CTR064363_Pricing.xlsx

XLSX spreadsheet 407 KB Posted

Attached to
Master Agreement AZ|CTR064363
Contract number
CTR064363
Issued by
Arizona

About this file

This document is a comprehensive pricing sheet for ITS (Intelligent Transportation Systems) Installation, Repair and Replacement Services submitted by CS Construction, Inc. The pricing document appears to be part of a state or local government contract, though the specific jurisdiction is not explicitly named in the provided excerpt.

The pricing sheet details labor rates, equipment rates, and subcontractor pricing for various technical services. Labor classifications include electricians, signal technicians, crane operators, and project managers, with hourly rates ranging from $67 to $140. Equipment pricing covers utility trucks, boom trucks, cranes, and specialized vehicles with hourly rates between $25 and $250. The contractor offers a consistent 15% cost-plus markup for materials, traffic control services, and subcontractor work. Additional pricing components include a daily per diem rate of $150 for locations 60 miles outside Phoenix and various traffic control equipment rentals. The document provides a comprehensive rate structure for infrastructure and transportation-related installation and repair services, suggesting a detailed government contract for technical infrastructure work.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Labor Rates and Classifications

PRICING SHEET
ITS Installation, Repair and Replacement Services

OFFEROR: CS Construction, Inc.

Labor Rates

Instructions: Labor Classifications: The Contractor shall provide labor rates for any labor levels that may be applicable to the service being offered.The labor rates listed below will be used for evaluation purposes. The Contractor must use additional lines to fill in any other classifications that are being offered. Below indicate labor rates as required in paragraph 4.6.3.1 in the scope of work.

Labor ClassificiationHourly RateNotes
Electrician$105.00Port to Port
Crew Lead (Foreman)$105.00Port to Port
Signal & Lighting Technician$78.00Port to Port
Boom Truck Operator$88.00Port to Port
Backhoe Operator$85.00Port to Port
Project Manager$125.00Port to Port
Crane Operator (up to 50 TN)$140.00Port to Port
Dump Truck Driver$75.00Port to Port
Laborer$67.00Port to Port
Superintendent$130.00Port to Port
Hydrovac Truck Operator$82.00Port to Port
Fiber Optic Technician$95.00Port to Port
Per Diem / Subsistence$150.00Daily Rate per Person (Locations 60 miles outside of Phoenix)

Materials Pricing

PRICING SHEET
ITS Installation, Repair and Replacement Services

OFFEROR: CS Construciton, Inc.

Materials Pricing

Instructions: Materials Pricing: The Contractor shall provide a Cost-Plus-Fixed Percentage for any Material classifications that may be applicable to the service being offered. The Contractor must use additional lines to fill in any classifications that are being offered. Below indicate fixed percentage as required in paragraph 4.11.1 in the scope of work.

Material ClassificationsCost-Plus-Fixed Percentage (%)Notes
All Material Categories15%

Equipment Pricing

PRICING SHEET
ITS Installation, Repair and Replacement Services

OFFEROR: CS Construction, Inc.

Equipment Pricing

Instructions: Equipment Pricing: The Contractor shall provide a Hourly Rate for any Equipment that may be applicable to the service being offered.The Equipment Classifications listed below will be used for evaluation purposes. The Contractor must use additional lines to fill in any other classifications that are being offered. Below indicate equipment daily rate as required in paragraph 4.12 in the scope of work.

Equipment ClassificationHourly RateNotes
Utility/ Pickup Truck$26.00Port to Port
Boom/ Bucket Truck$65.00Port to Port
Air Compressor$26.00Port to Port
Skip Loader$35.00Port to Port
Backhoe$50.00Port to Port
Crane (up to 50 TN)$210.00Port to Port
10 Wheeler Dump Truck$250.00Port to Port
Transport Truck$65.00Port to Port
Hydrovac Truck$135.00Port to Port
Fiber Van / Trailer$45.00Port to Port
Fiber Fusion Splicer$25.00In-Use
OTDR Fiber Tester$40.00In-Use

Traffic Control Labor Pricing

PRICING SHEET
ITS Installation, Repair and Replacement Services

OFFEROR: CS Construction, Inc.

Traffic Control Labor Pricing (Sub-Contractor)

Instructions: Traffic Control Labor Pricing (Sub-Contractor): The Contractor shall provide a Cost-Plus-Fixed Percentage for any Traffic Control for Subcontractor classifications that may be applicable to the service being offered.The Traffic Control for Subcontractor Classifications listed below will be used for evaluation purposes. The Contractor must use additional lines to fill in any other classifications that are being offered. Below indicate fixed percentage as required in paragraph 4.13.4 in the Specifications.

Traffic Control (Sub-Contractor) ClassificationsCost-Plus-Fixed PercentageNotes
Uniformed Officer15%
Traffic Control Lead15%
Laborer15%
Traffic Control Device Rental15%
Traffic Control Plans15%

Traffic Control Materials

PRICING SHEET
ITS Installation, Repair and Replacement Services

OFFEROR: CS Construction, Inc.

Traffic Control Materials

Instructions: Traffic Control Materials (Contractor owned/supplied): The Contractor shall provide a daily rate for any Traffic Control Materials for Contractor Owned/supplied classifications that may be applicable to the service being offered.The Traffic Control for Contractor Owned/supplied materials listed below will be used for evaluation purposes. The Contractor must use additional lines to fill in any other classifications that are being offered. Below indicate fixed percentage as required in paragraph 4.13.7 in the Specifications.

Traffic Control Materials (Contractor owned/supplied) ClassificationsDaily RateNotes
Variable Message SignsN/ADo not own
Arrow Boards$60.00
Type I, Vertical Panel$1.00
Type II, Vertical Panel, Tubular Marker Barricade$1.00
Type III, High Level Flag Trees BarricadeN/ADo not own
Rigid Portable Sign Stands$1.00
Spring Portable Sign Stands$1.00
Type A Warning Lights$0.50
Type C Warning Lights$0.50
Truck Mounted Attenuator$500.00Without Driver
Temporary Sign Less Than 10 SQ.FT.$1.00
Temporary Sign 10 SQFT or More$1.00

Subcontractor Work Pricing

PRICING SHEET
ITS Installation, Repair and Replacement Services

OFFEROR: CS Construction, Inc.

Subcontractor Work Pricing

Instructions: Subcontractor Work Pricing: The Contractor shall provide a Cost-Plus-Fixed Percentage for any Subcontractor work classification that may be applicable to the service being offered.The Subcontractor Classifications listed below will be used for evaluation purposes. The Contractor must use additional lines to fill in any other classifications that are being offered. Below indicate fixed percentage as required in paragraph 4.30 in the Specifications.

Subcontractor ClassificationsCost-Plus-Fixed Percentage (%)Notes
Equipment Operator15%
Labor Services15%
Equipment materials15%
Drilling Subcontractor15%
Horizontal Directional Drilling Subcontractor15%
Hydrovac Subcontractor15%
Crane (35TN to 110TN)15%