineer. Evaluated the feasibility of rerouting selenium-laden groundwater into the Binney WPF as a new source of water to eliminate
Jenna Phillips the need for a Colorado Department of Public Health and Environment discharge permit for groundwater outfalls. Used historical water quali-ty data in conjunction with sampled groundwater water quality to com-plete a mass balance on the proposed feed strategy and delivered results in a technical memorandum.
Westminster Boulevard Drinking Water Facility Final Design, City of Westminster, CO Project Engineer. Assisted with preliminary design of the High Service Pump Station and Backwash Supply Pump Station as part of a greenfield 15-mgd drinking water treatment facility. Responsible for coordination with pump suppliers and other facility leads for correct equipment se-lection.
Water Supply and Demand Planning Analysis, Meridian Metropolitan District, CO Project Engineer. Responsible for analyzing historical water allotments and water demands. This data will be used in conjunction with updated water supply documentation to support long-term resource planning for the district.
Digital Integrated Utility Master Plan, City of Louisville, CO Project Engineer. Aided in the development of a utility-wide master plan encompassing two water treatment plants, one wastewater treatment plant, distribution system, collections system, stormwater system, three reservoirs, and other water resources. Conducted data review and iden-tified potential projects and programs. Developed preliminary cost es-timates for proposed projects. Contributed to documentation materials.
Harpeth Valley Utilities District Capacity, Management, Operations, and Maintenance Program Evaluation, Nashville, TN Technician. Aided in completing a regulatory evaluation of HVUD’s existing CMOM program to identify any potential vulnerabilities and provide recommendations for program updates.
or tu ni ty
N um be r
Education MS, Water Sciences and Management, New Mexico State University, 2023
BS, Environmental Engineering, University of Oklahoma, 2020
Certification/License Professional Engineer: EIT
Areas of Expertise
• Wastewater treatment
• Water treatment
• PFAS contamination
• Water and wastewater conveyance
Experience
• 2 total years
• 1 year with Hazen
Clark Safely, EIT Assistant Engineer I
Clark Safely has two years of experience in water treatment, resources and infrastructure projects. Clark’s experience extends across planning, pumping, and design for both water and wastewater treatment facilities. He has worked on multi-disciplinary design teams on large conveyance and treatment plants up to 25-mgd with a range of processes, including (UV) disinfection, conventional filtration, and various odor control technologies.
City of Phoenix LCRR, Phoenix, AZ Assistant Engineer. Assistant to developing and managing the data as-sociated with their service line inventory. This includes GIS asset man-agement, PowerBI data analysis, and managing 3rd party data compila-tion.
Experience Prior to Hazen PFAS Decision Trees, Phoenix, AZ Assistant Engineer. This project was primarily a research effort to help ADEQ develop a document for smaller water systems in Arizona that might be affected by the EPA’s new PFAS regulatory rule. This document provides guidance on how water systems can best tackle their PFAS problem based on the specific PFAS compounds and concentrations de-tected in their systems.
Star Valley System Upgrades, Star Valley, AZ Assistant Engineer. Clark served as the EIT for the Star Valley System Upgrades, which included hydraulic modeling to determine if the mu-nicipality could add 4 mobile home parks directly to their system and if their system could meet demand with 2 of their ground water wells being shutoff due to PFAS contamination. In addition to these considerations, Star Valley asked for a preliminary design of a booster station that would serve as a back-up in emergency case scenario’s where more wells were shut off.
Nogales WWTP and IOI Upgrades, Phoenix, AZ Assistant Engineer. Assistant in the design and production for the im-provements to the Nogalas WWTP and the IOI (International outflow
Clark Safely, EIT interceptor). This included a new headworks design, 3 new clarifiers, new aeration basins, new tertiary treatment with UV and Mega-disk filtration, new belt filter presses, new blowers, and a new sludge retention pond.
Beardsley-Butler Reclaimed Water Alignment Study, Peoria, AZ Assistant Engineer. Assistant in the design and production for a proposed 24” reclaimed water line designed to move water from the City of Peoria’s Bulter WRF to their Beardsley WRF. This project includes 11.5 miles of 24” DIP pipe, a secondary booster station, and 2,500 LF of trenchless installation.
or tu ni ty
N um be r
Education BS Engineering, Environmental Engineering, 2021
Certification/License Engineer In Training: AZ
Certified Grade II Wastewater Operator: AZ
Areas of Expertise
• Wastewater treatment and design
• Water treatment and design
• Advanced water purification
Experience
• 2 total years
• 1 year with Hazen
Rachel Soh, EIT Assistant Engineer
Rachel is Hazen’s assistant engineer with a year of water and wastewater treatment and design experience. Her experiences include water treatment modeling and planning, including field testing and lab testing. Wastewater experience includes operator training and modeling.
Kyrene Water Reclamation Facility, Tempe, AZ The Kyrene Water Reclamation ceased operations in 2010, as the demand for treating wastewater increased and the need to reduce reliance on existing stressed supplies, the City of Tempe decided on recommission-ing the facility. The facility aimed to treat up to 4.5 MGD of wastewater locally and focused on modernizing their current MBR system to increase treatment efficiency. Rachel aided in the 90 percent design of the MBR design and other aspects of the projects.
Experience Prior to Hazen LCRR Coupon Testing, Phoenix, AZ In December 2021, the Lead and Copper Rule Revision (LCRR) lead to the city of phoenix to take action in determining if changes needed to be made to the city’s piping system. The coupon test was conducted to com-pare metal release for pipes exposed to CAP versus SRP water with or without pH adjustment. The testing program exposed harvested copper and brass pipe/coupon samples to be CAP and SRP waters, where the free chlorine levels of those waters were adjusted to a target residual. After two to three days of exposure, the water is collected into a composite sample. This step is repeated, and the final composite sample sent to the lab for analysis. Rachel aided in the testing and data analysis of the cou-pon testing. The coupon test allowed for the city to further access and mitigate the risk of increased lead concentrations.
Southeast Water Reclamation Facility, Mesa, AZ The Southeast Water Reclamation Facility has the capacity to treat up to 8 MG of wastewater per day. It is scalping plant where treated effluent are sent to the Greenfield WRF for further treatment and the partial flow is sent to the Gila River Indian Community for beneficial reuse as a part of the exchange agreement for surface water. Rachel was trained in the day-to-day responsibilities as an operator in maintaining the facility operates efficiently. Some responsibilities include equipment maintenance, Rachel Soh, EIT monitoring process controls, analyzing daily trends and data, daily lab analysis and others. Rachel earned her Grad II Wastewater Certificate shortly after interning with the facility.
or tu ni ty
N um be r
Education M.S., Geographic Information Science, California State University Long Beach, Long Beach, CA, 2022
M.S., Science Education, Fordham University, New York, NY, 2017
B.S., Environmental Science and Resource Management, University of Washington, Seattle, WA, 2014
Areas of Expertise
• GIS
• Data Analysis
Experience
• 11 total years
• 2 years with Hazen
Professional Activities URISA (Urban and Regional Information Systems Association)
Max Sugarman Assistant Scientist
Mr. Sugarman serves as a Data and GIS Analyst in Hazen and Sawyer’s Los Angeles Office. He has over 10 years of experience working in the civic, environmental, scientific, GIS, and education areas. Proficient in Python, GIS software, and Power BI visualization tools, he excels in delivering accurate technical research and analysis. He has worked on applied spatial machine projects to address homelessness in Los Angeles County, support mapping for autonomous vehicles, and develop analysis and asset management dashboards for local water agencies.
Wastewater Facility Master Plan – Existing Facilities, Daly City, CA Data and GIS Analyst. Developed and managed condition assessment for wastewater treatment facility in first ever master plan for the district.
Created an ArcGIS Survey123 tool to capture asset class specific data and develop a detailed asset register for the plant. Collaborated with opera-tors and maintenance staff to develop scoring guidelines for consequence of failure across different wastewater processes and prioritize condition assessment appropriately. Developed a live ArcGIS dashboard to manage data collection, led QC of data, and generated calculations to determine remaining useful life, risk, and support CIP development.
Asset Management Tool, Water Replenishment District, Lakewood, CA
Data and GIS Analyst. Incorporated new facility into an existing Power BI asset management dashboard tool which enables near real-time cal-culation of condition scoring and remaining useful life. Provided train-ing to district staff to support Power BI skills, application and use of the tool for operations staff, and transition of tool to WRD ownership. Pro-grammed an automated condition scoring process in Power Query to generate condition scores directly from survey questions for over 3000 assets. Presented the tool at the Smart Water Utility Conference in March 2024.
Max Sugarman
Common Treatment System Asset Management Plan, Rancho California Water District, Temecula, CA Data and GIS Analyst. Built a new asset register for the district’s common treatment system for groundwater wells using a combination of record drawings, ArcGIS Survey123, and direct communication with district staff. Gathered and organized photos and 360 photos for all assets.
Conducted condition assessment of over 50 well sites and their treatment systems working in conjunction with mechanical and electrical engi-neering leads and operations staff. Constructed Power BI dashboard to display interactive visualizations of asset condition, management and maintenance strategies, and CIP planning.
Master Plan, Santa Clarita Valley Water, Santa Clarita, CA GIS and Data Analyst. The project involved the development of a maps, spatial analyses, and Power BI dashboards for asset management and water quality within the master plan. He supported the cleaning and processing of asset data, the mapping of assets and forced mains, the spatial analysis of pipelines in InfoAssetPlanner and ArcGIS Pro and developed a Power BI Dashboard for asset management. He also devel-oped a custom Power BI Dashboard to visualize and summarize the water quality for the agency.
Dam Inventory with Machine Learning, ADECA, Birmingham, AL GIS Analyst. Applied deep learning methods to detect over 700 previ-ously unknown dams across three counties of Alabama. Utilized ArcGIS Deep Learning Imagery Analyst tools to train a ResNet machine learn-ing model on publicly available NAIP imagery and existing inventory of dams from the state of Alabama. Developed a model builder toolbox to passively iterate through more than 500GB of image data without im-pacting network servers and deliver a model with a greater than 70% accuracy rate after only 8 hours of training.
Sanitary Sewer Overflow Analysis, City of Phoenix, AZ GIS Analyst. Analyzed over 20,000 segments of pipes and 700 incidents of SSOs for the City of Phoenix to establish spatial patterns and provide data to support horizontal asset management. Incorporated DBSCAN clustering algorithms to identify locations to prioritize for attention and possible cleanings based on historic SSO and grease trap violation data. Ran statistical analyses to identify causal trends across variables such as flow, material, and diameter.