Copy of Multi-Year_Multi-Clin_Proposal_Template 2019.xls

XLS spreadsheet 214 KB Posted

Attached to
Helicopter Assembly Parts
Solicitation number
SPE7LX-21-R-0123
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cover Page

Double click on WORD icon to open the Cover Page template.
For additional assistance, go to the DCAA website - WWW.DCAA.MIL
Highlight Select 'Guidance' tab to show drop-down menu
Select from drop-down menu 'Audit Process Overview - Information for Contractors'
THE INFORMATION CONTAINED IN THIS DOCUMENTATION IS NOT OFFICIAL GOVERNMENT DOCUMENTATION
THIS INFORMATION IS FOR EDUCATION ONLY

Summary Whole Contract

* Company Name *
Request for Proposal SPMXXX-19-R-0000
Summary - Total Proposed Costs for all NSNs
*HINT: This identifying information can be embeded within the spreadsheet or in the Header Section of the spreadsheet
Base Period - FY 2019Option Year 1Option Year 2Option Year 3Option Year 4All Years
Element of CostRateUnit PriceRateUnit PriceRateUnit PriceRateUnit PriceRateUnit PriceTotalReference
Material$ 618,150.00$ 649,057.50$ 681,510.38$ 715,585.89$ 751,365.19$ 3,415,668.96Schedule A
Material Overhead15.07%93,155.2115.13%98,202.4015.18%103,453.2715.22%108,912.1715.27%114,733.46$ 518,456.52Schedule B
Direct Labor72,080.00$ 73,521.60$ 74,992.03$ 76,491.87$ 78,021.71$ 375,107.21Schedule C
Labor Overhead32.69%23,562.9532.58%23,953.3433.09%24,814.8633.07%25,295.8632.97%25,723.76$ 123,350.77Schedule D
Subtotal806,948.16844,734.84884,770.55926,285.80969,844.12$ 4,432,583.46
G&A61.25%494,255.7560.38%510,089.8856.96%504,003.2254.37%503,590.7151.06%495,226.65$ 2,507,166.22Schedule E
Total Cost1,301,203.901,354,824.721,388,773.771,429,876.521,465,070.77$ 6,939,749.68
Profit10.00%130,120.3910.00%135,482.4710.00%138,877.3810.00%142,987.6510.00%146,507.08$ 693,974.97
Total Price$ 1,431,324.29$ 1,490,307.19$ 1,527,651.15$ 1,572,864.17$ 1,611,577.85$ 7,633,724.65
HINT 2: DELETE Surge section below if surge is not required or in the solicitation
Surge
Base Period - FY 2016Option Year 1Option Year 2Option Year 3Option Year 4All Years
Element of CostRateUnit PriceRateUnit PriceRateUnit PriceRateUnit PriceRateUnit PriceTotalReference
Material$ - 0
Material Overhead15.07%$ - 015.13%$ - 015.18%$ - 015.22%$ - 015.27%$ - 0$ - 0
Direct Labor$ - 0
Mfg Overhead32.69%$ - 032.58%$ - 033.09%$ - 033.07%$ - 032.97%$ - 0$ - 0
Subtotal$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
G&A61.25%$ - 060.38%$ - 056.96%$ - 054.37%$ - 051.06%$ - 0$ - 0
Total Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Profit10.00%$ - 010.00%$ - 010.00%$ - 010.00%$ - 010.00%$ - 0$ - 0
Total Price$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Explanatory Note:
This data summarizes costs for all solicitation NSNs
**HINT 3: The following identifying information can be embeded within the spreadsheet or in the Footer Section of the spreadsheet
**Proprietary Information
**Use or disclosure of data contained in this workbook is subject to the restricitions on the title page of the proposal
THE INFORMATION CONTAINED IN THIS DOCUMENTATION IS NOT OFFICIAL GOVERNMENT DOCUMENTATION
THIS INFORMATION IS FOR EDUCATION ONLY

&L&"Arial,Bold"THE INFORMATION CONTAINED IN THIS DOCUMENTATION IS NOT OFFICIAL GOVERNMENT DOCUMENTATION.

THIS INFORMATION IS FOR EDUCATION ONLY

&CProprietary Information Use or disclosure of data contained in this workbook is subject to the restricitions on the title page of the proposal

&A&R&12

NSN Summary ALT 1A

* Company Name *
Request for Proposal SPMXXX-19-R-0000
Schedule of Unit Cost and Total Cost by Cost Element
*HINT 1: This identifying information can be embeded within the spreadsheet or in the Header Section of the spreadsheet
CLIN 0001 NSN 1234-56-789-xxxx - See Comments below
Element of CostUnit PriceTotal AmountReference
Material$ 1,159.50$ 463,800.00Schedule A
Material Overhead15.07%$ 174.74$ 69,894.66Schedule B
Subtotal$ 1,334.24$ 533,694.66
Direct Labor$ 63.20$ 25,280.00Schedule C
Direct Labor Overhead32.69%$ 20.66$ 8,264.03Schedule D
Subtotal$ 1,418.10$ 567,238.69
G&A61.25%$ 868.58$ 347,433.70Schedule E
Total Cost$ 2,286.68$ 914,672.39
Profit10.00%$ 228.67$ 91,467.24
Total Price$ 2,515.35$ 1,006,139.63
Annual Demand Quantity (ADQ)400
Explanatory Note:
This data summarizes costs for five years OR Base Year plus Option
**Proprietary Information
**Use or disclosure of data contained in this workbook is subject to the restricitions on the title page of the proposal
THE INFORMATION CONTAINED IN THIS DOCUMENTATION IS NOT OFFICIAL GOVERNMENT DOCUMENTATION
THIS INFORMATION IS FOR EDUCATION ONLY

&L&"Arial,Bold"THE INFORMATION CONTAINED IN THIS DOCUMENTATION IS NOT OFFICIAL GOVERNMENT DOCUMENTATION

THIS INFORMATION IS FOR EDUCATION ONLY&R

&CProprietary Information Use or disclosure of data contained in this workbook is subject to the restricitions on the title page of the proposal

&A

NSN Summary ALT 1B

Company Name *
Request for Proposal SPMXXX-19-R-0000
Schedule of Unit Cost and Total Cost by Cost Element
*HINT 1: This identifying information can be embeded within the spreadsheet or in the Header Section of the spreadsheet
CLIN 0002 NSN 0000-56-789-xxxx - See Comments Below
Element of CostUnit PriceTotal AmountReference
Material$ 343.00$ 154,350.00Schedule A
Material Overhead15.07%$ 51.69$ 23,260.55Schedule B
Subtotal$ 394.69$ 177,610.55
Direct Labor$ 104.00$ 46,800.00Schedule C
Direct Labor Overhead32.69%$ 34.00$ 15,298.92Schedule D
Subtotal$ 532.69239,709
G&A61.25%$ 326.27$ 146,822.05Schedule E
Total Cost$ 858.96386,531.51
Profit10.00%$ 85.90$ 38,653.15
Total Price$ 944.85$ 425,184.66
Annual Demand Quantity (ADQ)450
Explanatory Note:
This data summarizes costs for all NSNs
**Proprietary Information
**Use or disclosure of data contained in this workbook is subject to the restricitions on the title page of the proposal
THE INFORMATION CONTAINED IN THIS DOCUMENTATION IS NOT OFFICIAL GOVERNMENT DOCUMENTATION
THIS INFORMATION IS FOR EDUCATION ONLY

&L&"Arial,Bold"THE INFORMATION CONTAINED IN THIS DOCUMENTATION IS NOT OFFICIAL GOVERNMENT DOCUMENTATION

THIS INFORMATION IS FOR EDUCATION ONLY&C

&R &CProprietary Information Use or disclosure of data contained in this workbook is subject to the restricitions on the title page of the proposal

&A

NSN Summary ALT C

*Company Name *
Request for Proposal SPMXXX-19-R-0000
Schedule of Unit Cost and Total Cost by Cost Element
*HINT 1: This identifying information can be embeded within the spreadsheet or in the Header Section of the spreadsheet
ClinNSNPart NumberMaterialMaterial OverheadSubtotalLaborLabor OverheadSubtotalG&ATotal CostProfitTotal PriceADQSummary Total
Rate15.07%32.69%61%10%
00011234-56-789-xxxxXYZ-01$ 1,159.50$ 174.74$ 1,334.24$ 63.20$ 20.66$ 1,418.10$ 868.58$ 2,286.68$ 228.67$ 2,515.35400$ 1,006,139.63
00020000-56-789-xxxxXYZ-02$ 343.00$ 51.69$ 394.69$ 104.00$ 34.00$ 532.69$ 326.27$ 858.96$ 85.90$ 944.85450$ 425,184.66
Total$ 1,431,324.29
Explanatory Note:
This data summarizes costs for all NSNs
Use or disclosure of data contained in this workbook is subject to the restricitions on the title page of the proposal
THE INFORMATION CONTAINED IN THIS DOCUMENTATION IS NOT OFFICIAL GOVERNMENT DOCUMENTATION
THIS INFORMATION IS FOR EDUCATION ONLY

&L&"Arial,Bold"THE INFORMATION CONTAINED IN THIS DOCUMENTATION IS NOT OFFICIAL GOVERNMENT DOCUMENTATION

THIS INFORMATION IS FOR EDUCATION ONLY&C

&CProprietary Information Use or disclosure of data contained in this workbook is subject to the restricitions on the title page of the proposal

&A

Schedule A - Material ALT 1A

Company Name *
Request for Proposal SPMXXX-19-R-0000
Schedule of Unit Cost and Total Cost by Cost Element
*HINT 1: This identifying information can be embeded within the spreadsheet or in the Header Section of the spreadsheet
Schedule A - Bill of Material
CLIN 0001 NSN 1234-56-789-xxxx
Base Year - 2019Option Yr 1Option Yr 2Option Yr 3Option Yr 4Total
QuantityExtended
Per UnitPrice /TotalTotalTotalTotalTotal
DescriptionUnitsUnit Price(Note 5)Unit PriceMaterialUnit PriceMaterialUnit PriceMaterialUnit PriceMaterialUnit PriceMaterialNotes
MMMMMMMFT$ 86.002$ 172.00$ 68,800.0$ 174.58$ 69,832.0$ 177.20$ 70,880.0$ 179.86$ 71,944.0$ 182.56$ 73,024.0$ 354,480.001
MMMMMMMFT$ 1.0050$ 50.00$ 20,000.0$ 50.75$ 20,300.0$ 51.51$ 20,604.0$ 52.28$ 20,912.0$ 53.06$ 21,224.0$ 103,040.001
MMMMMMMEA$ 100.001$ 100.00$ 40,000.0$ 101.50$ 40,600.0$ 103.02$ 41,208.0$ 104.57$ 41,828.0$ 106.14$ 42,456.0$ 206,092.001
MMMMMMMEA$ 17.5017$ 297.50$ 119,000.0$ 301.96$ 120,784.0$ 306.49$ 122,596.0$ 311.09$ 124,436.0$ 315.76$ 126,304.0$ 613,120.001
MMMMMMMEA$ 36.0015$ 540.00$ 216,000.0$ 548.10$ 219,240.0$ 556.32$ 222,528.0$ 564.66$ 225,864.0$ 573.13$ 229,252.0$ 1,112,884.001
Total Material$ 1,159.50$ 463,800.0$ 1,176.89$ 470,756.00$ 1,194.54$ 477,816.0$ 1,212.46$ 484,984.0$ 1,230.65$ 492,260.0$ 2,389,616.00
Annual Demand Quantity4004004004004002,000
Cost Escalation1.50%1.50%1.50%1.50%2
Explanatory Notes:
1. These prices are supported by multiple vendor quotes.
2. The proposed escalation is based on Global Insight XXXXXX for military vehicles
**Use or disclosure of data contained in this workbook is subject to the restricitions on the title page of the proposal
THE INFORMATION CONTAINED IN THIS DOCUMENTATION IS NOT OFFICIAL GOVERNMENT DOCUMENTATION
THIS INFORMATION IS FOR EDUCATION ONLY

&L&"Arial,Bold"THE INFORMATION CONTAINED IN THIS DOCUMENTATION IS NOT OFFICIAL GOVERNMENT DOCUMENTATION

THIS INFORMATION IF FOR EDUCATION ONLY

&CProprietary Information Use or disclosure of data contained in this workbook is subject to the restricitions on the title page of the proposal

&A

Schedule A - Material ALT 1B

Company Name *
Request for Proposal SPMXXX-19-R-0000
Schedule of Unit Cost and Total Cost by Cost Element
*HINT 1: This identifying information can be embeded within the spreadsheet or in the Header Section of the spreadsheet
Schedule A - Bill of Material
CLIN 0002 NSN 0000-56-789-xxxx
Base Year - 2019Option Yr 1Option Yr 2Option Yr 3Option Yr 4Total
QuantityExtended
Per UnitPrice /TotalTotalTotalTotalTotal
DescriptionUnitsUnit Price(Note 5)Unit PriceMaterialUnit PriceMaterialUnit PriceMaterialUnit PriceMaterialUnit PriceMaterialNotes
MMMMMMMFT$ 100.002$ 200.00$ 90,000.00$ 203.00$ 91,350.00$ 206.05$ 92,722.50$ 209.14$ 94,113.00$ 212.28$ 95,526.00$ 463,711.501
MMMMMMMFT$ 15.002$ 30.00$ 13,500.00$ 30.45$ 13,702.50$ 30.91$ 13,909.50$ 31.37$ 14,116.50$ 31.84$ 14,328.00$ 69,556.501
MMMMMMMEA$ 27.001$ 27.00$ 12,150.00$ 27.41$ 12,334.50$ 27.82$ 12,519.00$ 28.24$ 12,708.00$ 28.66$ 12,897.00$ 62,608.501
MMMMMMMEA$ 18.002$ 36.00$ 16,200.00$ 36.54$ 16,443.00$ 37.09$ 16,690.50$ 37.65$ 16,942.50$ 38.21$ 17,194.50$ 83,470.501
MMMMMMMEA$ 50.001$ 50.00$ 22,500.00$ 50.75$ 22,837.50$ 51.51$ 23,179.50$ 52.28$ 23,526.00$ 53.06$ 23,877.00$ 115,920.001
Total Material$ 343.00$ 154,350.00$ 348.15$ 156,667.50$ 353.38$ 159,021.00$ 358.68$ 161,406.00$ 364.05$ 163,822.50$ 795,267.00
Annual Demand Quantity4504504504504502,250
Cost Escalation1.50%1.50%1.50%1.50%2
Explanatory Notes:
1. These prices are supported by multiple vendor quotes.
2. The proposed escalation is based on Global Insight XXXXX for military vehicles
**Use or disclosure of data contained in this workbook is subject to the restricitions on the title page of the proposal
THE INFORMATION CONTAINED IN THIS DOCUMENTATION IS NOT OFFICIAL GOVERNMENT DOCUMENTATION
THIS INFORMATION IS FOR EDUCATION ONLY

&L&"Arial,Bold"THE INFORMATION CONTAINED IN THIS DOCUMENTATION IS NOT OFFICIAL GOVERNMENT DOCUMENTATION

THIS INFORMATION IF FOR EDUCATION ONLY

&CProprietary Information Use or disclosure of data contained in this workbook is subject to the restricitions on the title page of the proposal

&A

Schedule B - Material OH

COMMENT - This schedule would be the same for all NSNs, therefore only need one
Company Name *
Request for Proposal SPMXXX-19-R-0000
Schedule of Unit Cost and Total Cost by Cost Element
*HINT 1: This identifying information can be embeded within the spreadsheet or in the Header Section of the spreadsheet
Schedule B - Material Overhead
BudgetProjectedProjectedProjectedProjectedActual Expenses
Material Overhead Expenses20192020202120222023201620172018
Total Expense Pool$500,000$575,000$661,250$760,438$874,503$400,000$436,000$450,000
Less Unallowable Costs20,00021,00022,00023,00024,00017,00018,00019,000
Net Allowable Expenses$480,000$554,000$639,250$737,438$850,503$383,000$418,000$431,000
Allocation Base
Total Materials3,184,8833,662,615.454,212,007.774,843,808.935,570,380.272,500,0002,750,0003,000,000
Materials Overhead Rate15.07%15.13%15.18%15.22%15.27%15.32%15.20%14.37%
Explanatory Notes
1. The budgeted Material Overhead expenses and allocation base dollars are based on the company's
operating budget for 2018 and is available immediately upon request.
2. The actual expense shown for fiscal years 2016 through 2018. We anticipate minimal inflation and a stable
business base.
3. Supporting details are available upon request.
**Use or disclosure of data contained in this workbook is subject to the restricitions on the title page of the proposal
THE INFORMATION CONTAINED IN THIS DOCUMENTATION IS NOT OFFICIAL GOVERNMENT DOCUMENTATION
THIS INFORMATION IS FOR EDUCATION ONLY

&L&"Arial,Bold"THE INFORMATION CONTAINED IN THIS DOCUMENTATION IS NOT OFFICIAL GOVERNMENT DOCUMENTATION

THIS INFORMATION IS FOR EDUCATION ONLY

&CProprietary Information Use or disclosure of data contained in this workbook is subject to the restriction on the title page of the proposal

&A

Schedule C - Labor ALT 1A

* Company Name *
Request for Proposal SPMXXX-19-R-0000
Schedule of Labor Expenses
*HINT 1: This identifying information can be embeded within the spreadsheet or in the Header Section of the spreadsheet
Schedule C - Direct Labor
CLIN 0001 NSN 1234-56-789-xxxx
UnitBase Year - 2019Option 1Option 2Option 3Option 4Total
LaborLaborUnitTotalLaborUnitTotalLaborUnitTotalLaborUnitTotalLaborUnitTotal
Labor Category or Mfg ProcessHoursRateLaborLaborRateLaborLaborRateLaborLaborRateLaborLaborRateLaborLabor
(Note 1)(Note 2)
Engineering1.2$ 48.00$ 57.60$ 23,040.00$ 48.96$ 58.75$ 23,500.00$ 49.94$ 59.93$ 23,972.00$ 50.94$ 61.13$ 24,452.00$ 51.96$ 62.35$ 24,940.00$ 4,796,160.00
Assembly0.4$ 14.00$ 5.60$ 2,240.00$ 14.28$ 5.71$ 2,284.00$ 14.57$ 5.83$ 2,332.00$ 14.86$ 5.94$ 2,376.00$ 15.16$ 6.06$ 2,424.00$ 466,240.00
Total1.6$ 63.20$ 25,280.00$ 64.46$ 25,784.00$ 65.76$ 26,304.00$ 67.07$ 26,828.00$ 68.41$ 27,364.00$ 5,262,400.00
Labor Rate Escalation (Note 3)2.0%2.0%2.0%2.0%
ADQ4004004004004002,000
SURGE - DELETE THIS SECTION IF NOT NEEDED
Unit
LaborLaborTotalBase
Labor Category or Mfg ProcessHoursRateLaborYearOption 1Option 2Option 3Option 4Total
Engineering$ - 0$ - 0
Assembly$ - 0$ - 0
Total$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
ADQ0
Explanatory Notes
1. All proposed Direct Labor Hours are based on 2018 production historical actuals OR All proposed Direct Labor Hours are based on engineering estimates of previous production runs
2. The Direct Labor Rates are based on payroll data for individuals OR Direct Labor Rates are actual average rates for labor categories
3. Labor rates are escalated xx% percent each year based on BLS Global Insight
4. The supporting details available upon request
**Use or disclosure of data contained in this workbook is subject to the restricitions on the title page of the proposal
THE INFORMATION CONTAINED IN THIS DOCUMENTATION IS NOT OFFICIAL GOVERNMENT DOCUMENTATION
THIS INFORMATION IS FOR EDUCATION ONLY

&L&"Arial,Bold"THIS INFORMATION CONTAINED IN THIS DOCUMENTATION IS NOT OFFICIAL GOVERNMENT DOCUMENTATION

THIS INFORMATION IS FOR EDUCATION ONLY

&CProprietary Information Use or disclosure of data contained in this workbook is subject to the restricitions on the title page of the proposal

&A&R

Schedule C - Labor ALT 1B

* Company Name *
Request for Proposal SPMXXX-19-R-0000
Schedule of Labor Expenses
*HINT 1: This identifying information can be embeded within the spreadsheet or in the Header Section of the spreadsheet
Schedule C - Direct Labor
CLIN 0002 NSN 0000-56-789-xxxx
UnitBase Year - 2019Option 1Option 2Option 3Option 4Total
LaborLaborUnitTotalLaborUnitTotalLaborUnitTotalLaborUnitTotalLaborUnitTotal
Labor Category or Mfg ProcessHoursRateLaborLaborRateLaborLaborRateLaborLaborRateLaborLaborRateLaborLabor
(Note 1)(Note 2)
Engineering1$ 48.00$ 48.00$ 21,600.00$ 48.96$ 48.96$ 22,032.00$ 49.94$ 49.94$ 22,473.00$ 50.94$ 50.94$ 22,923.00$ 51.96$ 51.96$ 23,382.00$ 112,410.00
Assembly4$ 14.00$ 56.00$ 25,200.00$ 14.28$ 57.12$ 25,704.00$ 14.57$ 58.28$ 26,226.00$ 14.86$ 59.44$ 26,748.00$ 15.16$ 60.64$ 27,288.00$ 131,166.00
Total5$ 104.00$ 46,800.00$ 106.08$ 47,736.00$ 108.22$ 48,699.00$ 110.38$ 49,671.00$ 112.60$ 50,670.00$ 243,576.00
Labor Rate Escalation (Note 2)2.0%2.0%2.0%2.0%
ADQ4504504504504502,250
SURGE - DELETE THIS SECTION IF NOT NEEDED
Unit
LaborLaborTotalBase
Labor Category or Mfg ProcessHoursRateLaborYearOption 1Option 2Option 3Option 4Total
Engineering$ - 0$ - 0
Assembly$ - 0$ - 0
Total$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
ADQ0
Explanatory Notes
1. All proposed Direct Labor Hours are based on 2018 production historical actuals OR All proposed Direct Labor Hours are based on engineering estimates of previous production runs
2. The Direct Labor Rates are based on payroll data for individuals OR Direct Labor Rates are actual average rates for labor categories
3. Labor rates are escalated xx% percent each year based on BLS Global Insight
4. The supporting details available upon request
**Use or disclosure of data contained in this workbook is subject to the restricitions on the title page of the proposal
THE INFORMATION CONTAINED IN THIS DOCUMENTATION IS NOT OFFICIAL GOVERNMENT DOCUMENTATION
THIS INFORMATION IS FOR EDUCATION PURPOSES ONLY

&L&"Arial,Bold"THIS INFORMATION CONTAINED IN THIS DOCUMENTATION IS NOT OFFICIAL GOVERNMENT DOCUMENTATION

THIS INFORMATION IS FOR EDUCATION ONLY

&CProprietary Information Use or disclosure of data contained in this workbook is subject to the restricitions on the title page of the proposal

&A

Schedule D - Labor OH

COMMENT - This schedule would be the same for all NSNs, therefore only need one
* Company Name *
Request for Proposal SPMXXX-19-R-0000
*HINT 1: This identifying information can be embeded within the spreadsheet or in the Header Section of the spreadsheet
Schedule D - Labor Overhead or Manufacturing Overhead
BudgetProjectedProjectedProjectedProjectedActual Expenses
Manufacturing Overhead Expenses20192020202120222023201620172018
Total Expense Pool$2,000,000$2,040,000$2,080,800$2,122,416$2,164,864$1,600,000$1,700,000$1,800,000
Less Unallowable Costs200,000210,000185,000190,000200,000$200,000$190,000$180,000
Net Allowable Expenses$1,800,000$1,830,000$1,895,800$1,932,416$1,964,864$1,800,000$1,890,000$1,980,000
Allocation Base
Total Labor Dollars5,505,9765,616,095.525,728,417.435,842,985.785,959,845.49$10,000,000$10,000,000$10,000,000
Manufacturing Overhead Rate32.69%32.58%33.09%33.07%32.97%18.00%18.90%19.80%
Explanatory Notes
1. The budgeted manufacturing overhead expenses and allocation base dollars are based on the company's
operating budget for 2018 and is available upon request.
2. Projected expense pool costs and allocation base dollars for 2019 to 2023 are based on budget forecasts.
3. Supporting details are available upon request
**Use or disclosure of data contained in this workbook is subject to the restricitions on the title page of the proposal
THE INFORMATION CONTAINED IN THIS DOCUMENTATION IS NOT OFFICIAL GOVERNMENT DOCUMENTATION
THIS INFORMATION IS FOR EDUCATION ONLY

&L&"Arial,Bold"THE INFORMATION CONTAINED IN THIS DOCUMENTATION IS NOT OFFICIAL GOVERNMENT DOCUMENTATION

THIS INFORMATION IS FOR EDUCATION ONLY

&CProprietary Information Use or disclosure of data contained in this workbook is subject to the restricitions on the title page of the proposal

&A

Schedule E - G&A

COMMENT - This schedule would be the same for all NSNs, therefore only need one
* Company Name *
Request for Proposal SPMXXX-19-R-0000
*HINT 1: This identifying information can be embeded within the spreadsheet or in the Header Section of the spreadsheet
Schedule E - G&A Expenses
G&A ExpensesBudgetProjectedProjectedProjectedProjectedActual Expenses
20192020202120222023201620172018
Total Expense Pool$7,500,000$8,000,000$8,150,000$8,280,000$8,300,000$6,800,000.00$6,900,000.00$7,000,000.00
Less Unallowable Costs$ 150,000$ 150,000.00$ 175,000.00$ 125,000.00$ 130,000.00$125,000.00$120,000.00$115,000.00
Net Allowable Expenses$7,350,000$7,850,000$7,975,000$8,155,000$8,170,000$6,925,000.00$7,020,000.00$7,115,000.00
Allocation Base
Total Cost Input$12,000,000$13,000,000$14,000,000$15,000,000$16,000,00010,000,000$10,050,000$11,000,000
G&A Rate61.25%60.38%56.96%54.37%51.06%69.25%69.85%64.68%
Explanatory Notes
1. The budgeted manufacturing overhead expenses and allocation base dollars are based on the company's
operating budget for 2018 and is available immediately upon request.
2. Projected expense pool costs and allocation base dollars for 2019 to 2023 are based on budget forecasts.
3. Supporting documentation is available upon request.
**Use or disclosure of data contained in this workbook is subject to the restricitions on the title page of the proposal
THE INFORMATION CONTAINED IN THIS DOCUMENTATION IS NOT OFFICIAL GOVERNMENT DOCUMENTATION
THIS INFORMATION IS FOR EDUCATION ONLY

&L&"Arial,Bold"THE INFORMATION CONTAINED IN THIS DOCUMENTATION IS NOT OFFICIAL GOVERNMENT DOCUMENTATION

THIS INFORMATION IS FOR EDUCATION ONLY

&CProprietary Information Use or disclosure of data contained in this workbook is subject to the restricitions on the title page of the proposal

&A

MBD014E4A5C.doc

PROPOSAL COVER SHEET

1.

Solicitation/Contract/Modification No.: SPMXXX-19-R-0000

Company Name

3990 East Highway

Columbus, OH 43213

3.

Point of Contact

Jane Doe

Program Manager

(614) 692-9999

4.

Contract Administration Office

Audit Office

DCMA Columbus

DCAA District Branch Office

200 North High St

200 North High St

Columbus, OH 43213-9999

Columbus, OH 43213-9999

5.

Type of Contract Action: New Contract – Firm Fixed Price IQC

6.

Proposed Cost + Profit or Fee = Total:

$6,939,749.68+ $693,974.97 = $7,633,724.65

7.

Government Property:

We will not require the use of any Government property in the performance of this work.

8.

Cost Accounting Standards (CAS) and Estimating & Accounting Compliance:

a. Our organization is NOT subject to the Cost Accounting Standards Board (CASB) Regulations (Public Law 91-379) as amended and FAR Part 30. We have a Small Business Exemption.

b. This contract action is NOT subject to CAS. We have a Small Business Exemption.

c. NO, we have not submitted a CASB Disclosure Statement (CASB DS-1 or 2).

d. We have NOT been notified that we are or may be in noncompliance with our Disclosure Statement or CAS.

e. NO aspect of this proposal is inconsistent with our disclosed practices or applicable CAS.

f. YES, this proposal is consistent with our established estimating and accounting practices and procedures and FAR Part 31, Cost Principles.

9.

This proposal reflects our estimates and/or actual costs as of this date and conforms with the instructions in FAR 15.403-5(b)(1) and FAR 15.408, Table 15-2. By submitting this proposal, we grant the Contracting Officer and authorized representative(s) the right to examine, at any time before award, those records, which include books, documents, accounting procedures and practices, and other data, regardless of type and form or whether such supporting information is specifically referenced or included in the proposal as the basis for pricing, that will permit an adequate evaluation of the proposed price.

10.

Date __________________________

11.

Signature of authorized representative ___________________________________