CP012926 Cost Proposal.xlsx
XLSX spreadsheet 55 KB Posted
- Attached to
- North Campus Painting
- Solicitation number
- CP012926
- Issued by
- Connecticut
About this file
This is a Cost Proposal form for the North Campus Painting project (CP012926) submitted by a contractor to the State of Connecticut. The project involves painting work across multiple campus buildings, with the base bid scope covering Fairfield and Tolland Halls. Two alternates are available for consideration: Alternate #1 encompasses Litchfield Hall, and Alternate #2 encompasses New Haven Hall. The cost proposal requires contractors to distribute costs across a standardized division structure that includes General Requirements, Existing Conditions, Finishes, and other applicable work categories. All costs must be inclusive of labor, materials, equipment, taxes, insurance, bonds, overhead, profit, small tools, travel, parking, and supervision necessary to complete the full scope of work.
The cost proposal form requires contractors to submit a total bid amount in both figures and words, with the amount shown in words governing in case of discrepancy. Contractors must also provide separate pricing for each alternate, which remain valid for the life of the project and may be accepted or rejected prior to contract award. The project explicitly requires that only contractors with painting experience are eligible to submit cost proposals and statements of qualification. The form is a standardized pricing sheet that cannot be modified, with any modifications potentially resulting in bid disqualification.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule of Values
| COST PROPOSAL | ||
| PROJECT NUMBER: | CP012926 | |
| PROJECT NAME: | North Campus Painting | |
| CONTRACTOR NAME: | ||
| SCHEDULE OF VALUES | ||
| Contractor agrees that the Schedule of Values submitted with this bid is a true representation of the distribution of the costs of this Project. Please indicate N/A for those divisions of work not applicable. Divisions that are not listed below are reserved for future use. The costs provided below shall include the complete cost for furnishing and installing of materials, labor, and equipment required to provide the complete scope of work for each specified division (includes the costs of applicable taxes, insurance, bonds, overhead, profit, small tools, travel, parking, supervision, etc.). | ||
| DIVISION | GROUP | AMOUNT |
| 0 | Procurement and Contracting Requirements | N/A |
| 1 | General Requirements | |
| 2 | Existing Conditions | |
| 3 | Concrete | |
| 4 | Masonry | |
| 5 | Metals | |
| 6 | Wood, Plastics, Composites | |
| 7 | Thermal & Moisture Protection | |
| 8 | Openings | |
| 9 | Finishes | |
| 10 | Specialties | |
| 11 | Equipment | |
| 12 | Furnishings | |
| 13 | Special Construction | |
| 14 | Conveying Equipment | |
| 21 | Fire Suppression | |
| 22 | Plumbing | |
| 23 | Heating, Ventilating, and Air Conditioning (HVAC) | |
| 25 | Integrated Automation | |
| 26 | Electrical | |
| 27 | Communications | |
| 28 | Electronic Safety and Security | |
| 31 | Earthwork | |
| 32 | Exterior Improvements | |
| 33 | Utilities | |
| 34 | Transportation | |
| 35 | Waterway and Marine Construction | |
| 40 | Process Integration | |
| 41 | Material Processing and Handling Equipment | |
| 42 | Process Heating, Cooling and Drying Equipment | |
| 43 | Process Gas and Liquid Handling, Purification and Storage Equipment | |
| 44 | Pollution and Waste Control Equipment | |
| 45 | Industry Specific Manufacturing Equipment | |
| 46 | Water and Wastewater Equipment | |
| 48 | Electrical Power Generation |
TOTAL BID AMOUNT: $ - 0
TOTAL BID AMOUNT
(IN WORDS):
Show the Total Bid Amount in both words and figures. In case of discrepancy, the amount shown in words will govern.
&8Pricing Sheet Rev. 102020 &8Do not modify this form. Modification of this form may be consider ground for disqualification of your bid. &8Page &P of &N
Alternates
| COST PROPOSAL | ||
| PROJECT NUMBER: | CP012926 | |
| PROJECT NAME: | North Campus Painting | |
| CONTRACTOR NAME: | ||
| SCHEDULE OF ALTERNATES | ||
| Provide a Price for each Alternate listed. The costs provided below are inclusive of all labor, materials (where applicable), direct and indirect costs, and overhead and profit. Alternates may be accepted or rejected prior to contract award. Rejected Alternates may be accepted after contract execution based on mutually agreed upon conditions of acceptance between the Contractor and Owner. Alternates shall remain valid for the life of the Project. | ||
| ALTERNATE NUMBER | DESCRIPTION | AMOUNT |
| Alternate #1 | Base bid is Fairfield and Tolland Halls; Alternate 1 is Litchfield Hall | |
| Alternate #2 | Base bid is Fairfield and Tolland Halls; Alternate 2 is New Haven Hall |
&8Pricing Sheet Rev. 102020 &8Do not modify this form. Modification of this form may be consider ground for disqualification of your bid. &8Page &P of &N image1.jpeg
File details come from the government source that posted it. Updated .