Cost Sheet.xlsx

XLSX spreadsheet 27 KB Posted

Attached to
DHEC DAMS SAFETY GENERAL CONSTRUCTION
Solicitation number
5400025935
Issued by
Richland County, South Carolina

About this file

This is a cost sheet for the South Carolina Department of Health and Environmental Control (DHEC) Dams Safety General Construction RFP 5400025935. The document serves as a pricing workbook that vendors must complete to submit hourly rate proposals for heavy equipment, non-heavy equipment, personnel, and materials. The heavy equipment section includes 44 line items covering loaders, dozers, excavators, graders, cranes, dump trucks, grinders, and specialty equipment such as vacuum trucks and hydroseeds. The non-heavy equipment section lists 35 items including pumps, generators, hoses, vehicles, and a work boat. The personnel section specifies 15 labor categories ranging from project executives and managers to skilled laborers, DOT-certified truck drivers, and SCUBA divers.

Vendors must submit pricing for all equipment and personnel categories on an hourly basis and establish a markup percentage for all materials purchased at cost. The cost sheet explicitly prohibits any alterations to the workbook and requires submission in Excel format only. Additional narrative may be included where indicated. The pricing structure allows DHEC to evaluate vendor costs across multiple equipment classes and labor categories to support dam safety and general construction activities. No specific project quantities, timelines, award dates, or contract terms are detailed in this cost sheet, which functions as a standardized rate proposal template rather than a complete project specification.

View the file

Other files

File Type Posted
Solicitation.pdf PDF
Statement of No Award.pdf PDF
Disclosure of Potential Conflict of Interest.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Heavy Equipment

PRICING WORKBOOKVendor Name:
SCDHECDams Safety General ConstructionRFP 5400025935
Summary of Costs
This cost sheet must not be altered in any way.
Entire workbook must be submitted in Excel format.
If additional narrative is needed, please include where indicated.
Item #Heavy EquipmentUnitUnit Price
H.1JD 544 Wheel Loader with Debris GrappleHour
H.2JD 644 Wheel Loader with Debris GrappleHour
H.3Extend-a-Boom Forklift with Debris GrappleHour
H.4753 Bobcat Skid Steer Loader with Debris GrappleHour
H.5753 Bobcat Skid Steer Loaded with BucketHour
H.6753 Bobcat Skid Steer Loader with Street SweeperHour
H.730-50 HP Farm Tractor with Box Blade or RakeHour
H.82 - 2.5 Cu. Yd. Articulated Loader with BucketHour
H.93 - 4 Cu. Yd. Articulated Loader with BucketHour
H.104 - 6 Cu. Yd. Articulated Loader with BucketHour
H.11JD 648E Log SkidderHour
H.12CAT D4 DozerHour
H.13CAT D6 DozerHour
H.14CAT D8 DozerHour
H.15CAT 12M Motor GraderHour
H.16CAT 14M Motor GraderHour
H.17JD690 Trackhoe with Debris GrapleHour
H.18CAT 336 ExcavatorHour
H.19CAT 349 ExcavatorHour
H.20Rubber-Tired Trackhoe with Debris GrappleHour
H.21JD310 Rubber-Tired Backhoe with Bucket and HoeHour
H.22Rubber-Tired Excavator with Debris GrappleHour
H.23210 Prentiss Knucklboom with Debris GrappleHour
H.24Self-Loader Scraper CAT 623Hour
H.25300 - 400 HP Tub GrinderHour
H.26800 - 1,000 HP Diamond Z Tub GrinderHour
H.2730 Ton CraneHour
H.2850 Ton CraneHour
H.29100 Ton Crane (8 hours minimum)Hour
H.3040' - 60' Bucket TruckHour
H.31Sel-loading Dump Truck with Knuckleboom and Debris GrappleHour
H.32Single Axle Dump Truck, 5 - 12 Cu. Yd.Hour
H.33Tandem Dump Truck, 16 - 20 Cu. Yd.Hour
H.34Tri-Axle Dump Truck, 21 - 30 Cu. Yd.Hour
H.35Tri-Axle Dump Truck, 31 - 40 Cu. Yd.Hour
H.36Quad-Axle Dump TruckHour
H.37Trailer Dump, 24 - 40 Cu. Yd.Hour
H.38Trailer Dump, 61 - 80 Cu. Yd.Hour
H.39Vaccum TruckHour
H.40Off Road Truck - 25 TonHour
H.41Off Road Truck - 40 TonHour
H.42Power ScreenHour
H.43Stacking ConveyorHour
H.44HydroseederHour

Equipment (non-heavy)

PRICING WORKBOOKVendor Name:
SCDHECDams Safety General ConstructionRFP 5400025935
Summary of Costs
This cost sheet must not be altered in any way.
Entire workbook must be submitted in Excel format.
If additional narrative is needed, please include where indicated.
Item #Equipment (not-Heavy)UnitUnit Price
E.1Equipment Transports - LowboyHour
E.2Pickup TruckHour
E.3Service TruckHour
E.4Portable Light PlantHour
E.5Hand Fed Debris ChipperHour
E.66" Trash PumpHour
E.78" Trash PumpHour
E.810" Trash PumpHour
E.912" Trash PumpHour
E.101" Diaphraghm PumpHour
E.112" Diaphraghm PumpHour
E.122" Diaphraghm Pump - SSHour
E.133" Diaphraghm PumpHour
E.141" Suction or Discharge Hose per 100'Hour
E.152" Suction or Discharge Hose per 100'Hour
E.163" Suction or Discharge Hose per 100'Hour
E.172" Chemical Suction or Discharge Hose per 100'Hour
E.183" Chemical Suction or Discharge Hose per 100'Hour
E.196" Intake Hose per 100'Hour
E.208" Intake Hose per 100'Hour
E.2110" Intake Hose per 100'Hour
E.2212" Intake Hose per 100'Hour
E.236" Outtake Hose per 100'Hour
E.248" Outtake Hose per 100'Hour
E.2510" Outtake Hose per 100'Hour
E.2612" Outtake Hose per 100'Hour
E.2720kw GeneratorHour
E.2856kw GeneratorHour
E.29100kw GeneratorHour
E.30175kw GeneratorHour
E.31240 kw GeneratorHour
E.32320kw GeneratorHour
E.33500kw GeneratorHour
E.34Work boat with motorHour
E.35Chain SawHour

Personnel

PRICING WORKBOOKVendor Name:
SCDHECDams Safety General ConstructionRFP 5400025935
Summary of Costs
This cost sheet must not be altered in any way.
Entire workbook must be submitted in Excel format.
If additional narrative is needed, please include where indicated.
Personnel DescriptionUnitUnit Price
Project ExecutiveHour
Project ManagerHour
Safety managerHour
ForemanHour
Working ForemanHour
Project CoordinatorHour
Project EngineerHour
Project ClerkHour
Safety InspectorHour
Climber with gearHour
Saw hand with chainsawHour
FlagmenHour
LaborerHour
Skilled LaborerHour
DOT Certified Truck DriverHour
SCUBA DiverHour

Materials

PRICING WORKBOOKVendor Name:
SCDHECDams Safety General ConstructionRFP 5400025935
Summary of Costs
This cost sheet must not be altered in any way.
Entire workbook must be submitted in Excel format.
If additional narrative is needed, please include where indicated.
MaterialsUnitMark-Up
All materials purchased for project scope will be billed at-cost plust contractor's mark-up percentage.%