CTR055743_Contract_Amendment_Summary_Four__4__.pdf

PDF 3 MB Posted

Attached to
Master Agreement AZ|CTR055743
Contract number
CTR055743
Issued by
Arizona

About this file

This document is a Contract Amendment Summary from the Arizona Department of Transportation (ADOT) for Payson Concrete & Materials Inc., specifically addressing an amendment to a contract for aggregate materials, rip rap, and sand. The amendment involves Contract Number CTR055743, which is being renewed for the fiscal year 2025-2026, with Payson Concrete & Materials Inc. as the primary contractor.

The amendment includes an extension of the contract from July 1, 2025, through June 30, 2026, and adds a new plant pick-up location in Tonto Basin, Arizona. The contract involves various aggregate materials with pricing adjustments, including Aggregate Base (Class 1 and 2), Mineral Aggregate, Rip Rap (Types A, B, and C), and various sand types. The price increases range from 3.6% to 7.5% across different line items, justified by the contractor due to inflation impacts on equipment replacement, repair costs, and production expenses. The pricing is based on ADOT and MAG (Maricopa Association of Governments) pricing models, with all line items seeing modest increases, such as Aggregate Base Class 1 rising from $19.68 to $20.40 per ton and Rip Rap Type B increasing from $46.31 to $48.00 per ton.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ARIZONA DEPARTMENT OF TRANSPORTATION

1655 W. Jackson Street, MD 100P

Phoenix, AZ 85007

Contract Amendment Summary CONTRACTOR: Payson Concrete & Materials Inc. AMENDMENT NO.: Four (4) DESCRIPTION: Aggregate Materials, Rip Rap and Sand

Rev. 03/2025

Pursuant to the Uniform Terms and Conditions, Section 5, Contract Changes, the above referenced contract is amended. Summary of changes is as follows:

1. This contract is hereby mutually extended from July 1, 2025 through June 30,2026 unless terminated, canceled or extended as otherwise provided in the contract.

2. An additional Plant Pick Up location has been added in the Arizona Procurement Portal (APP) as follows:

a. Tonto Basin Plant 487 E. Slate Creek trl.

Tonto Basin AZ, 85553

3. The line items pricing below will take effect on July 1, 2025, per the contract renewal in the Arizona

Procurement Portal (APP):

Line Item Line Item Description

Current Contract

Price

New Contract

Price

CTR055743-1 Aggregate Base: Class 1 (Tonto Basin Plant Pick Up) (ADOT Pricing) $19.68 $20.40

CTR055743-2 Aggregate Base: Class 1 (Payson Plant Pick Up) (MAG Pricing) $17.37 $18.00

CTR055743-3 Aggregate Base: Class 2 (Tonto Basin Plant Pick Up) (ADOT Pricing) $19.68 $20.40

CTR055743-4 Aggregate Base: Class 2 (Payson Plant Pick Up) (MAG Pricing) $17.37 $18.00

CTR055743-6 Mineral Aggregate: Gradation #1 - Fine (Tonto Basin Plant Pick Up) (ADOT Pricing) $23.15 $24.00

CTR055743-7 Mineral Aggregate: Gradation #2- Coarse (Tonto Basin Plant Pick Up) (ADOT Pricing) $23.15 $24.00

CTR055743-8 Rip Rap: Type A (Payson Plant Pick Up) (ADOT Pricing) $37.04 $38.40

CTR055743-9 Rip Rap: Type B (Payson Plant Pick Up) (ADOT Pricing) $46.31 $48.00

CTR055743-10 Rip Rap: Type C (Payson Plant Pick Up) (ADOT Pricing) $37.04 $37.50

CTR055743-11 Washed Concrete Sand: AZ Test 201 (Tonto Basin Plant Pick Up) (ADOT Pricing) $23.74 $24.60

CTR055743-12 Washed Mortar Sand: ASTM C144 (Tonto Basin Plant Pick Up) (ADOT Pricing) $27.78 $28.80

CTR055743-13 Crusher Fines (Payson Plant Pick Up) (ADOT Pricing) $19.68 $20.40

4. All other terms, conditions and provisions of this contract remain unchanged.

PROCUREMENT DETERMINATION

PRICE INCREASE

Cc: File Rev. 03/2025

Sections 1 through 3 MUST be completed Use Attachments as Necessary

1) Name: Megan Walker Title: Senior Procurement Specialist

Date: May 20, 2025

Contract Number: CTR055743 Contract Description: Aggregate Materials, Rip Rap & Sand

Contractor Name: Payson Concrete and Materials Inc.

2) Line Item Pricing:

See attached spreadsheet.

3) Provide justification:

Payson Concrete and Materials Inc. has requested an increase for contract CTR055743 Aggregate Materials, Rip Rap and Sand. The increase request is due to inflation impacting their equipment replacement costs, repair costs and production costs. In the past year material costs have increased 14-17%. Per the maximum increase of the fourth renewal period twenty (20%) is highest allotted increase calculated against the original contract price. An increase of 3.6% brings the total adjustment to the maximum allowed. This is determined fair and reasonable and in the best interest of the State.

To Be Completed by Procurement Authority:

APPROVAL

X Request Authorized Pursuant to A.A.C. R2-7-604A Request Denied Request Returned for Additional Information See Comments

Comments:

Approved by:

Signature:

Title:

Date:

Docusign Envelope ID: DFA46438-344F-4F7F-A15E-72495CED1AE1

Procurement Manager 5/27/2025

N/A

Product Code Name

Current Contract

Price Increase Amount New Rate

CTR055743-1 Aggregate Base: Class 1 (Plant Pick Up) (ADOT Pricing) 19.68$ 0.72$ 20.40$ CTR055743-2 Aggregate Base: Class 1 (Plant Pick Up) (MAG Pricing) 17.37$ 0.63$ 18.00$ CTR055743-3 Aggregate Base: Class 2 (Plant Pick Up) (ADOT Pricing) 19.68$ 0.72$ 20.40$ CTR055743-4 Aggregate Base: Class 2 (Plant Pick Up) (MAG Pricing) 17.37$ 0.63$ 18.00$ CTR055743-6 Mineral Aggregate: Gradation #1 - Fine (Plant Pick Up) (ADOT Pricing) 23.15$ 0.85$ 24.00$ CTR055743-7 Mineral Aggregate: Gradation #2- Coarse (Plant Pick Up) (ADOT Pricing) 23.15$ 0.85$ 24.00$ CTR055743-8 Rip Rap: Type A (Plant Pick Up) (ADOT Pricing) 37.04$ 1.36$ 38.40$ CTR055743-9 Rip Rap: Type B (Plant Pick Up) (ADOT Pricing) 46.31$ 1.69$ 48.00$ CTR055743-10 Rip Rap: Type C (Plant Pick Up) (ADOT Pricing) 37.04$ 0.46$ 37.50$ CTR055743-11 Washed Concrete Sand: AZ Test 201 (Plant Pick Up) (ADOT Pricing) 23.74$ 0.86$ 24.60$ CTR055743-12 Washed Mortar Sand: ASTM C144 (Plant Pick Up) (ADOT Pricing) 27.78$ 1.02$ 28.80$ CTR055743-13 Crusher Fines (Plant Pick Up) (ADOT Pricing) 19.68$ 0.72$ 20.40$

Licensed & Bonded No. A-38733 No. B-04-039733

Payson Concrete & Materials, Inc.

1900 E. Highway 260

Payson, AZ 85541

(928) 474-2231

To: Megan Walker, ADOT procurement

From : Payson Concrete and Materials Inc., Clayton Randall , Nelson D. Beck

Date : 5/2/2025

Subject: Necessary Pricing amendment for Aggregate Materials for ADOT 2025

Thank you for the opportunity to quote aggregate materials for the Upcoming 25/26 fiscal year.

The Pricing we are quoting is a guarantee that we will honor our 2024 list pricing through your 25/26 fiscal cycle.

As we stated in Last year’s process, due to circumstances beyond our control we need to adjust our pricing for

ADOT to keep pace with our retail pricing in order to maintain the high level of service we strive for. As justification

I have included a copy of our published pricing sheet which has been in affect since April of 2024. This is the current market pricing for these materials in this area. Not knowing what the economy holds in front of us, we are doing our best to hold these prices for all our customers in 2025, However, for non-contracted customers that may not last.

*All pricing below is FOB Payson Concrete Yard, 1900 E. Hwy 260, Payson AZ.

ADOT Aggregate matls., Rip Rap and Sand Contract amendment pricing 2025

Product code Product name Old Pricing New Pricing UOM CTR055743-1 Aggregate Base class 1 ADOT $19.68 $22.50 Ton CTR055743-2 Aggregate Base class 1 MAG $17.37 $20.50 Ton CTR055743-3 Aggregate Base Class 2 ADOT $19.68 $22.50 Ton CTR055743-4 Aggregate Base Class 2 MAG $17.37 $20.50 Ton CTR055743-5 N/A Ton CTR055743-6 Mineral Aggregate Gradation #1 $23.15 $29.50 Ton CTR055743-7 Mineral Aggregate Gradation #2 $23.15 $29.50 Ton CTR055743-8 Rip Rap: type A $37.04 $37.50 Ton CTR055743-9 Rip Rap: type B $46.31 $50.00 Ton CTR055743-10 Rip Rap: type A $37.04 $37.50 Ton CTR055743-11 Washed Concrete sand $23.74 $26.00 Ton CTR055743-12 Washed Morter Sand $27.78 $30.00 Ton CTR055743-13 Crusher Fines $19.68 $27.50 Ton

We look forward to continuing our relationship with ADOT for the 25/26 fiscal year.

Thank you, and Have a Blessed weekend.

Clayton Randall - General Manager, Nelson D. Beck - Sales and Safety

Megan Walker <mwalker2@azdot.gov>

CTR055743 Aggregate Materials - Contract Amendment Renewal

Nelson Beck <Nelson.Beck@paysonconcrete.com> Thu, May 15, 2025 at 6:53 AM To: Megan Walker <mwalker2@azdot.gov> Cc: clayton randall <pcmhotplant@gmail.com>

Hello Megan, As always, We certainly appreciate the opportunity to provide sand rock products to the Arizona Dept. of Transportation.

As is the way of the economy , Market volatility and Inflation continue to plague us significantly, Particularly, in the area of transportation of our products. Our cost per loaded mile is heavily impacted by fuel costs, truck replacement and repair costs and in order to maintain reliable help, our wages have had to increase significantly as well.

As you can see from the following web-links, The markets that effect our ability to produce and move our rock products have been extremely unstable since 2021 when we first bid this contract https://www.bls.gov/data/inflation_calculator.htm - Inflation 24% https://www.eia.gov/dnav/pet/hist/LeafHandler.ashx?n=pet&s=emd_epd2d_pte_nus_dpg&f=m - Fuel 20-30% https://fred.stlouisfed.org/series/PCU484121484121 - Freight 10-15% https://fred.stlouisfed.org/series/WPS1321 - Rock prices 16 - 25% https://fred.stlouisfed.org/series/WPUSI012011 - Construction Materials 16 - 25%

Please understand, although Delivery is not included in our bid, all of our materials are moved, blended, and processed by moving raw materials to our processing sites with trucks and powered by Diesel generators, etc.

When surveying our options in the local market, These examples are real world, up to date facts as to what our costs are to supply you with rock products in the 2024 economy and we are significantly skeptical that this will improve within the timeframe of this contract period. In fact, the Market volatility seems to be very high in comparison to previous years.

For your convenience ,in the previous correspondence, I included a copy of our 2024 published price sheets that apply to the products and services that are included in this contract as justification for our requests.

This is documentation as well of the true market value of these products and we are offering to hold Last year's pricing through the next budget cycle which concludes in 2026 (a 2 yr. timeframe). This alone is an assurance of pricing we do not guarantee to our non-contract customers.

Therefore, Next budget cycle, we once again, request a new bid process be completed for these products and services. We feel that we are very solid in our pricing in the 2025 market, especially within the Payson Area, and are happy to be included in the competitive process, However we cannot continue the contract as is, or without the most recent pricing adjustments we have offered.

5/16/25, 10:17 AM State of Arizona Mail - CTR055743 Aggregate Materials - Contract Amendment Renewal https://mail.google.com/mail/u/0/?ik=e95959737d&view=pt&search=all&permmsgid=msg-f:1832194902821848167&simpl=msg-f:1832194902821848167 1/2

Thank you again for your continued business and the opportunity to extend this contract.

Have a Blessed day, Nelson D. Beck , Clayton Randall, Payson Concrete and Materials inc.

From: Megan Walker <mwalker2@azdot.gov> Sent: Tuesday, May 13, 2025 3:31 PM [Quoted text hidden]

[Quoted text hidden]

5/16/25, 10:17 AM State of Arizona Mail - CTR055743 Aggregate Materials - Contract Amendment Renewal https://mail.google.com/mail/u/0/?ik=e95959737d&view=pt&search=all&permmsgid=msg-f:1832194902821848167&simpl=msg-f:1832194902821848167 2/2

PAYSON CONCRETE AND MATERIALS

Prices effective April 1,2024

AGGREGATE PRICES

x X x x

$30.00 $26.00 $26.00 $27.50 $22.50 $20.50 $30.00 $33.50 $28.50 $20.50 $22.50 per ton per ton per ton per ton per ton per ton per ton per ton per ton per ton

FOB PAYSON

Black AB lect AB ton

Mortar Sand Concrete Rock 1" minus Concrete Sand Chips 3/B" minus

Regular Granite 1" minus 112" Fine Granite lect Concrete Rock 314" & 1 bion Rock 4" to 9"

3/8" Fine Granite 114" Fine Granite Coarse Granite 314" to 1"

Topsoil Barrow 2" Barrow 6" Select Rip Rap Granite Rip Rap Boulders

$22.50 per ton $27.50 per ton

$22.50 per ton $37.00 per ton $19.00 per ton $17.50 per ton $46.00 per ton $37.50 per ton $62.50 per ton

FOB PINE \

AB

Select AB Chips Concrete Rock Select Concrete Rock Gabion Rock

$29.50 per ton $27.50 per ton $35.00 per ton

$33.50 per ton $31.00 per ton $36.50 per ton

Concrete Sand Mortar Sand Select 3" Minus Granite Screened Granite Top Soil

$33.50 per ton $37.50 per ton $25.00 per ton $27.50 per ton $30.50 per ton $38.50 per ton

Mortar Sand Golf Course

I

Rock Soiop bioGa $20.00 per ton $20.00 per ton

B. per ton

50 ton$28.

W

12" culvert culvert

B" culvert " culvert

30" culvert 36" cU

Callfor price Callfor price

W

Band Band - price

&20 for

PRICES SUBJECT TO CHANGE WITHOUT PRIOR NOTICE

.'1.,..:i,qg iir,'..,'ll,iil

BLS Data Viewer

Net Monthly Changes:

1-Month Net Change 3-Month Net Change

6-Month Net Change 12-Month Net Change

Percent Monthly Changes:

1-Month % Change 3-Month % Change

6-Month % Change 12-Month % Change

Latest Observation:

April 2025

201.529 Jan 2023 - Apr 2025 Minimum Value: January 2023 167.828

Maximum Value: April 2025 201.529

Data Availability:

2012 - 2025

Time Period: Start Year: 2023 End Year: 2025

Data extracted on: May 16, 2025 (1:26:49 PM)

PPI Industry Data

Series Title :

PPI industry data for Construction sand and gravel mining-Construction sand and gravel, West, not seasonally adjusted

Series ID : PCU21232121232104

Seasonality : Not Seasonally Adjusted

Survey Name : PPI Industry Data

Measure Data Type : Construction sand and gravel, West

Industry : Construction sand and gravel mining

Item : Construction sand and gravel, West

U.S. BUREAU OF LABOR STATISTICS

Permalink

Update

Co ns tr uc tio n sa nd a nd g ra ve l, W es t

PPI industry data for Construction sand and gravel mining-Construction sand and gravel, West, not seasonally adjusted

PCU21232121232104

Jan '23 Apr '23 Jul '23 Oct '23 Jan '24 Apr '24 Jul '24 Oct '24 Jan '25 Apr '25

Click and drag in the plot area to zoom in. Hover over chart to view data.

Source: U.S. Bureau of Labor Statistics.

.CSV.XLSX

2024 M06

Jun 190.117

2024 M07 2024 Jul 194.062

2024 M08

Aug 194.391

2024 M09

Sep 194.391

2024 M10 2024 Oct 193.986

2024 M11 Nov

194.276

2024 M12

Dec 194.089

Year Period Label Value

5/16/25, 10:53 AM BLS Data Viewer https://data.bls.gov/dataViewer/view/timeseries/PCU21232121232104 1/2

BLS Data Viewer

Net Monthly Changes:

1-Month Net Change 3-Month Net Change

6-Month Net Change 12-Month Net Change

Percent Monthly Changes:

1-Month % Change 3-Month % Change

6-Month % Change 12-Month % Change

Latest Observation:

April 2025

274.721 Jan 2023 - Apr 2025 Minimum Value: January 2023 238.306

Maximum Value: April 2025 274.721

Data Availability:

2003 - 2025

Time Period: Start Year: 2023 End Year: 2025

Data extracted on: May 16, 2025 (1:57:13 PM)

PPI Industry Data

Series Title : PPI industry data for Sand/gravel/clay/refractory minerals mining, not seasonally adjusted

Series ID : PCU21232-21232-

Seasonality : Not Seasonally Adjusted

Survey Name : PPI Industry Data

Measure Data Type : Sand/gravel/clay/refractory minerals mining

Industry : Sand/gravel/clay/refractory minerals mining

Item : Sand/gravel/clay/refractory minerals mining

Footnotes

U.S. BUREAU OF LABOR STATISTICS

Permalink

Update

Sa nd

/g ra ve l/ cl ay

/r ef ra ct or y m in er al s m in in g

PPI industry data for Sand/gravel/clay/refractory minerals mining, not seasonally adjusted

PCU21232-21232-

Jan '23 Apr '23 Jul '23 Oct '23 Jan '24 Apr '24 Jul '24 Oct '24 Jan '25 Apr '25

Click and drag in the plot area to zoom in. Hover over chart to view data.

Source: U.S. Bureau of Labor Statistics.

.CSV.XLSX

2023 M01

Jan 238.306

2023 M02

Feb 240.839

2023 M03

Mar 239.374

2023 M04 2023 Apr 242.302

2023 M05 May

244.623

2023 M06

Jun 243.864

2023 M07 2023 Jul 244 201

Year Period Label Value

5/16/25, 12:45 PM BLS Data Viewer https://data.bls.gov/dataViewer/view/timeseries/PCU21232-21232- 1/2

Producer Price Index by Commodity: Special Indexes:

Construction Materials (WPUSI012011)

Observations

Apr 2025: 337.023

Updated:

May 15, 2025

7:49 AM CDT

Next Release Date:

Jun 12, 2025

Units:

Index 1982=100, Not Seasonally Adjusted

Frequency:

Monthly

1Y 5Y 10Y Max

Edit Graph

Source: U.S. Bureau of Labor Statistics via FRED®

322.5

325.0

327.5

330.0

332.5

335.0

337.5

340.0

Mar 2023 May 2023 Jul 2023 Sep 2023 Nov 2023 Jan 2024 Mar 2024 May 2024 Jul 2024 Sep 2024 Nov 2024 Jan 2025 Mar 2025

Producer Price Index by Commodity: Special Indexes: Construction Materials

In d ex

2=

Shaded areas indicate U.S. recessions.

fred.stlouisfed.org

Share Graph Account Tools

Notes

Related Data and Content

Source: U.S. Bureau of Labor Statistics Release: Producer Price Index

Units: Index 1982=100, Not Seasonally Adjusted

Frequency: Monthly

Suggested Citation:

U.S. Bureau of Labor Statistics, Producer Price Index by Commodity: Special Indexes:

Construction Materials [WPUSI012011], retrieved from FRED, Federal Reserve Bank of St.

Louis; https://fred.stlouisfed.org/series/WPUSI012011, May 16, 2025.

Data Suggestions Based On Your Search

Fullscreen

5/16/25, 12:43 PM Producer Price Index by Commodity: Special Indexes: Construction Materials (WPUSI012011) | FRED | St. Louis Fed https://fred.stlouisfed.org/series/WPUSI012011# 1/3

Producer Price Index by Commodity: Nonmetallic Mineral Products: Construction Sand, Gravel, and Crushed Stone (WPS1321)

Observations

Apr 2025: 520.905

Updated:

May 15, 2025

7:56 AM CDT

Next Release Date:

Jun 12, 2025

Units:

Index 1982=100, Seasonally Adjusted

Frequency:

Monthly

1Y 5Y 10Y Max

Edit Graph

Source: U.S. Bureau of Labor Statistics via FRED®

Mar 2023 May 2023 Jul 2023 Sep 2023 Nov 2023 Jan 2024 Mar 2024 May 2024 Jul 2024 Sep 2024 Nov 2024 Jan 2025 Mar 2025

Producer Price Index by Commodity: Nonmetallic Mineral Products: Construction Sand, Gravel, and Crushed Stone

In d ex

2=

Shaded areas indicate U.S. recessions.

fred.stlouisfed.org

Share Graph Account Tools

Notes

Related Data and Content

Source: U.S. Bureau of Labor Statistics Release: Producer Price Index

Units: Index 1982=100, Seasonally Adjusted

Frequency: Monthly

Suggested Citation:

U.S. Bureau of Labor Statistics, Producer Price Index by Commodity: Nonmetallic Mineral

Products: Construction Sand, Gravel, and Crushed Stone [WPS1321], retrieved from FRED, Federal Reserve Bank of St. Louis; https://fred.stlouisfed.org/series/WPS1321, May 16, 2025.

Data Suggestions Based On Your Search

Fullscreen

5/16/25, 12:43 PM Producer Price Index by Commodity: Nonmetallic Mineral Products: Construction Sand, Gravel, and Crushed Stone (WPS1321) | FRED | St. Louis Fed https://fred.stlouisfed.org/series/WPS1321# 1/3

File details come from the government source that posted it. Updated .