CTR064365_Pricing.xlsx
XLSX spreadsheet 433 KB Posted
- Attached to
- Master Agreement AZ|CTR064365
- Contract number
- CTR064365
- Issued by
- Arizona
About this file
This document is a comprehensive pricing sheet for ITS (Intelligent Transportation Systems) Installation, Repair and Replacement Services, submitted by PACE Electrical Construction, Inc. (FIN - 860895413). The document appears to be part of a state or local government contract, presenting detailed labor rates, material costs, equipment pricing, traffic control labor and materials, and subcontractor work pricing for electrical and infrastructure services.
The pricing sheet provides extensive rate information across multiple categories, including labor classifications ranging from Laborer ($39.76/hour) to Signal & Lighting Technician ($85.42/hour), and detailed material pricing with a consistent 20% cost-plus markup. Equipment rates are provided for various vehicles and machinery, with hourly rates for items like Boom/Bucket Trucks ($83.20/hour) and Cranes (up to 50 TN at $96.00/hour). The document also includes specific pricing for traffic control services, such as Uniformed Officers at $105/hour, and traffic control materials like Variable Message Signs at $110/day. Subcontractor work, including directional boring services, is priced with a 15% markup, with rates varying by bore diameter and complexity.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Usage Report-4TH QUARTER (1).xlsx | XLSX spreadsheet | |
| ACCEPTED CTR064365 GL,AL,WC 02.27.24-02.11.25.pdf | ||
| CTR064365 Post Award Documents.pdf | ||
| CTR064365_Contract_Amendment_Summary_2.pdf | ||
| CTR064365_Contract_Amendment_Summary_3.pdf | ||
| CTR064365_Contract_Documents.pdf | ||
| 2024.02.11 COI.pdf | ||
| CTR064365_Contract_Amendment_Summary_One__1_.pdf | ||
| Usage Report-3RD QUARTER.xlsx | XLSX spreadsheet | |
| CTR064365_Contract_Amendment_Summary_4.pdf | ||
| Usage Report-1ST QUARTER.xlsx | XLSX spreadsheet | |
| Usage Report-2ND QUARTER.xlsx | XLSX spreadsheet |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Labor Rates and Classifications
| PRICING SHEET |
| ITS Installation, Repair and Replacement Services |
| OFFEROR: PACE Electrical Construction, Inc. | |
| FIN - 860895413 | |
| Labor Rates |
Instructions: Labor Classifications: The Contractor shall provide labor rates for any labor levels that may be applicable to the service being offered.The labor rates listed below will be used for evaluation purposes. The Contractor must use additional lines to fill in any other classifications that are being offered. Below indicate labor rates as required in paragraph 4.6.3.1 in the scope of work.
| Labor Classificiation | Hourly Rate | Notes |
| Crew Lead (Foreman) | $ 64.35 | Hourly |
| Superintendent | $ 74.25 | Hourly |
| Signal & Lighting Technician | $ 85.42 | Hourly |
| Boom Truck Operator | $ 63.36 | Hourly |
| Backhoe Operator | $ 56.10 | Hourly |
| Project Manager | $ 61.05 | Hourly |
| Crane Operator (up to 50 TN) | $ 74.25 | Hourly |
| Dump Truck Driver | $ 55.50 | Hourly |
| Laborer | $ 39.76 | Hourly |
| Equipment Transport Driver | $ 34.50 | Hourly |
Materials Pricing
| PRICING SHEET |
| ITS Installation, Repair and Replacement Services |
| OFFEROR: P.A.C.E Electrical Construction, Inc. | |
| FIN - 860895413 | |
| Materials Pricing |
Instructions: Materials Pricing: The Contractor shall provide a Cost-Plus-Fixed Percentage for any Material classifications that may be applicable to the service being offered. The Contractor must use additional lines to fill in any classifications that are being offered. Below indicate fixed percentage as required in paragraph 4.11.1 in the scope of work.
| Material Classifications | Material Cost | Fixed % | Cost-Plus-Fixed Percentage (%) | Notes |
| ELECTRICAL CONDUIT (1/2") (PVC) | $ 0.75 | 0.20 | $ 0.90 | LF |
| ELECTRICAL CONDUIT (3/4") (PVC) | $ 0.90 | 0.20 | $ 1.08 | LF |
| ELECTRICAL CONDUIT (1") (PVC) | $ 1.40 | 0.20 | $ 1.68 | LF |
| ELECTRICAL CONDUIT (1") (PVC) (FLEX) | $ 1.35 | 0.20 | $ 1.62 | LF |
| ELECTRICAL CONDUIT (1 1/2") (PVC) | $ 2.20 | 0.20 | $ 2.64 | LF |
| ELECTRICAL CONDUIT (2") (PVC) | $ 2.80 | 0.20 | $ 3.36 | LF |
| ELECTRICAL CONDUIT (2 1/2") (PVC) | $ 4.20 | 0.20 | $ 5.04 | LF |
| ELECTRICAL CONDUIT (3") (PVC) | $ 5.25 | 0.20 | $ 6.30 | LF |
| ELECTRICAL CONDUIT (3 - 3") (PVC) | $ 15.70 | 0.20 | $ 18.84 | LF |
| ELECTRICAL CONDUIT (2 - 3") (PVC) | $ 10.50 | 0.20 | $ 12.60 | LF |
| ELECTRICAL CONDUIT (4") (PVC) | $ 7.00 | 0.20 | $ 8.40 | LF |
| ELECTRICAL CONDUIT (5") (PVC) | $ 10.00 | 0.20 | $ 12.00 | LF |
| ELECTRICAL CONDUIT (6") (PVC) | $ 13.00 | 0.20 | $ 15.60 | LF |
| ELECTRICAL CONDUIT (3" HDPE ) | $ 4.00 | 0.20 | $ 4.80 | LF |
| ELECTRICAL CONDUIT (2-3" HDPE ) | $ 8.00 | 0.20 | $ 9.60 | LF |
| ELECTRICAL CONDUIT (3-3" HDPE) | $ 12.00 | 0.20 | $ 14.40 | LF |
| ELECTRICAL CONDUIT (2" HDPE ) | $ 3.75 | 0.20 | $ 4.50 | LF |
| ELECTRICAL CONDUIT (2-2" HDPE) | $ 7.50 | 0.20 | $ 9.00 | LF |
| ELECTRICAL CONDUIT (4" HDPE) | $ 6.20 | 0.20 | $ 7.44 | LF |
| ELECTRICAL CONDUIT (2-4" HDPE) | $ 12.40 | 0.20 | $ 14.88 | LF |
| PULL BOX (NO. 3 1/2) | $ 350.00 | 0.20 | $ 420.00 | LF |
| PULL BOX (NO. 5) | $ 430.00 | 0.20 | $ 516.00 | LF |
| PULL BOX (NO. 5) (WITH EXTENSION) | $ 445.00 | 0.20 | $ 534.00 | LF |
| PULL BOX (NO. 7) | $ 540.00 | 0.20 | $ 648.00 | LF |
| PULL BOX (NO. 7) (WITH EXTENSION) | $ 660.00 | 0.20 | $ 792.00 | LF |
| PULL BOX (NO. 9) | $ 1,232.00 | 0.20 | $ 1,478.40 | LF |
| PULL BOX (NO. 4B) | $ 1,050.00 | 0.20 | $ 1,260.00 | LF |
| PULL BOX (NO. 6B) | $ 1,190.00 | 0.20 | $ 1,428.00 | LF |
| CONDUCTOR (NO. 14) | $ 0.20 | 0.20 | $ 0.24 | LF |
| CONDUCTOR (NO. 12) | $ 0.25 | 0.20 | $ 0.30 | LF |
| CONDUCTOR (NO. 10) | $ 0.30 | 0.20 | $ 0.36 | LF |
| CONDUCTOR (NO. 8) | $ 0.50 | 0.20 | $ 0.60 | LF |
| CONDUCTOR (NO. 6) | $ 0.70 | 0.20 | $ 0.84 | LF |
| CONDUCTOR (NO. 4) | $ 1.10 | 0.20 | $ 1.32 | LF |
| CONDUCTOR (NO. 2) | $ 1.80 | 0.20 | $ 2.16 | LF |
| CONDUCTOR (NO. 1) | $ 2.00 | 0.20 | $ 2.40 | LF |
| CONDUCTOR (BARE BOND) | $ 0.45 | 0.20 | $ 0.54 | LF |
| CONDUCTOR (INSULATED BOND) (NO. 10) | $ 0.60 | 0.20 | $ 0.72 | LF |
| CONDUCTOR (INSULATED BOND) (NO. 8) | $ 0.80 | 0.20 | $ 0.96 | LF |
| CONDUCTOR (INSULATED BOND) (NO. 6) | $ 1.00 | 0.20 | $ 1.20 | LF |
| CONDUCTOR (INSULATED BOND) (NO. 4) | $ 1.20 | 0.20 | $ 1.44 | LF |
| CONDUCTOR (NO. 0) | $ 2.50 | 0.20 | $ 3.00 | LF |
| CONDUCTOR (NO. 00) | $ 3.20 | 0.20 | $ 3.84 | LF |
| CONDUCTOR (NO. 000) | $ 4.00 | 0.20 | $ 4.80 | LF |
| CONDUCTOR (NO. 0000) | $ 4.90 | 0.20 | $ 5.88 | LF |
| SINGLE MODE FIBER OPTIC CABLE (12 FIBERS) | $ 0.60 | 0.20 | $ 0.72 | LF |
| SINGLE MODE FIBER OPTIC CABLE (48 FIBERS) | $ 1.20 | 0.20 | $ 1.44 | LF |
| SINGLE MODE FIBER OPTIC CABLE (144 FIBERS) | $ 1.90 | 0.20 | $ 2.28 | LF |
| MULTI-MODE FIBER OPTIC CABLE (18 FIBERS) | $ 1.08 | 0.20 | $ 1.30 | LF |
| FIBER OPTIC SPLICE CLOSURE (FMS) | $ 700.00 | 0.20 | $ 840.00 | LF |
| CABLE INNERDUCT (3/4") | $ 1.00 | 0.20 | $ 1.20 | LF |
| CABLE INNERDUCT (1") | $ 1.50 | 0.20 | $ 1.80 | LF |
| VIDEO DETECTION SYSTEM (2-CAMERA) | $ 16,000.00 | 0.20 | $ 19,200.00 | LF |
| VIDEO DETECTION SYSTEM (3-CAMERA) | $ 24,000.00 | 0.20 | $ 28,800.00 | LS |
| VIDEO DETECTION SYSTEM (4-CAMERA) | $ 32,000.00 | 0.20 | $ 38,400.00 | LS |
| VIDEO DETECTION SYSTEM (6-CAMERA) | $ 48,000.00 | 0.20 | $ 57,600.00 | LS |
| COMMUNICATION CABLE | $ 0.50 | 0.20 | $ 0.60 | LF |
0.15 LF
Equipment Pricing
| PRICING SHEET |
| ITS Installation, Repair and Replacement Services |
| OFFEROR: P.A.C.E. Electrical Construction, Inc. | |
| FIN - 860895413 | |
| Equipment Pricing |
Instructions: Equipment Pricing: The Contractor shall provide a Hourly Rate for any Equipment that may be applicable to the service being offered.The Equipment Classifications listed below will be used for evaluation purposes. The Contractor must use additional lines to fill in any other classifications that are being offered. Below indicate equipment daily rate as required in paragraph 4.12 in the scope of work.
| Equipment Classification | Hourly Rate | Notes |
| Utility/ Pickup Truck | $ 32.41 | Ea / Hourly |
| Boom/ Bucket Truck | $ 83.20 | Ea / Hourly |
| Air Compressor | $ 9.72 | Ea / Hourly |
| Skip Loader | $ 50.77 | Ea / Hourly |
| Backhoe | $ 58.00 | Ea / Hourly |
| Crane (up to 50 TN) | $ 96.00 | Ea / Hourly |
| 10 Wheeler Dump Truck | $ 28.00 | Ea / Hourly |
| Transport Truck | $ 36.88 | Ea / Hourly |
| Mini Excavator | $ 43.70 | Ea / Hourly |
| Fiber Blower | $ 35.94 | Ea / Hourly |
| Pot Hole Machine/Vacuum | $ 12.85 | Ea / Hourly |
| Compactor | $ 6.70 | Ea / Hourly |
Traffic Control Labor Pricing
| PRICING SHEET |
| ITS Installation, Repair and Replacement Services |
| OFFEROR: P.A.C.E. Electrical Construction, Inc. | ||
| FIN - 860895413 | ||
| Traffic Control Labor Pricing (Sub-Contractor) |
Instructions: Traffic Control Labor Pricing (Sub-Contractor): The Contractor shall provide a Cost-Plus-Fixed Percentage for any Traffic Control for Subcontractor classifications that may be applicable to the service being offered.The Traffic Control for Subcontractor Classifications listed below will be used for evaluation purposes. The Contractor must use additional lines to fill in any other classifications that are being offered. Below indicate fixed percentage as required in paragraph 4.13.4 in the Specifications.
| Traffic Control (Sub-Contractor) Classifications | Cost-Plus-Fixed Percentage | Notes |
| Uniformed Officer | $ 105.00 | Hourly Rate w/four hour minimum |
| Traffic Control Lead | $ 105.00 | Hourly Rate w/four hour minimum |
| Traffic Control Officer w/Car | $ 155.00 | Hourly Rate w/four hour minimum |
| Laborer | $ 84.00 | Hourly Rate |
| Barrier Setter w/truck | $ 105.00 | Hourly Rate |
| Truck Mounted Attenuator Operator | $ 131.25 | Hourly Rate |
Traffic Control Materials
| PRICING SHEET |
| ITS Installation, Repair and Replacement Services |
| OFFEROR: | P.A.C.E. Electrical Construction, Inc. | |
| FIN - 860895413 | ||
| Traffic Control Materials |
Instructions: Traffic Control Materials (Contractor owned/supplied): The Contractor shall provide a daily rate for any Traffic Control Materials for Contractor Owned/supplied classifications that may be applicable to the service being offered.The Traffic Control for Contractor Owned/supplied materials listed below will be used for evaluation purposes. The Contractor must use additional lines to fill in any other classifications that are being offered. Below indicate fixed percentage as required in paragraph 4.13.7 in the Specifications.
| Traffic Control Materials (Contractor owned/supplied) Classifications | Daily Rate | Notes |
| Variable Message Signs | $ 110.00 | Ea/Per Day |
| Arrow Boards | $ 78.75 | Ea/Per Day |
| Type I, Vertical Panel | $ 0.55 | Ea/Per Day |
| Type II, Vertical Panel, Tubular Marker Barricade | $ 0.55 | Ea/Per Day |
| Type III, High Level Flag Trees Barricade | $ 0.83 | Ea/Per Day |
| Rigid Portable Sign Stands | $ 0.69 | Ea/Per Day |
| Spring Portable Sign Stands | $ 1.88 | Ea/Per Day |
| Type A Warning Lights | $ 0.31 | Ea/Per Day |
| Type B Warning Lights | $ 1.69 | Ea/Per Day |
| Type C Warning Lights | $ 0.29 | Ea/Per Day |
| Traffic Cone - 28" Reflective | $ 0.55 | Ea/Per Day |
| Embedded Sign Post | $ 0.45 | Ea/Per Day |
| Truck Mounted Attenuator | $ 125.00 | Ea/Per Day |
| Temporary Sign Less Than 10 SQ.FT. | $ 68.75 | Ea/Per Day |
| Temporary Sign 10 SQFT or More | $ 97.50 | Ea/Per Day |
| Flag with Dowel | $ 5.25 | Ea/Per Day |
| Sandbag | $ 2.25 | Ea/Per Day |
Subcontractor Work Pricing
| PRICING SHEET |
| ITS Installation, Repair and Replacement Services |
| OFFEROR: P.A.C.E. Electrical Construction, Inc. | |
| FIN - 860895413 | |
| Subcontractor Work Pricing |
Instructions: Subcontractor Work Pricing: The Contractor shall provide a Cost-Plus-Fixed Percentage for any Subcontractor work classification that may be applicable to the service being offered.The Subcontractor Classifications listed below will be used for evaluation purposes. The Contractor must use additional lines to fill in any other classifications that are being offered. Below indicate fixed percentage as required in paragraph 4.30 in the Specifications.
| Subcontractor Classifications | Rate | Fixed % | Cost-Plus-Fixed Percentage (%) | Notes |
| Equipment Operator | N/A | |||
| Labor Services | N/A | |||
| Equipment materials | N/A | |||
| Directional Bore 2" | $ 40.00 | 0.15 | $ 46.00 | Per Lf. |
| Directional Bore 2 - 2" | $ 45.00 | 0.15 | $ 51.75 | Per Lf. |
| Directional Bore 2 - 3" | $ 50.00 | 0.15 | $ 57.50 | Per Lf. |
| Directional Bore 1 - 3" | $ 40.00 | 0.15 | $ 46.00 | Per Lf. |
| Directional Bore 3 - 3" | $ 55.00 | 0.15 | $ 63.25 | Per Lf. |
| Directional Bore 4" | $ 45.00 | 0.15 | $ 51.75 | Per Lf. |
| Directional Bore 4 - 4" | $ 55.00 | 0.15 | $ 63.25 | Per Lf. |
Pot hole for Directional Bore $ 250.00 0.15 $ 287.50 Per Hour
Sheet1
File details come from the government source that posted it. Updated .