Cost Breakdown Hudson Driveway.xlsx
XLSX spreadsheet 79 KB Posted
- Attached to
- Hudson Driveway Replacement State and local contract opportunity
- Solicitation number
- 2135281
- Issued by
- Westchester County, New York
About this file
This file is a Cost Breakdown Form for the Hudson Driveway Replacement project, a request for quotation (RFQ) issued by the New York Office for People With Developmental Disabilities (OPWDD) Hudson Valley Developmental Services Office. The project involves driveway replacement work at Hudson IRA located at 47 Narragansett Avenue, Ossining, NY 10562. The scope of work includes materials such as stone, Type 6 asphalt (top layer), Type 3 asphalt (binder), and liquid bituminous emulsion tack coat. A mandatory site visit is required for all vendors, scheduled for either Thursday, May 28, 2026 at 10:45 AM or Friday, May 29, 2026 at 1:45 PM, with attendance confirmation required through John Knopf at (845) 499-5244 or john.knopf@opwdd.ny.gov. Late arrivals will not be permitted to sign in or submit quotes. The awarded vendor must provide a one-year warranty on materials and labor and demonstrate two years of relevant experience on similar projects.
The Cost Breakdown Form requires vendors to itemize all costs in three sections: materials, equipment, and labor. All labor rates must correspond to the New York State Department of Labor prevailing wage schedule. The form includes line items for materials pricing, equipment costs, and labor hours with hourly rates. OPWDD reserves the right to reject any and all quotes and will award the contract to the most responsible and responsive vendor providing the lowest cost while meeting all scope of work requirements. Vendors must adhere to project timelines outlined in the scope of work, with the awarded contractor subject to vendor responsibility determination.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| 2026012637HudsonDriveway.pdf | ||
| DOL Certified Payroll form wh347.pdf | ||
| RFQ&ScopeHudsonDriveway.pdf | ||
| W9 Form.pdf | ||
| Quote Proposal Hudson Driveway.docx | DOCX document | |
| CONTRACTORS REFERENCES fillable.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Vendor Cost Breakdown Form | |
| This form will serve as a cost breakdown of your proposed quote. It is broken down into three sections: materials, labor, overhead and profit. Please complete this form in its entirety. When entering the materials, be as descriptive as possible i.e; color, measurements, brand, etc. When entering labor titles and hourly rates, be sure to use the provided NYS DOL prevailing wage schedule to ensure it corresponds. Method of Award: This is an RFQ (request for quotes). This is not an IFB (bid). This project will be awarded to the most responsible and responsive vendor that provides the lowest cost and meets the requirements detailed in the scope of work. Only quotes judged to be responsive to the submission requirements set forth in the invitation will be evaluated. OPWDD reserves the right to reject any and all quotes. |
Jones, Katrina (OPWDD): Jones, Katrina (OPWDD):
Read carefully.
Project Title: Hudson Driveway Replacement Jones, Katrina (OPWDD): Jones, Katrina (OPWDD):
Enter the CR list number and project name.
Project Location: Hudson IRA - 47 Narragansett Avenue, Ossining, NY 10562 Jones, Katrina (OPWDD): Jones, Katrina (OPWDD):
Enter the address where the project is located.
| Vendor Name: | FEIN ID: | ||||||
| Name of person submitting quote: | Contact email: | ||||||
| DWG. # | Description | Quantity Tons | Calc. | Unit | Cost of Material | Total Cost of Materials |
| Materials |
| 1. Stone: Item 4 |
Jones, Katrina (OPWDD): Jones, Katrina (OPWDD):
| Enter materials here. | $ - 0 | $ - 0 | |||
| 2 Top Type 6 Asphalt | $ - 0 | $ - 0 | |||
| 3 Binder Type 3 Asphalt | $ - 0 | $ - 0 | |||
| 4 Liquid Bituminous, Emulsion tack coat | $ - 0 | $ - 0 | |||
| 5 | $ - 0 | $ - 0 | |||
| 6 | $ - 0 | $ - 0 | |||
| 7 | $ - 0 | $ - 0 | |||
| 8 | $ - 0 | $ - 0 | |||
| 9 | $ - 0 | $ - 0 | |||
| Subtotal Materials | $ - 0 |
| Description | Quantity | Cost of Equipment | Total Cost of Equipment | |
| Equipment | ||||
| 2,5/A301, 1/A302 | 1 |
Jones, Katrina (OPWDD): Jones, Katrina (OPWDD):
| Enter equipment here. | $ - 0 | $ - 0 | ||||
| 2,5/A301, 1/A302 | 2 | $ - 0 | $ - 0 | |||
| 2,5/A301, 1/A302 | 3 | $ - 0 | $ - 0 | |||
| 2,5/A301, 1/A302 | 4 | $ - 0 | $ - 0 | |||
| Subtotal Equipment | $ - 0 |
| Description | Number of Hours | Base Pay Rate Per Hour | Total Pay | |
| Labor | ||||
| 7/A301 | 1 |
Jones, Katrina (OPWDD): Jones, Katrina (OPWDD):
Enter labor title/s as per NYS DOL prevailing wage schedule provided.
Jones, Katrina (OPWDD): Jones, Katrina (OPWDD):
Read carefully.
Jones, Katrina (OPWDD): Jones, Katrina (OPWDD):
Enter the CR list number and project name.
Jones, Katrina (OPWDD): Jones, Katrina (OPWDD):
Enter the address where the project is located.
Jones, Katrina (OPWDD): Jones, Katrina (OPWDD):
Enter your company name.
Jones, Katrina (OPWDD): Jones, Katrina (OPWDD):
Enter the first and last name of the person submitting the quote.
Jones, Katrina (OPWDD): Jones, Katrina (OPWDD):
Enter equipment here.
Jones, Katrina (OPWDD): Jones, Katrina (OPWDD):
Enter your FEIN ID number.
Jones, Katrina (OPWDD): Jones, Katrina (OPWDD):
Enter your email address.
Jones, Katrina (OPWDD): Jones, Katrina (OPWDD):
| Enter materials here. | $ - 0 | $ - 0 | ||||
| 7/A301 | 2 | $ - 0 | $ - 0 | |||
| 7/A301 | 3 | $ - 0 | $ - 0 | |||
| 3,6, 7/A301 | 4 | $ - 0 | $ - 0 | |||
| 5 | $ - 0 | $ - 0 | ||||
| 6 | $ - 0 | $ - 0 | ||||
| 7 | $ - 0 | $ - 0 | ||||
| 2/A301, 1/A302 | 8 | $ - 0 | $ - 0 | |||
| 7/A301 | 9 | $ - 0 | $ - 0 | |||
| 6, 8/A301 | 10 | $ - 0 | $ - 0 | |||
| Subtotal Labor | $ - 0 |
| Description | Cost of OH & P | Total OH & P |
| Overhead & Profit | ||
| 1 Overhead/Profit | $ - 0 | $ - 0 |
| 2 | $ - 0 | $ - 0 |
Subtotal OH & P $ - 0
TOTAL $ - 0
File details come from the government source that posted it. Updated .