Cost Breakdown.xlsx

XLSX spreadsheet 34 KB Posted

Attached to
Passenger and Freight Elevator Modernization, Lansing, Michigan Federal contract opportunity
Solicitation number
47PF0020R0025
Issued by
General Services Administration Public Buildings Service Region 5

About this file

This document provides a cost breakdown and solicitation notice for a passenger and freight elevator modernization contract. The General Services Administration seeks to modernize two elevators at the Charles E. Chamberlain Federal Building in Lansing, Michigan under a single-award contract. Work includes replacing elevator equipment and controls, renovating elevator cabs and machine rooms, installing new lighting and HVAC systems, and upgrading to current safety codes. The project duration is 245 calendar days with a cost estimate between $1 million and $5 million. The procurement is set aside for small businesses in NAICS code 238290 with a size standard of $16.5 million. Proposals are due as specified in the solicitation and will be evaluated for both price and non-price factors, with technical factors significantly outweighing price.

View the file

Other files for this federal contract opportunity

Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

CONSTRUCTION COST BREAKDOWN
CONTRACT FOR :Lansing Passenger and Freight Elevator ModernizationWORK LOCATIONCharles E. Chamberlain Federal Bldg
SOLICITATION:47PF0020R0025Lansing, Michigan
LINEUNITSQUANTITYMATERIAL COSTSLABOR COSTSOTHERLINE
NO.UNITSTOTALMN HRSRATETOTALCOSTSTOTAL
Line Item 0001
DIV 1General Requirements
Profit
Over-head

DIV 2-7 Lead mitigation, Asbestos abatement, General Demo

DIV 5 Pit Ladder

DIV 8 Doors

DIV 9-10 Painting, Epoxy flooring, 2 Hr Fire Ceiling, Wall Patching, Base, etc

DIV 14 Elevator Work, Demo, New cab, Controls, Warranty, Testing, Cab interior, hoistway components, door operators, etc.

DIV 21 Sprinklers

DIV 22-23 HVAC, Split System, Demo, Line Sets, Refrigerant, Condensate, etc

DIV 26 Electrical Demo, Lighting, Shunt Trip, HVAC Power, Machine Room Power, etc

DIV 27 BAS Controls and Programming

Project Manager

Superintendant

Security Clearances

Submittals

Shop Drawings

Miscellaneous

Total Line Item 0001
$

Line Item 0002

DIV 1General Requirements
Profit
Over-head

DIV 2-7 Lead mitigation, Asbestos abatement, General Demo

DIV 5 Pit Ladder

DIV 8 Doors

DIV 9-10 Painting, Epoxy flooring, 2 Hr Fire Ceiling, Wall Patching, Base, etc

DIV 14 Elevator Work, Demo, New cab, Controls, Warranty, Testing, Cab interior, hoistway components, door operators, etc.

DIV 21 Sprinklers

DIV 22-23 HVAC, Split System, Demo, Line Sets, Refrigerant, Condensate, etc

DIV 26 Electrical Demo, Lighting, Shunt Trip, HVAC Power, Machine Room Power, etc

DIV 28 Fire Alarm

Project Manager

Superintendant

Security Clearances

Submittals

Shop Drawings

Miscellaneous
Total Line Item 0002
$
Total Line Items 0001 & 0002
$