CTR064365_Pricing.xlsx

XLSX spreadsheet 433 KB Posted

Attached to
Master Agreement AZ|CTR064365
Contract number
CTR064365
Issued by
Arizona

About this file

This document is a comprehensive pricing sheet for ITS (Intelligent Transportation Systems) Installation, Repair and Replacement Services, submitted by PACE Electrical Construction, Inc. (FIN - 860895413). The document appears to be part of a state or local government contract, presenting detailed labor rates, material costs, equipment pricing, traffic control labor and materials, and subcontractor work pricing for electrical and infrastructure services.

The pricing sheet provides extensive rate information across multiple categories, including labor classifications ranging from Laborer ($39.76/hour) to Signal & Lighting Technician ($85.42/hour), and detailed material pricing with a consistent 20% cost-plus markup. Equipment rates are provided for various vehicles and machinery, with hourly rates for items like Boom/Bucket Trucks ($83.20/hour) and Cranes (up to 50 TN at $96.00/hour). The document also includes specific pricing for traffic control services, such as Uniformed Officers at $105/hour, and traffic control materials like Variable Message Signs at $110/day. Subcontractor work, including directional boring services, is priced with a 15% markup, with rates varying by bore diameter and complexity.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Labor Rates and Classifications

PRICING SHEET
ITS Installation, Repair and Replacement Services
OFFEROR: PACE Electrical Construction, Inc.
FIN - 860895413
Labor Rates

Instructions: Labor Classifications: The Contractor shall provide labor rates for any labor levels that may be applicable to the service being offered.The labor rates listed below will be used for evaluation purposes. The Contractor must use additional lines to fill in any other classifications that are being offered. Below indicate labor rates as required in paragraph 4.6.3.1 in the scope of work.

Labor ClassificiationHourly RateNotes
Crew Lead (Foreman)$ 64.35Hourly
Superintendent$ 74.25Hourly
Signal & Lighting Technician$ 85.42Hourly
Boom Truck Operator$ 63.36Hourly
Backhoe Operator$ 56.10Hourly
Project Manager$ 61.05Hourly
Crane Operator (up to 50 TN)$ 74.25Hourly
Dump Truck Driver$ 55.50Hourly
Laborer$ 39.76Hourly
Equipment Transport Driver$ 34.50Hourly

Materials Pricing

PRICING SHEET
ITS Installation, Repair and Replacement Services
OFFEROR: P.A.C.E Electrical Construction, Inc.
FIN - 860895413
Materials Pricing

Instructions: Materials Pricing: The Contractor shall provide a Cost-Plus-Fixed Percentage for any Material classifications that may be applicable to the service being offered. The Contractor must use additional lines to fill in any classifications that are being offered. Below indicate fixed percentage as required in paragraph 4.11.1 in the scope of work.

Material ClassificationsMaterial CostFixed %Cost-Plus-Fixed Percentage (%)Notes
ELECTRICAL CONDUIT (1/2") (PVC)$ 0.750.20$ 0.90LF
ELECTRICAL CONDUIT (3/4") (PVC)$ 0.900.20$ 1.08LF
ELECTRICAL CONDUIT (1") (PVC)$ 1.400.20$ 1.68LF
ELECTRICAL CONDUIT (1") (PVC) (FLEX)$ 1.350.20$ 1.62LF
ELECTRICAL CONDUIT (1 1/2") (PVC)$ 2.200.20$ 2.64LF
ELECTRICAL CONDUIT (2") (PVC)$ 2.800.20$ 3.36LF
ELECTRICAL CONDUIT (2 1/2") (PVC)$ 4.200.20$ 5.04LF
ELECTRICAL CONDUIT (3") (PVC)$ 5.250.20$ 6.30LF
ELECTRICAL CONDUIT (3 - 3") (PVC)$ 15.700.20$ 18.84LF
ELECTRICAL CONDUIT (2 - 3") (PVC)$ 10.500.20$ 12.60LF
ELECTRICAL CONDUIT (4") (PVC)$ 7.000.20$ 8.40LF
ELECTRICAL CONDUIT (5") (PVC)$ 10.000.20$ 12.00LF
ELECTRICAL CONDUIT (6") (PVC)$ 13.000.20$ 15.60LF
ELECTRICAL CONDUIT (3" HDPE )$ 4.000.20$ 4.80LF
ELECTRICAL CONDUIT (2-3" HDPE )$ 8.000.20$ 9.60LF
ELECTRICAL CONDUIT (3-3" HDPE)$ 12.000.20$ 14.40LF
ELECTRICAL CONDUIT (2" HDPE )$ 3.750.20$ 4.50LF
ELECTRICAL CONDUIT (2-2" HDPE)$ 7.500.20$ 9.00LF
ELECTRICAL CONDUIT (4" HDPE)$ 6.200.20$ 7.44LF
ELECTRICAL CONDUIT (2-4" HDPE)$ 12.400.20$ 14.88LF
PULL BOX (NO. 3 1/2)$ 350.000.20$ 420.00LF
PULL BOX (NO. 5)$ 430.000.20$ 516.00LF
PULL BOX (NO. 5) (WITH EXTENSION)$ 445.000.20$ 534.00LF
PULL BOX (NO. 7)$ 540.000.20$ 648.00LF
PULL BOX (NO. 7) (WITH EXTENSION)$ 660.000.20$ 792.00LF
PULL BOX (NO. 9)$ 1,232.000.20$ 1,478.40LF
PULL BOX (NO. 4B)$ 1,050.000.20$ 1,260.00LF
PULL BOX (NO. 6B)$ 1,190.000.20$ 1,428.00LF
CONDUCTOR (NO. 14)$ 0.200.20$ 0.24LF
CONDUCTOR (NO. 12)$ 0.250.20$ 0.30LF
CONDUCTOR (NO. 10)$ 0.300.20$ 0.36LF
CONDUCTOR (NO. 8)$ 0.500.20$ 0.60LF
CONDUCTOR (NO. 6)$ 0.700.20$ 0.84LF
CONDUCTOR (NO. 4)$ 1.100.20$ 1.32LF
CONDUCTOR (NO. 2)$ 1.800.20$ 2.16LF
CONDUCTOR (NO. 1)$ 2.000.20$ 2.40LF
CONDUCTOR (BARE BOND)$ 0.450.20$ 0.54LF
CONDUCTOR (INSULATED BOND) (NO. 10)$ 0.600.20$ 0.72LF
CONDUCTOR (INSULATED BOND) (NO. 8)$ 0.800.20$ 0.96LF
CONDUCTOR (INSULATED BOND) (NO. 6)$ 1.000.20$ 1.20LF
CONDUCTOR (INSULATED BOND) (NO. 4)$ 1.200.20$ 1.44LF
CONDUCTOR (NO. 0)$ 2.500.20$ 3.00LF
CONDUCTOR (NO. 00)$ 3.200.20$ 3.84LF
CONDUCTOR (NO. 000)$ 4.000.20$ 4.80LF
CONDUCTOR (NO. 0000)$ 4.900.20$ 5.88LF
SINGLE MODE FIBER OPTIC CABLE (12 FIBERS)$ 0.600.20$ 0.72LF
SINGLE MODE FIBER OPTIC CABLE (48 FIBERS)$ 1.200.20$ 1.44LF
SINGLE MODE FIBER OPTIC CABLE (144 FIBERS)$ 1.900.20$ 2.28LF
MULTI-MODE FIBER OPTIC CABLE (18 FIBERS)$ 1.080.20$ 1.30LF
FIBER OPTIC SPLICE CLOSURE (FMS)$ 700.000.20$ 840.00LF
CABLE INNERDUCT (3/4")$ 1.000.20$ 1.20LF
CABLE INNERDUCT (1")$ 1.500.20$ 1.80LF
VIDEO DETECTION SYSTEM (2-CAMERA)$ 16,000.000.20$ 19,200.00LF
VIDEO DETECTION SYSTEM (3-CAMERA)$ 24,000.000.20$ 28,800.00LS
VIDEO DETECTION SYSTEM (4-CAMERA)$ 32,000.000.20$ 38,400.00LS
VIDEO DETECTION SYSTEM (6-CAMERA)$ 48,000.000.20$ 57,600.00LS
COMMUNICATION CABLE$ 0.500.20$ 0.60LF

0.15 LF

Equipment Pricing

PRICING SHEET
ITS Installation, Repair and Replacement Services
OFFEROR: P.A.C.E. Electrical Construction, Inc.
FIN - 860895413
Equipment Pricing

Instructions: Equipment Pricing: The Contractor shall provide a Hourly Rate for any Equipment that may be applicable to the service being offered.The Equipment Classifications listed below will be used for evaluation purposes. The Contractor must use additional lines to fill in any other classifications that are being offered. Below indicate equipment daily rate as required in paragraph 4.12 in the scope of work.

Equipment ClassificationHourly RateNotes
Utility/ Pickup Truck$ 32.41Ea / Hourly
Boom/ Bucket Truck$ 83.20Ea / Hourly
Air Compressor$ 9.72Ea / Hourly
Skip Loader$ 50.77Ea / Hourly
Backhoe$ 58.00Ea / Hourly
Crane (up to 50 TN)$ 96.00Ea / Hourly
10 Wheeler Dump Truck$ 28.00Ea / Hourly
Transport Truck$ 36.88Ea / Hourly
Mini Excavator$ 43.70Ea / Hourly
Fiber Blower$ 35.94Ea / Hourly
Pot Hole Machine/Vacuum$ 12.85Ea / Hourly
Compactor$ 6.70Ea / Hourly

Traffic Control Labor Pricing

PRICING SHEET
ITS Installation, Repair and Replacement Services
OFFEROR: P.A.C.E. Electrical Construction, Inc.
FIN - 860895413
Traffic Control Labor Pricing (Sub-Contractor)

Instructions: Traffic Control Labor Pricing (Sub-Contractor): The Contractor shall provide a Cost-Plus-Fixed Percentage for any Traffic Control for Subcontractor classifications that may be applicable to the service being offered.The Traffic Control for Subcontractor Classifications listed below will be used for evaluation purposes. The Contractor must use additional lines to fill in any other classifications that are being offered. Below indicate fixed percentage as required in paragraph 4.13.4 in the Specifications.

Traffic Control (Sub-Contractor) ClassificationsCost-Plus-Fixed PercentageNotes
Uniformed Officer$ 105.00Hourly Rate w/four hour minimum
Traffic Control Lead$ 105.00Hourly Rate w/four hour minimum
Traffic Control Officer w/Car$ 155.00Hourly Rate w/four hour minimum
Laborer$ 84.00Hourly Rate
Barrier Setter w/truck$ 105.00Hourly Rate
Truck Mounted Attenuator Operator$ 131.25Hourly Rate

Traffic Control Materials

PRICING SHEET
ITS Installation, Repair and Replacement Services
OFFEROR:P.A.C.E. Electrical Construction, Inc.
FIN - 860895413
Traffic Control Materials

Instructions: Traffic Control Materials (Contractor owned/supplied): The Contractor shall provide a daily rate for any Traffic Control Materials for Contractor Owned/supplied classifications that may be applicable to the service being offered.The Traffic Control for Contractor Owned/supplied materials listed below will be used for evaluation purposes. The Contractor must use additional lines to fill in any other classifications that are being offered. Below indicate fixed percentage as required in paragraph 4.13.7 in the Specifications.

Traffic Control Materials (Contractor owned/supplied) ClassificationsDaily RateNotes
Variable Message Signs$ 110.00Ea/Per Day
Arrow Boards$ 78.75Ea/Per Day
Type I, Vertical Panel$ 0.55Ea/Per Day
Type II, Vertical Panel, Tubular Marker Barricade$ 0.55Ea/Per Day
Type III, High Level Flag Trees Barricade$ 0.83Ea/Per Day
Rigid Portable Sign Stands$ 0.69Ea/Per Day
Spring Portable Sign Stands$ 1.88Ea/Per Day
Type A Warning Lights$ 0.31Ea/Per Day
Type B Warning Lights$ 1.69Ea/Per Day
Type C Warning Lights$ 0.29Ea/Per Day
Traffic Cone - 28" Reflective$ 0.55Ea/Per Day
Embedded Sign Post$ 0.45Ea/Per Day
Truck Mounted Attenuator$ 125.00Ea/Per Day
Temporary Sign Less Than 10 SQ.FT.$ 68.75Ea/Per Day
Temporary Sign 10 SQFT or More$ 97.50Ea/Per Day
Flag with Dowel$ 5.25Ea/Per Day
Sandbag$ 2.25Ea/Per Day

Subcontractor Work Pricing

PRICING SHEET
ITS Installation, Repair and Replacement Services
OFFEROR: P.A.C.E. Electrical Construction, Inc.
FIN - 860895413
Subcontractor Work Pricing

Instructions: Subcontractor Work Pricing: The Contractor shall provide a Cost-Plus-Fixed Percentage for any Subcontractor work classification that may be applicable to the service being offered.The Subcontractor Classifications listed below will be used for evaluation purposes. The Contractor must use additional lines to fill in any other classifications that are being offered. Below indicate fixed percentage as required in paragraph 4.30 in the Specifications.

Subcontractor ClassificationsRateFixed %Cost-Plus-Fixed Percentage (%)Notes
Equipment OperatorN/A
Labor ServicesN/A
Equipment materialsN/A
Directional Bore 2"$ 40.000.15$ 46.00Per Lf.
Directional Bore 2 - 2"$ 45.000.15$ 51.75Per Lf.
Directional Bore 2 - 3"$ 50.000.15$ 57.50Per Lf.
Directional Bore 1 - 3"$ 40.000.15$ 46.00Per Lf.
Directional Bore 3 - 3"$ 55.000.15$ 63.25Per Lf.
Directional Bore 4"$ 45.000.15$ 51.75Per Lf.
Directional Bore 4 - 4"$ 55.000.15$ 63.25Per Lf.

Pot hole for Directional Bore $ 250.00 0.15 $ 287.50 Per Hour

Sheet1