CP011326 Cost Proposal.xlsx

XLSX spreadsheet 55 KB Posted

Attached to
North Campus Flooring Replacement
Solicitation number
CP011326
Issued by
Connecticut

About this file

This is a Cost Proposal form for Connecticut's North Campus Flooring Replacement project (CP011326). The document establishes the Schedule of Values framework that contractors must use to submit their bid pricing. The project requires flooring replacement work across multiple campus buildings, with the base bid scope covering Fairfield and Tolland Halls. Two alternate bid options are available: Alternate #1 for Litchfield Hall and Alternate #2 for New Haven Hall. Contractors must demonstrate experience in flooring work to be eligible for submission. The cost proposal requires itemization across standard MasterFormat division categories, though most divisions are marked as not applicable to this specific project, with primary costs anticipated in the Finishes division.

The Schedule of Values requires contractors to provide fully inclusive pricing that covers all labor, materials, equipment, taxes, insurance, bonds, overhead, profit, small tools, travel, parking, and supervision for each division of work. The total bid amount must be expressed in both numerical figures and written words, with the written amount governing in case of discrepancy. Alternates may be accepted or rejected prior to contract award, and rejected alternates may be reconsidered after contract execution through mutual agreement. All alternate pricing remains valid for the life of the project. The form specifically prohibits modification, with any changes potentially resulting in bid disqualification.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Schedule of Values

COST PROPOSAL
PROJECT NUMBER:CP011326
PROJECT NAME:North Campus Flooring Replacement
CONTRACTOR NAME:
SCHEDULE OF VALUES
Contractor agrees that the Schedule of Values submitted with this bid is a true representation of the distribution of the costs of this Project. Please indicate N/A for those divisions of work not applicable. Divisions that are not listed below are reserved for future use. The costs provided below shall include the complete cost for furnishing and installing of materials, labor, and equipment required to provide the complete scope of work for each specified division (includes the costs of applicable taxes, insurance, bonds, overhead, profit, small tools, travel, parking, supervision, etc.).
DIVISIONGROUPAMOUNT
0Procurement and Contracting RequirementsN/A
1General Requirements
2Existing Conditions
3Concrete
4Masonry
5Metals
6Wood, Plastics, Composites
7Thermal & Moisture Protection
8Openings
9Finishes
10Specialties
11Equipment
12Furnishings
13Special Construction
14Conveying Equipment
21Fire Suppression
22Plumbing
23Heating, Ventilating, and Air Conditioning (HVAC)
25Integrated Automation
26Electrical
27Communications
28Electronic Safety and Security
31Earthwork
32Exterior Improvements
33Utilities
34Transportation
35Waterway and Marine Construction
40Process Integration
41Material Processing and Handling Equipment
42Process Heating, Cooling and Drying Equipment
43Process Gas and Liquid Handling, Purification and Storage Equipment
44Pollution and Waste Control Equipment
45Industry Specific Manufacturing Equipment
46Water and Wastewater Equipment
48Electrical Power Generation

TOTAL BID AMOUNT: $ - 0

TOTAL BID AMOUNT

(IN WORDS):

Show the Total Bid Amount in both words and figures. In case of discrepancy, the amount shown in words will govern.

&8Pricing Sheet Rev. 102020 &8Do not modify this form. Modification of this form may be consider ground for disqualification of your bid. &8Page &P of &N

Alternates

COST PROPOSAL
PROJECT NUMBER:CP011326
PROJECT NAME:North Campus Flooring Replacement
CONTRACTOR NAME:
SCHEDULE OF ALTERNATES
Provide a Price for each Alternate listed. The costs provided below are inclusive of all labor, materials (where applicable), direct and indirect costs, and overhead and profit. Alternates may be accepted or rejected prior to contract award. Rejected Alternates may be accepted after contract execution based on mutually agreed upon conditions of acceptance between the Contractor and Owner. Alternates shall remain valid for the life of the Project.
ALTERNATE NUMBERDESCRIPTIONAMOUNT
Alternate #1Base bid is Fairfield and Tolland Halls; Alternate 1 is Litchfield Hall
Alternate #2Base bid is Fairfield and Tolland Halls; Alternate 2 is New Haven Hall

&8Pricing Sheet Rev. 102020 &8Do not modify this form. Modification of this form may be consider ground for disqualification of your bid. &8Page &P of &N image1.jpeg

File details come from the government source that posted it. Updated .