Contractor Information Form.docx
DOCX document 25 KB Posted
- Solicitation number
- N40085-23-R-2516
About this file
This document contains a sources sought notice and contractor information form from the Naval Facilities Engineering Command, Mid-Atlantic seeking capable small businesses to perform construction services for a project to relocate an underwater electromagnetic measurement system at the Naval Submarine Base New London in Groton, Connecticut. The project involves constructing a new steel-fabricated three-level platform supported by four steel piles in the Thames River, including a weather-resistant data concentrator shed on the third deck to house equipment. It will also require installing two composite submarine cables by jet-plow method and has an option to demolish the existing platform and cables in a future year. Interested sources should complete and submit the attached contractor information form and project data form by October 25, 2022 to be considered, providing details on their relevant experience with in-water steel structures, communication facilities, and demolition projects of a minimum size and scope. The anticipated contract award date is June 2023.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Project Information Form.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOURCES SOUGHT – CONTRACTOR INFORMATION FORM
Use this form to provide contractor’s general information. Please limit response to one page. The box at the bottom of this form may be used to clarify any requested information.
| 1. Contractor Information: |
| DUNS: |
| CAGE Code: |
| Firm Name: |
| Address: |
| Name of POC for firm: |
| Phone Number of POC: |
| Email of POC: |
2. Type of Business: (check all that apply)
| |_| SBA certified 8(a) firm |
| |_| SBA certified HUBZone Small Business |
|_| Service-Disabled Veteran-Owned Small Business
|_| Veteran Owned Small Business
|_| Woman Owned Small Business
|_| Economically Disadvantaged Women-Owned |_| Small Business Small Business
3. Bonding Capacity:
| Surety Name: |
| Maximum bonding capacity per project: |
| $ |
| Aggregate maximum bonding capacity: |
| $ |
4. This space may be used to provide any additional information to clarify the above items only:
Please DO NOT change content of the form
File details come from the government source that posted it. Updated .