Passenger and Freight Elevator Modernization, Lansing, Michigan Federal contract opportunity
Solicitation number
47PF0020R0025
Issued by
General Services Administration Public Buildings Service Region 5

About this file

This solicitation notice seeks proposals for a passenger and freight elevator modernization project at the Charles E. Chamberlain Federal Building in Lansing, Michigan. The project includes replacing elevator equipment and controls to improve performance and safety, bringing the elevator into compliance with current codes. Work will replace cabs, call stations, indicators, and add dedicated emergency phones. Machine rooms will receive new doors and HVAC. Pits will be painted and fitted with new access ladders and sump pumps. The hoistway and landings will be painted with new lighting. Proposals are due within 245 calendar days of notice to proceed. The project value is between $1,000,000 to $5,000,000. The procurement is set aside for small businesses only under NAICS code 238290 with a size standard of $16.5M. Proposals will be evaluated on price and non-price factors, with technical factors significantly more important than price. Offerors should monitor the Federal Business Opportunities website for amendments. Questions may be directed to the contracting officer or contract specialist listed.

View the file

Other files for this federal contract opportunity

Other files attached to Passenger and Freight Elevator Modernization, Lansing, Michigan, newest first.
File Type Posted
Clarification Questions and Answers.pdf PDF
Amendment 0003 Elevator Modernization Lansing MI.pdf PDF
Virtual Site Visit 2.mov MOV file
Virtual Site Visit.mov MOV file
Pre-Proposal Conference Attendance Sheet.pdf PDF
Elevator Pre-proposal Agenda.pdf PDF
Amendment 0002 Elevator Modernization Lansing MI .pdf PDF
Amendment 0001 Elevator Modernization Lansing MI.pdf PDF
Amendment 0001 Elevator Modernization Lansing MI.pdf PDF
Lansing Elev 3 100 drawings - Base Contract.pdf PDF
RFP Passenger and Freight Elevator Modernization.pdf PDF
Cost Breakdown.xlsx XLSX spreadsheet
Lansing Elev 4 100 drawings - Option Work.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

R10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

General Services Administration AMD, Northern Construction Team 230 S. Dearborn St.

Chicago, IL 60604

Same as Block 6 x

47PF0020R0025

March 6, 2020 x x 1

4. REQUISITION/PURCHASE REQUISITION NUMBER

EQ5P2SS3P3-20-0001

5P1QCB

effect.Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and

1 1

PAGE OF PAGES

x

All other terms and conditions not addressed herein remain unchanged and in full force and effect

AMENDMENT/MODIFICATION NUMBER 2.

Please see the attached.

RFP 47PF0020R0025 Amendment 0004 - "Passenger and Freight Elevator Modernization" at the Charles E. Chamberlain Federal Building in Lansing, MI

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

May 7, 2020

EFFECTIVE DATE 3.

47PF0020R0025

Amendment 0004

Charles E Chamberlain U.S. Courthouse Lansing, MI

The purpose of this amendment is to address RFIs and incorporate the following changes:

A. The proposal due date is hereby extended to no later than 11:00AM (CST) May 27, 2020.

B. The following design specification changes are hereby incorporated

a. For Elevator No. 3, Revise General Marble Notes on Sheet G-003 to read “Show on Drawings where new work is going to be installed that impacts the historic surfaces of the 1st Floor and 2nd Floor Public Corridors. This includes call stations and signal fixtures. Include Drawings in Plan and in Elevation.“

b. For Elevator No. 3, revise Specification 02 83 00, Paragraph 1.1.A Summary in its entirety to read:

1. Lead-based paint is present in the project area.

a. Basement wall paint on Corridor / Lobby side of Elevator Hoistway and Elevator Machine Room.

b. First floor wall paint on Corridor / Lobby side of Elevator Hoistway.

c. Mezzanine wall paint on Landing side of Elevator Hoistway.

d. Second floor wall paint on Corridor / Lobby side of Elevator

Hoistway.

c. For Elevator No. 4, Specification 02 83 00 Paragraph 1.1.A Summary is updated as follows:

1. Lead-based paint is present in the project area.

a. Gray paint on metal cab wall (Elevator #4)

b. Off-white paint on metal door and frame at elevator machine room

(Elevator #4)

c. Basement wall paint on Corridor / Lobby side of Elevator Hoistway and Elevator Machine Room.

d. First floor wall paint on Corridor / Lobby side of Elevator Hoistway.

e. Column and beam (pair of channels) with green paint in Machine

Room. Assume painted bolts will need to be disturbed to accommodate construction.

d. For both Elevators No. 3 and No. 4, paint all existing steel elevator door frames at all floors. As noted in the documents, the elevator hoistway doors (doors seen from the Lobby side) are to be replaced on all floors. Paint these new doors and the existing frames to match the existing paint color - each floor’s paint color varies.

e. For Elevator No. 3 Machine Room door, provide the following scope:

i. Demolish existing hollow metal door and associated hardware. The existing door frame is fully grouted hollow metal and shall remain. GSA shall consider this existing frame part of the fire rated assembly.

ii. Disregard references to Sheet A601 / Door Schedule in Sections 08 11 13 and 08 71 00.

iii. Paint new door and existing door frame.

iv. The new door and hardware shall be as follows:

Door: Painted Hollow Metal - 90 Minute Fire Rated Door Size: 7’-0”H x 3’-0”W x 1.75”Thick (Field verify size) Frame: Existing to remain - Painted Hollow Metal Door hardware:

3 pairs of hinges Mortise lockset (Storage function, always unlocked for exiting) Closer Threshold Wall stop Removable key core (building standard)

f. For Elevator No. 4 Machine Room door, provide the following scope:

i. Demolish existing wood door and associated hardware. The existing door frame is fully grouted hollow metal and shall remain. GSA shall consider this existing frame part of the fire rated assembly.

ii. Disregard references to Sheet A601 / Door Schedule in Sections 08 11 13 and 08 71 00.

iii. Paint new door and existing door frame.

iv. The new door and hardware shall be as follows:

Door: Painted Hollow Metal - 90 Minute Fire Rated Door Size: 7’-0”H x 3’-0”W x 1.75”Thick (Field verify size) Frame: Existing to remain - Painted Hollow Metal Door hardware:

3 pairs of hinges Mortise lockset (Storage function, always unlocked for exiting) Closer Threshold Wall stop Removable key core (building standard)

g. For Elevator No. 4 sheave platform access door, provide the following scope:

i. Demolish existing wood door and associated hardware. The existing door frame is fully grouted hollow metal and shall remain. GSA shall consider this existing frame part of the fire rated assembly.

ii. Disregard references to Sheet A601 / Door Schedule in Sections 08 11 13 and 08 71 00.

iii. Paint new door and existing door frame.

iv. The new door and hardware shown on Drawing Sheet A-102 shall be as follows:

Door: Painted Hollow Metal - 90 Minute Fire Rated Door Size: 4’-0”H x 3’-0”W x 1.75”Thick (Field verify size) Frame: Existing to remain - Painted Hollow Metal Door hardware:

2 pairs of hinges Mortise lockset (Storage function, always unlocked from platform) Closer with hold open function Threshold Wall stop Removable key core (building standard); keyed to match machine room

h. The BAS panel and workstation is located in the very farthest room in the northwest corner of the Basement level. Besides the Lobby area in front of Elevator No. 3 which has a lay-in ACT ceiling, there are no ceilings along the path to reach this room in the corner. Assume all walls are concrete block to deck.

i. For Elevator No. 4 Machine Room, Drawing A-201 Elevation 5 shows a new support beam. The existing beam is actually a pair of channels sandwiched on either side of the column. The channels are through-bolted to the flange of the W section column. The existing hoist machine deflector sheave support beams may be retained and reused if compatible with the new elevator hoist machine, secondary braking device, deflector sheaves and associated components.

However, industry standards and the majority of hoist machines no longer require the existing deflector sheave arrangement. For bidding purposes, the new beam (or channels) will be the Contractor’s determination if they are needed and sized as required for the machinery the bidder chooses. The pair of existing steel channels are approximately 6 foot long C10x25 channels.

j. For Elevator No. 3, the sump requirements are clarified as follows:

i. Revise Specification Section 03 30 00 Paragraph 1.1.A to read: “Scope:

Cut existing concrete slab in hoistway to accommodate new fiberglass sump. At the new sump, cast in place concrete may be used in lieu of patching material at the choice of the Contractor.”

ii. At Elevator No. 3, include a cutting the existing slab of the hoistway pit and install a new fiberglass sump in the southwest corner of the pit as shown on the Mechanical Drawings. Assume the slab is 8” thick and reinforced.

k. For Elevator No. 4, the sump requirements are clarified as follows:

i. Clean out the existing sump as described on the drawings and reuse for the new sump. Exclude a new fiberglass pit at this location. The pit location is shown correctly on the Architectural Drawings, but is incorrect on the Mechanical Drawings.

l. For Elevator No. 4, the interior shell is clarified as follows:

i. In lieu of the plastic laminate panels shown on Elevations 2, 3 and 4 shown on Drawing A-201, provide epoxy-painted sheet steel walls as described in Specification Section 14 22 13 Paragraph 2.06.G.2.

ii. In lieu of the handrail shown on Elevations 2, 3 and 4 shown on Drawing A-201, provide wood protective rails as described in Specification Section 14 22 13 Paragraph 2.06.G.4.

C. An additional photo below has been incorporated.

National Register of Historic Places.

original construction date between the years of 1900-1940 and listed in or eligible for the a historic building is a fully occupied commercial/Government office building with an Performance, clarify the definition of “historic building”. For purposes of this evaluation, . Section II.D. Technical Proposal, Factor 1 Past Experience and Factor 3 PastF

Score (25 points possible)” to state “Total Score (30 points possible).”

. On the Past Performance & Past Experience Reference Attachment B, revise “TotalE

. Asbestos notification letter is hereby incorporated.D

G. This amendment addresses the following RFI questions and answers that were received before and after the deadline for submission:

a. Drawing Reference: ELEVATOR 3: 2/AD301, 1/A101, 2/A301, 1/Q101, M201, M701

ELEVATOR 4: 1/AD101, 1/A101, 2/A301, 1/Q101, M201, M701

Specification Reference: 22 14 29 Sump Pumps, Paragraph 2.3 Sump Pump Pits

Is the installation of a fiberglass sump pit required in Elevators 3 and 4 pit? or is there one existing?

Elevator 3 2/AD301 indicates an existing sump pit, and no demolition work for a new pit is referenced in 1/AD101. No pit is referenced in either 1/A101, 2/A301 or 1/Q101.

The only reference to a pit is in M201, and the Sump Pump Schedule on M701 with no waterproofing details provided.

Elevator 4 Note 2 on A101 indicates cleaning out the existing sump pit and installing a sump pump only. The Sump Pump Schedule on M701 indicates a fiberglass pit to be installed, which is in conflict with Note 2. No demolition of existing is indicated.

Response: At Elevator No. 3, revise Specification Section 03 30 00 Paragraph 1.1.A to read: “Scope: Cut existing concrete slab in hoistway to accommodate new fiberglass sump. At the new sump, cast in place concrete may be used in lieu of patching material at the choice of the Contractor.”

At Elevator No. 3, include a cutting the existing slab of the hoistway pit and install a new fiberglass sump in the southwest corner of the pit as shown on the Mechanical Drawings. Assume the slab is 8” thick and reinforced.

At Elevator No. 4, clean out the existing sump as described on the drawings and reuse for the new sump. Exclude a new fiberglass pit at this location. The pit location is shown correctly on the Architectural Drawings, but is incorrect on the Mechanical Drawings.

b. Please provide a labor rate for “elevator mechanic” as it was not listed on Davis Bacon Wage Determination doc.

Response: Currently, there are no elevator mechanic/constructor labor rates on the incorporated wage determination for Ingham County, MI. The awarded contractor shall go through the Department of Labor, Davis Bacon Additional Classifications Process IAW FAR 22.406-3 Additional Classifications. After award, the contractor will be provided an SF1444 in order to provide the missing classification/rates. The contracting officer will review the request for additional classification and rates in accordance with conformance criteria and ensure that all required information is furnished. At this time, the contracting officer will provide their agreement or disagreement with the proposed classification/rates and submit the request to the Department of Labor Wage and Hour Division for final approval.

Please note: If DOL approves a rate higher than the rate proposed by the contractor, the contractor must pay such rate retroactive to the start of performance of that classification on the contract. There is no contract provision to reimburse the contractor for the difference that must be paid to the worker from the start of performance by that classification.

For assistance with completing form SF 1444, with questions concerning the conformance process, or to check the status of a conformance request submitted, please contact the WHD Branch of Construction Wage Determinations (BCWD) wage analyst with responsibility for the state where your project is located. A list of analysts and their states can be found at the following website:

http://www.dol.gov/whd/govcontracts/stateassignments.htm.

c. Who is to provide the card reader system? If this is to be part of this award, please provide the preferred provider information.

Response: The installing contractor will be responsible for all aspects of the card reader system. We have no preferred provider.

d. What are the requirements for pipe size and connection type for the specified new oil lines?

Are Victaulic fittings and schedule 40 allowed?

Response: Refer to Specification Section 14 24 21 Paragraph 2.01.F for permitted pipe materials and working pressure of 400 PSI. Determining size, pipe wall thickness and fittings are part of the Contractor’s engineering required to maintain the working pressure.

e. Freight Car #4 – There is a discrepancy between the spec. and what is shown on the drawings. The drawings call for plastic laminate wall panels which is highly unusual for a freight elevator. The specification does not identify plastic laminate panels, rather painted steel walls. The drawings also only show one 12” hand rail and not the 12” bumper rail identified in the specification. Would it be possible to get clarification on the interior of the freight elevator cab.?

Response: In lieu of the plastic laminate panels shown on Elevations 2, 3 and 4 shown on Drawing A-201, provide epoxy-painted sheet steel walls as described in Specification Section 14 22 13 Paragraph 2.06.G.2. In lieu of the handrail shown on Elevations 2, 3 and 4 shown on Drawing A-201, provide wood protective rails as described in Specification Section 14 22 13 Paragraph 2.06.G.4.

*All other questions and answers will be posted directly to beta.sam.gov as clarifications and do not change the terms and conditions of the request for proposal.

All other terms and conditions not addressed herein remain unchanged and in full force and effect. This amendment is required to be acknowledged and returned with a proposal submission.

April 23, 2020

GSA Chamberlain Federal Courthouse

All building owners are required to provide notification to building occupants and contractors working in the building of projects that will disturb asbestos-containing materials (ACM) and presumed asbestos containing materials (PACM) in their facilities.

GSA will be performing Elevator Modernization, on all floors (elevator shafts). All relevant OSHA and

EPA regulations governing ACM and PACM maintenance, removal, and disposal are strictly adhered to, and only licensed and certified asbestos removal contractors are employed for this work.

Additionally while performing the renovations, ACM will be removed under the supervision and closely monitored by a 3rd party environmental consultant.

The proposed schedule begins 245 calendar days after notice to proceed. On-going communication from Property Management will be event based or if there are any issues that come up.

Please be assured the condition of all ACM and PACM within the building is monitored. To ensure transparency, asbestos inspection reports for this building are available for your review.

If you have any questions, please contact our Property Management staff at 614-623-8145.

Sincerely, Jordan Dykstra Property Manager West Michigan Field Office Michigan Property Management Operations Branch GSA/PBS Northern Service Center Operations Division 110 Michigan Street NW, Suite 293, Grand Rapids MI 49503 614-623-8145 (cell) jordan.dykstra@gsa.gov

RFP+Passenger+and+Freight+Elevator+Modernization (2).pdf
Attach 1 Lansing Elev 4 Combined Spec - REV.pdf
LANS ELEV 4 000000 - COVER GSA
LANS ELEV 4 000001 - INDEX GSA
LANS ELEV 4 002213 - SUPPLEMENTARY INSTRUCTIONS TO BIDDERS FY15
LANS ELEV 4 007300 - SUPPLEMENTARY CONDITIONS
LANS ELEV 4 011000 - SUMMARY
LANS ELEV 4 012900 - PAYMENT PROCEDURES
LANS ELEV 4 013100 - PROJECT COORDINATION
LANS ELEV 4 013200 - CONSTRUCTION PROGRESS DOCUMENTATION
LANS ELEV 4 013300 - SUBMITTALS
LANS ELEV 4 013510 - HISTORIC BLDG TREATMENT PROCEDURES
LANS ELEV 4 013525 - FIRE PREVENTION & PROTECTION IN CONSTRUCTION
LANS ELEV 4 013526 - SAFETY AND HEALTH
LANS ELEV 4 013553 - SECURITY REGULATIONS
LANS ELEV 4 014000 - QUALITY ASSURANCE & CONTROL
LANS ELEV 4 014200 - REFERENCES
LANS ELEV 4 015000 - TEMPORARY FACILITIES
LANS ELEV 4 016000 - PRODUCT REQUIREMENTS
LANS ELEV 4 017000 - EXECUTION REQUIREMENTS
LANS ELEV 4 017310 - CUTTING AND PATCHING
LANS ELEV 4 017320 - SELECTIVE DEMOLITION
LANS ELEV 4 017350 - FIRE PREVENTION FOR HOT WORK
LANS ELEV 4 017419 - CONSTR WASTE MGMT FY15
LANS ELEV 4 017700 - CLOSEOUT PROCEDURES
LANS ELEV 4 017822 - O+M DOC
LANS ELEV 4 024000 - DEMOLITION
LANS ELEV 4 028200 - ASBESTOS ABATEMENT
LANS ELEV 4 028300 - LEAD MITIGATION
LANS ELEV 4 030130 - CAST-IN-PLACE CONCRETE PATCHING
LANS ELEV 4 033000 - CAST-IN-PLACE CONCRETE
LANS ELEV 4 042000 - UNIT MASONRY
LANS ELEV 4 055000 - MISC.METALS
LANS ELEV 4 061053 - MISCELLANEOUS ROUGH CARPENTRY
LANS ELEV 4 076200 - SHEET METAL FLASHING AND TRIM_SP
LANS ELEV 4 078413 - FIRESTOPPING
LANS ELEV 4 079200 - JOINT SEALANTS
LANS ELEV 4 081113 - HOLLOW METAL DOORS AND FRAMES
LANS ELEV 4 087100 - HARDWARE
LANS ELEV 4 092216 - NON-STRUCTURAL METAL FRAMING
LANS ELEV 4 092613 - GYPSUM VENEER PLASTER
LANS ELEV 4 092900 - GYPSUM BOARD
LANS ELEV 4 099100 - PAINTING
LANS ELEV 4 101400 - SIGNAGE
LANS ELEV 4 142213 - FREIGHT ELEVATOR RENOVATION - 8.5.2019
SECTION 14 22 13 – MODERNIZATION OF EXISTING TRACTION FREIGHT ELEVATOR
PART 1 - GENERAL
LANS ELEV 4 200500 - mechanical general requirements
LANS ELEV 4 200510 - basic mechanical materials and methods
LANS ELEV 4 200529 - hangers and support
LANS ELEV 4 200547 - mechanical vibration controls
LANS ELEV 4 200700 - mechanical insulation
LANS ELEV 4 220523 - general duty valves for plumbing
LANS ELEV 4 221413 - storm drainage piping
LANS ELEV 4 221429 - sump pumps
LANS ELEV 4 230593 - testing, adjusting, and balancing
LANS ELEV 4 230933 - temperature controls
LANS ELEV 4 238126 - split-system air conditioning units
LANS ELEV 4 260010 - electrical general requirements
LANS ELEV 4 260519 - conductors and cables
LANS ELEV 4 260526 - grounding and bonding
LANS ELEV 4 260529 - hangers and supports for electrical systems
LANS ELEV 4 260533 - raceways and boxes
LANS ELEV 4 260553 - electrical identification
LANS ELEV 4 262726 - wiring devices
LANS ELEV 4 262813 - fuses
LANS ELEV 4 262816 - enclosed switches and circuit breakers
LANS ELEV 4 265119 - led interior lighting)
LANS ELEV 4 265700 - luminaire product data sheets
L1 - FEM_LED_pdf
L2 - WL4-LED_pdf
LANS ELEV 4 283101 - FIRE ALARM SYSTEM MODIFICATION
Chamberlain Elevators 3 and 4 PAA Letter Report
LANS ELEV 4 142213 - FREIGHT ELEVATOR RENOVATION - 12.04.2019.pdf
SECTION 14 22 13 – MODERNIZATION OF EXISTING TRACTION FREIGHT ELEVATOR
PART 1 - GENERAL
Attach 2 Lansing Elev #3 Combined Spec - Base Contract.pdf
LANS ELEV 3 002213 - SUPPLEMENTARY INSTRUCTIONS
LANS ELEV 3 007300 - SUPPLEMENTARY CONDITIONS
LANS ELEV 3 011000 - SUMMARY
LANS ELEV 3 012400 - OPTIONS
LANS ELEV 3 012900 - PAYMENT PROCEDURES
LANS ELEV 3 013100 - PROJECT COORDINATION
LANS ELEV 3 013200 - CONSTRUCTION PROGRESS DOCUMENTATION
LANS ELEV 3 013300 - SUBMITTALS
LANS ELEV 3 013510 - HISTORIC BLDG TREATMENT PROCEDURES
LANS ELEV 3 013525 - FIRE PREVENTION & PROTECTION IN CONSTRUCTION
LANS ELEV 3 013526 - SAFETY AND HEALTH
LANS ELEV 3 013553 - SECURITY REGULATIONS
LANS ELEV 3 014000 - QUALITY ASSURANCE & CONTROL
LANS ELEV 3 014200 - REFERENCES
LANS ELEV 3 015000 - TEMPORARY FACILITIES
LANS ELEV 3 016000 - PRODUCT REQUIREMENTS
LANS ELEV 3 017000 - EXECUTION REQUIREMENTS
LANS ELEV 3 017310 - CUTTING AND PATCHING
LANS ELEV 3 017320 - SELECTIVE DEMOLITION
LANS ELEV 3 017350 - FIRE PREVENTION FOR HOT WORK
LANS ELEV 3 017419 - CONSTR WASTE MGMT FY15
LANS ELEV 3 017700 - CLOSEOUT PROCEDURES
LANS ELEV 3 017822 - O+M DOC
LANS ELEV 3 024000 - DEMOLITION
LANS ELEV 3 028200 - ASBESTOS ABATEMENT
LANS ELEV 3 028300 - LEAD MITIGATION
LANS ELEV 3 030130 - CAST-IN-PLACE CONCRETE PATCHING
LANS ELEV 3 033000 - CAST-IN-PLACE CONCRETE
LANS ELEV 3 042000 - UNIT MASONRY
LANS ELEV 3 055000 - MISC.METALS
LANS ELEV 3 061053 - MISCELLANEOUS ROUGH CARPENTRY
LANS ELEV 3 076200 - SHEET METAL FLASHING AND TRIM_SP
LANS ELEV 3 078413 - FIRESTOPPING
LANS ELEV 3 079200 - JOINT SEALANTS
LANS ELEV 3 081113 - HOLLOW METAL DOORS AND FRAMES
LANS ELEV 3 087100 - HARDWARE
LANS ELEV 3 092216 - NON-STRUCTURAL METAL FRAMING
LANS ELEV 3 092613 - GYPSUM VENEER PLASTER
LANS ELEV 3 092900 - GYPSUM BOARD
LANS ELEV 3 099100 - PAINTING
LANS ELEV 3 101400 - SIGNAGE
LANS ELEV 3 142421 - HYDRAULIC ELEVATOR RENOVATION - 8.5.2019
PART 1 - GENERAL
PART 2 - PRODUCTS
PART 3 - EXECUTION
LANS ELEV 3 200500 - mechanical general requirements
LANS ELEV 3 200510 - basic mechanical materials and methods
LANS ELEV 3 200529 - hangers and supports
LANS ELEV 3 200547 - mechanical vibration controls
LANS ELEV 3 200700 - mechanical insulation
LANS ELEV 3 220523 - general duty valves for plumbing
LANS ELEV 3 221413 - storm drainage piping
LANS ELEV 3 221429 - sump pumps
LANS ELEV 3 230593 - testing, adjusting, and balancing
LANS ELEV 3 230933 - temperature controls
LANS ELEV 3 238126 - split-system air conditioning units
LANS ELEV 3 260010 - electrical general requirements add mf95 text
LANS ELEV 3 260519 - conductors and cables
LANS ELEV 3 260526 - grounding and bonding
LANS ELEV 3 260529 - hangers and supports for electrical systems
LANS ELEV 3 260533 - raceways and boxes
LANS ELEV 3 260553 - electrical identification
LANS ELEV 3 262726 - wiring devices
LANS ELEV 3 262813 - fuses
LANS ELEV 3 262816 - enclosed switches and circuit breakers
LANS ELEV 3 265119 - led interior lighting
LANS ELEV 3 265700 - luminaire product data sheets
L1 - FEM_LED_pdf
L2 - WL4-LED_pdf
LANS ELEV 3 283101 - FIRE ALARM SYSTEM MODIFICATION
LANS ELEV 3 323113 - CHAIN-LINK FENCES AND GATES
Chamberlain Elevators 3 and 4 PAA Letter Report

Untitled

Untitled

form1[0]:
#subform[1]:
exceedollas[0]:
LIABILITY7[0]:
LIABILITY6[0]:
LIABILITY5[0]:
LIABILITY4[0]:
LIABILITY3[0]:
LIABILITY2[0]:
NAMETITLEG[0]:
NAMETITLE1\:
G[0]:
F[0]:
E[0]:
D[0]:
C[0]:
B[0]:
STATEINCG[0]:
NAMETITLE2\:
G[0]:
F[0]:
B[1]:
D[0]:
C[0]:
B[0]:
NAMETITLEF[0]:
STATEINCF[0]:
NAMETITLEE[0]:
STATEINCE[0]:
NAMETITLED[0]:
STATEINCD[0]:
NAMETITLEC[0]:
STATEINCC[0]:
STATEINCB[0]:
NAMETITLEB[0]:
#subform[0]:
MILLIONS[1]:
CENTS[0]:
MILLIONS[0]:
LIABILITY1[0]:
NAMETITLE2\:
3[0]:
NAMETITLE1\:
3[0]:
STATEINC[0]:
NAMETITLE3[0]:
INDNAME2[0]:
INDNAME1[0]:
name_title3[0]:
name_title2[0]:
name_title1[0]:
FORCONSTRUCTION[0]:
INVITATIONNO[0]:
BIDDATE[0]:
HUNDERDS[0]:
THOUSANDS[0]:
PERCENTBID[0]:
surety[0]:
STATE[0]:
princple[0]:
DATEBONDEX[0]:
RadioButtonList[0]:
Off
RadioButtonList[0]: Off
topmostSubform[0]:
Page6[0]:
DateofSignature[0]:
No1[0]: Off
Yes2[0]: Off
No2[0]: Off
Yes1[0]: Off
AmountBondingCoverage[0]:
FaxNumber[1]:
FaxAreaCode[1]:
Number[1]:
AreaCode[1]:
ZipCode[1]:
State[1]:
Remarks[0]:
TitleOfOfficial[0]:
NameOfOfficial[0]:
NameOfBusiness[0]:
City[1]:
StreetAddress[1]:
ContactsName[1]:
CompanyName[1]:
ContactsName[0]:
AreaCode[0]:
Number[0]:
Extension[1]:
FaxAreaCode[0]:
FaxNumber[0]:
StreetAddress[0]:
State[0]:
ZipCode[0]:
CompanyName[0]:
Extension[0]:
City[0]:
Page5[0]:
DateCompleted[3]:
PercentCompleted[3]:
PercentCompleted[2]:
ContractAmount[9]:
ContractAmount[8]:
TypeOfWork[9]:
TypeOfWork[8]:
ZipCode[9]:
State[9]:
City[9]:
ZipCode[8]:
State[8]:
City[8]:
StreetAddress[9]:
StreetAddress[8]:
OwnersName[3]:
OwnersName[2]:
Location[9]:
OwnersName[1]:
StreetAddress[7]:
ZipCode[7]:
State[7]:
City[7]:
TypeOfWork[7]:
ContractAmount[7]:
PercentCompleted[1]:
DateCompleted[2]:
AmountSublet[5]:
ContractAmount[6]:
TypeOfWork[6]:
ZipCode[6]:
State[6]:
Extension[5]:
Number[5]:
AreaCode[5]:
City[6]:
StreetAddress[6]:
ContactsName[5]:
Location[8]:
ContactsName[4]:
StreetAddress[5]:
City[5]:
State[5]:
ZipCode[5]:
AreaCode[4]:
Number[4]:
Extension[4]:
TypeOfWork[5]:
ContractAmount[5]:
AmountSublet[4]:
Location[7]:
AmountSublet[3]:
ContractAmount[4]:
TypeOfWork[4]:
ZipCode[4]:
State[4]:
Extension[3]:
Number[3]:
AreaCode[3]:
City[4]:
StreetAddress[4]:
ContactsName[3]:
Location[6]:
ContactsName[2]:
StreetAddress[3]:
City[3]:
State[3]:
ZipCode[3]:
AreaCode[2]:
Number[2]:
Extension[2]:
TypeOfWork[3]:
ContractAmount[3]:
AmountSublet[2]:
Location[5]:
AmountSublet[1]:
ContractAmount[2]:
TypeOfWork[2]:
ZipCode[2]:
State[2]:
Extension[1]:
Number[1]:
AreaCode[1]:
City[2]:
StreetAddress[2]:
ContactsName[1]:
Location[4]:
ContactsName[0]:
StreetAddress[1]:
City[1]:
State[1]:
ZipCode[1]:
AreaCode[0]:
Number[0]:
Extension[0]:
TypeOfWork[1]:
ContractAmount[1]:
AmountSublet[0]:
Location[3]:
DateCompleted[1]:
PercentCompleted[0]:
ContractAmount[0]:
TypeOfWork[0]:
ZipCode[0]:
State[0]:
City[0]:
StreetAddress[0]:
OwnersName[0]:
Location[2]:
Location[1]:
Location[0]:
DateCompleted[0]:
Page4[0]:
DateCompleted[3]:
HighCredit[3]:
AmountNowOwing[3]:
PastDueAccounts[0]:
Extension[3]:
FaxNumber[3]:
Number[3]:
ZipCode[7]:
State[7]:
City[7]:
StreetAddress[7]:
FaxAreaCode[3]:
FaxAreaCode[2]:
AreaCode[3]:
ContactPerson[3]:
NameOfSupplier[3]:
ContactPerson[2]:
AreaCode[2]:
Number[2]:
Extension[2]:
FaxAreaCode[1]:
FaxNumber[2]:
StreetAddress[6]:
City[6]:
State[6]:
ZipCode[6]:
AmountNowOwing[2]:
HighCredit[2]:
NameOfSupplier[2]:
ZipCode[5]:
State[5]:
PercentCompleted[3]:
TypeOfWork[3]:
City[5]:
StreetAddress[5]:
OwnersName[3]:
Location[3]:
OwnersName[2]:
StreetAddress[4]:
City[4]:
State[4]:
ZipCode[4]:
TypeOfWork[2]:
ContractAmount[3]:
PercentCompleted[2]:
DateCompleted[2]:
Location[2]:
OwnersName[1]:
StreetAddress[3]:
City[3]:
State[3]:
ZipCode[3]:
TypeOfWork[1]:
ContractAmount[2]:
PercentCompleted[1]:
DateCompleted[1]:
DateCompleted[0]:
PercentCompleted[0]:
ContractAmount[1]:
TypeOfWork[0]:
City[2]:
State[2]:
ZipCode[2]:
StreetAddress[2]:
OwnersName[0]:
Location[1]:
Location[0]:
ContactPerson[1]:
AreaCode[1]:
Number[1]:
Extension[1]:
FaxNumber[1]:
StreetAddress[1]:
City[1]:
State[1]:
ZipCode[1]:
AmountNowOwing[1]:
ContractAmount[0]:
HighCredit[1]:
HighCredit[0]:
AmountNowOwing[0]:
City[0]:
State[0]:
ZipCode[0]:
StreetAddress[0]:
FaxAreaCode[0]:
FaxNumber[0]:
Number[0]:
AreaCode[0]:
Extension[0]:
ContactPerson[0]:
NameOfSupplier[1]:
NameOfSupplier[0]:
Page3[0]:
YES3[0]: Off
NO3[0]: Off
YES1[0]: Off
NO2[0]: Off
YES2[0]: Off
NO1[0]: Off
MaturityDate[3]:
No36_1[0]: Off
Yes36_1[0]: Off
No35_1[0]: Off
Yes35_2[0]: Off
No35_2[0]: Off
Yes36_2[0]: Off
No36_2[0]: Off
Yes35_1[0]: Off
MonthlyPayment[3]:
AmountOutstanding[1]:
AmountOutstanding[0]:
AmountAuthorized[1]:
AmountAuthorized[0]:
AmountOwing[1]:
AmountOwing[0]:
AreaCode[3]:
Number[3]:
Number[2]:
StreetAddress[5]:
StreetAddress[4]:
City[5]:
State[5]:
ZipCode[5]:
ZipCode[4]:
State[4]:
SecuringAssets[3]:
MaturityDate[2]:
TotalLiability[0]:
MonthlyPayment[2]:
MaturityDate[1]:
SecuringAssets[2]:
ZipCode[3]:
State[3]:
City[4]:
StreetAddress[3]:
ContactName[3]:
SecuredPartyName[3]:
MonthlyPayment[1]:
ZipCode[2]:
State[2]:
City[3]:
StreetAddress[2]:
ContactName[2]:
SecuredPartyName[2]:
SecuringAssets[1]:
MaturityDate[0]:
MonthlyPayment[0]:
ZipCode[1]:
State[1]:
City[2]:
StreetAddress[1]:
ContactName[1]:
SecuredPartyName[1]:
SecuringAssets[0]:
ZipCode[0]:
State[0]:
City[1]:
StreetAddress[0]:
ContactName[0]:
SecuredPartyName[0]:
City[0]:
AreaCode[2]:
Number[1]:
AreaCode[1]:
Extension[1]:
Extension[0]:
Number[0]:
AreaCode[0]:
ContactPerson[1]:
ContactPerson[0]:
NameOfBank[1]:
NameOfBank[0]:
Page2[0]:
NetSales[0]:
TotalProperty[0]:
TotalAssets[0]:
OtherExpenses2[0]:
OtherExpenses1[0]:
InterestExpense[0]:
Selling[0]:
Depreciation[0]:
TotalCost[0]:
NetIncome[0]:
NetOfTaxes[0]:
IncomeBefore[0]:
TaxesOnIncome[0]:
EarningsBeforeTaxes[0]:
Minority[0]:
GoodsSold[0]:
TotalOtherAssets[0]:
Other3[0]:
Other2[0]:
Other1[0]:
DueFromOfficer[0]:
Goodwill[0]:
Investments[0]:
LessAccumulated[0]:
LeaseholdImprovements[0]:
BuildingsAndEquipment[0]:
Land[0]:
TotalCurrentAssets[0]:
OtherAssets2[0]:
OtherAssets1[0]:
Inventories[0]:
AccountsReceivable[0]:
ShortTerm[0]:
AccountsPayable[0]:
CurrentPortion[0]:
NotesPayable[0]:
AccruedExpenses[0]:
AccruedTaxes[0]:
OtherLiabilities1[0]:
OtherLiabilities2[0]:
TotalLiabilities_NetWorth[0]:
TotalNetWorth[0]:
TreasuryStock[0]:
RetainedEarnings[0]:
PaidInCapital[0]:
CommonStock[0]:
PreferredStock[0]:
Interest[0]:
TotalLiabilities[0]:
TotalOtherLiabilities[0]:
OtherDebt[0]:
IncomeTaxes[0]:
Bonds[0]:
Mortgages[0]:
TotalCurrentLiabilities[0]:
OtherLiabilities[1]:
OtherLiabilities[0]:
Cash[0]:
To[0]:
From[0]:
BalanceSheetDate[0]:
FiscalYearEnds[0]:
Attached[0]: Off
ForeignCurrencySpecify[0]:
ZipCode19E[0]:
State19D[0]:
OtherExpenses[1]:
OtherExpenses[0]:
OtherAssets[4]:
OtherAssets[3]:
OtherAssets[2]:
OtherAssets[1]:
OtherAssets[0]:
City19C[0]:
StreetAddress19B[0]:
Name19A[0]:
CheckBox5[0]: Off
CheckBox4[0]: Off
CheckBox3[0]: Off
CheckBox2[0]: Off
CheckBox1[0]: Off
Yes1[0]: Off
No1[0]: Off
Page1[0]:
Balance[0]:
AmountOfDelinquency[0]:
Maturity[0]:
Payment[0]:
AuthorizedE[0]:
AuthorizedD[0]:
AuthorizedC[0]:
AuthorizedB[0]:
InUseA[0]:
InUseB[0]:
InUseC[0]:
InUseD[0]:
GovAgencyInvolved[4]:
GovAgencyInvolved[3]:
GovAgencyInvolved[2]:
GovAgencyInvolved[1]:
GovAgencyInvolved[0]:
InUseE[0]:
AuthorizedA[0]:
ClaimAmount[0]:
DateOrganizationEst\:
[0]:
I[0]: Off
H[0]: Off
G[0]: Off
F[0]: Off
No3[0]: Off
Yes3[0]: Off
No2[0]: Off
Yes2[0]: Off
No1[0]: Off
Yes1[0]: Off
NoD[0]: Off
YesD[0]: Off
NoC[0]: Off
YesC[0]: Off
NoB[0]: Off
YesB[0]: Off
NoA[0]: Off
YesA[0]: Off
OTHER[0]: Off
AVERAGECOST[0]: Off
FIFO[0]: Off
LIFO[0]: Off
E[0]: Off
D[0]: Off
C[0]: Off
B[0]: Off
A[0]: Off
CheckBoxE[0]: Off
CheckBoxD[0]: Off
CheckBoxC[0]: Off
CheckBoxB[0]: Off
CheckBoxA[0]: Off
ZipCode[0]:
State[0]:
E_OtherSpecify[1]:
KindOfProduct[0]:
D_OtherSpecify[0]:
I_OtherSpecify[0]:
StateOfIncorporation[0]:
StateOfParentCompany[0]:
E_OtherSpecify[0]:
AgencyInvolved[0]:
Agency[0]:
CityOfParentCompany[0]:
NameOfParentCompany[0]:
Name5[0]:
Name4[0]:
Name3[0]:
Name2[0]:
Title[4]:
Title[3]:
Title[2]:
Title[1]:
G_OR_L[4]:
G_OR_L[3]:
G_OR_L[2]:
G_OR_L[1]:
PercentBusinessOwned[4]:
PercentBusinessOwned[3]:
PercentBusinessOwned[2]:
PercentBusinessOwned[1]:
PercentBusinessOwned[0]:
G_OR_L[0]:
Title[0]:
Name1[0]:
FormerBusinessName[0]:
TradeStyleName[0]:
TaxIDNumber[0]:
City[0]:
StreetAddress[0]:
FullName[0]:

File details come from the government source that posted it. Updated .