This Request for Professional Services (RPS #262886MN) is issued by Sarasota County, Florida, seeking a qualified Construction Manager at Risk (CMAR) to provide pre-construction and construction phase services for the Northeast Jail Addition at the downtown Sarasota Correctional Campus. The proposed multilevel correctional facility will encompass approximately 15,000 to 20,000 assignable square feet and be constructed within the footprint of the existing correctional campus at the southwest corner of Main Street and East Avenue on the site of the decommissioned Central Energy Plant. The facility will primarily provide dormitory-style housing for inmates designed to maximize bed capacity within a fixed budget while incorporating flexibility on the ground level for future intake, booking, and other correctional campus functions. Prospective proposers must be Certified General Contractors licensed in Florida and should demonstrate experience providing CMAR services, with preferred qualifications including completion of at least two projects exceeding $20 million within the past ten years and experience on active public campuses with restricted logistical footprints. Proposals are to be submitted through the County's electronic procurement portal, OpenGov Procurement, with all meetings and presentations to occur at times, dates, and locations specified in the solicitation timeline available in OpenGov.
The selection process requires proposers to provide written proposals evaluated by the Professional Services Review Committee using criteria including ability of professional personnel, past performance and experience, approach, and workload analysis. The County will conduct presentations with a minimum of three highest-scoring proposers and will rank short-listed proposers based on written proposals, clarifications, and presentation performance, ultimately recommending the highest-ranked proposer for award. The selected CMAR will initially enter a pre-construction services contract with the option for the County to amend it to include construction phase services upon acceptance of a Guaranteed Maximum Price proposal; the County may negotiate the percentage of CM fees and other service aspects at the time pre-construction services are negotiated. The project is subject to Sarasota County's sustainability and green building resolutions, compliance with Florida Model Jail Standards and Florida Corrections Accreditation Commission standards, and coordination with the separately selected design consultant and commissioning agent. Insurance requirements include Workers' Compensation, Commercial General Liability of $1,000,000 per occurrence/$2,000,000 aggregate, Business Automobile Liability of $1,000,000 combined single limit, and Umbrella/Excess Liability of $2,000,000; once the project enters the construction phase, the CM must maintain Builder's Risk insurance for the full Guaranteed Maximum Price plus change orders.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR PROFESSIONAL SERVICES (“RPS”) – PART I
RPS Part I Rev. 02/10/25 Page 1 of 6
RPS #: 262886MN
RPS TITLE: Construction Manager at Risk (CMAR) Services for the Northeast Jail
Addition
PURPOSE
In accordance with Section 287.055, Florida Statutes, Sarasota County, a political subdivision of the State of Florida, will receive proposals on the date indicated in OpenGov Procurement (OpenGov), the County’s electronic procurement portal for the purpose of selecting a qualified Proposer to provide CMAR Services for the addition to the downtown Sarasota Correctional Campus.
Proposers are required to comply with Part II, Scope of Services.
OpenGov is located at https://procurement.opengov.com/portal/scgov
PROPOSER
2.1 For the purposes of this RPS, the term “Proposer” is defined as the legal entity submitting a proposal.
2.2 Proposers intending to submit a bid as a joint venture with another company must provide documentation attesting to the formation of that joint venture with their submittal. For purposes of this solicitation, all vendors who make up the joint venture will be considered together as the Proposer.
QUALIFICATIONS
3.1 The Proposer must be a Certified General Contractor (CGC) licensed in the State of Florida at the time of submittal.
3.2 Proposals should demonstrate experience providing CMAR services.
3.3 Preferred Qualifications
3.3.1 Acting as a Construction Manager, the proposer has completed a minimum of two (2) projects in the past ten (10) years for a commercial, public municipal, or educational building facility costing not less than $20M.
3.3.2 Acting as a Construction Manager, the proposer has completed a minimum of one (1) project in the past ten (10) years on an active public campus with a restricted logistical footprint.
3.3.3 Proposer's team has experience working with public project owners.
https://procurement.opengov.com/portal/scgov
RPS Part I Rev. 02/10/25 Page 2 of 6
3.3.4 Proposer's team has experience working in correctional facilities with restricted access.
MEETINGS & SCHEDULE
An anticipated schedule is provided in the Timeline posted in OpenGov. All meetings will take place at the time, date, and location specified in the solicitation Timeline. Short-listed Proposers should be prepared to attend presentations and/or interviews either in Sarasota, Florida or virtually, at the County’s discretion.
SUBMITTAL INSTRUCTIONS
Refer to the Submittal Instructions section in OpenGov for instructions on how to submit a proposal. Proposers are advised to review the General Terms and Conditions of Solicitations which are available in OpenGov.
VENDOR QUESTIONNAIRE
6.1 All proposers must complete the required forms and information included in the Vendor Questionnaire section of OpenGov. Completed forms and other requested documents must be uploaded with proposer’s submittal in OpenGov. Proposers who fail to complete and upload required forms and documents or fail to provide responses to questions in the Vendor Questionnaire section of OpenGov may be found non-responsive.
WRITTEN PROPOSALS
The information requested in each section below will be used by the evaluation committee to evaluate and score written proposals. All proposal documents must be submitted in the Vendor Questionnaire section in OpenGov in the format requested.
7.1 Ability of Professional Personnel
7.1.1 Single page letter of interest summarizing Proposer’s
qualifications.
7.1.2 Required and preferred licenses and certifications.
7.1.3 Resumes of key personnel, including subconsultants, demonstrating individual qualifications and experience.
7.2 Proposer’s Past Performance & Experience
7.2.1 Complete the Summary of Professional Experience &
Capabilities Form in the Vendor Questionnaire section of OpenGov). Projects submitted should demonstrate the
RPS Part I Rev. 02/10/25 Page 3 of 6 experience of the Proposer, subcontractor(s), and current team members who may have worked for other firms on similar projects and provide detailed information regarding the Proposer’s capabilities, project management techniques, and project controls.
7.3 Approach
7.3.1 Project Approach – Provide a detailed project approach that includes, but is not limited to the following:
a. Project management techniques, controls, program and technologies to be employed to meet project schedule and budget requirements.
b. Assignment of personnel to provide the most efficient service.
c. Where elements of the work will be performed, and who in the organizational chart will oversee performance of the work to provide the most efficient services.
d. Anticipated impacts of the Proposer’s current and projected workload on the project.
e. Detailed information explaining how location of the firm, key personnel and sub-contractors will affect project, including how impact of any physical distance will be mitigated through the use of technology, processes or other means.
7.3.2 Workload
Complete the Current & Projected Workload Form (in the Vendor Questionnaire section of OpenGov) to identify active and awarded projects.
7.3.3 Organization
a. Provide an organizational chart delineating personnel assigned to the project (including subconsultants).
b. Provide an organizational chart showing the corporate management structure of the Proposer.
7.3.4 Schedule/Timeline
Provide a graphical representation of the proposed project schedule/timeline indicating major milestones and deliverables.
RPS Part I Rev. 02/10/25 Page 4 of 6
SELECTION PROCESS
8.1 Written Proposals
8.1.1 All timely responses meeting the criteria set forth in this RPS will be considered by the County.
8.1.2 Written proposals will be evaluated and scored by the
Professional Services Review Committee (PSRC) using the evaluation criteria in the Evaluation Criteria section of OpenGov.
8.1.3 When evaluating written proposals, the PSRC will use the scale below to score each criterion. Only whole numbers are to be used when scoring. Scores will be given weight as indicated in the evaluation criteria in OpenGov.
Score Description
5 Excellent
4 Very Good
3 Good
2 Satisfactory
1 Unsatisfactory
0 N/A
8.2 Presentations
The PSRC will conduct discussions with, and may require public presentations by, no fewer than the three (3) highest scoring Proposer
8.3 Ranking
Following discussions or presentations, the PSRC will rank the short-listed Proposers. When ranking short-listed Proposers, the PSRC will consider information contained in the written proposals, clarifications (if any), and information provided during discussions or presentations.
Ranking shall be determined without regard to the score established as a result of the evaluation of written proposals.
8.4 Recommendation of Award
The Proposer ranked first by the PSRC will be recommended for award.
RPS Part I Rev. 02/10/25 Page 5 of 6
AWARD
9.1 It is the intent of the County to award a contract to the Proposer(s) who, in the sole opinion of the County, is most qualified to perform the scope of services required.
9.2 In the event of a tie the tie-breaking procedures identified in the Sarasota County Procurement Manual will apply.
9.3 Local preference as defined in the Procurement Code section 2-215 is not applicable to this solicitation.
9.4 Contract
A draft of the contract that the successful Proposer(s) will be expected to sign (a CM at Risk Preconstruction Agreement) is posted on the Procurement website, shown below. The County may, in its sole discretion, select a different contract type or make revisions to the one referenced above following the recommended award of this solicitation.
https://www.scgov.net/government/procurement/contract-templates
CONFLICT OF INTEREST
10.1 Any Proposer who has drafted any portion of a scope of work or specifications for a project, or any entity which provides material assistance to such Proposer in such work, shall be ineligible to compete for the contract for design or construction of that project.
10.2 Selected Proposers, either directly or through an affiliate, may not have a business relationship with any entity to perform work related to a work assignment issued under any resulting contract
CHANGES IN PROJECT TEAM
11.1 A change in the project team of a Proposer after the submission of a proposal could result in reconsideration of the scoring of applicable evaluation criteria, at the sole discretion of the County.
11.2 Any changes in the Proposer’s Key Personnel must be brought to the attention of Procurement as soon as possible after the change is made.
The changes, the reasons for the changes, and resumes for the individuals being substituted for an original project team member, must be submitted to the Procurement Analyst identified in the Solicitation Summary prior to the scheduled evaluation committee meeting.
RPS Part I Rev. 02/10/25 Page 6 of 6
11.3 Decreases in scoring may result from the reconsideration of changes in the project team of a Proposer. No increases in scoring will result from the reconsideration of changes in the project team of a Proposer.
11.4 After recommendation of award, the successful Proposer shall not be allowed to substitute project team members named in this proposal without the prior written permission of the County. Substitution may, in the sole opinion of the County, be grounds for cancellation of a recommended award, or termination of agreement.
REUSE OF EXISTING PLANS
12.1 The plans on this project are subject to reuse in accordance with Section
287.055 (10), Florida Statutes.
PART II
SCOPE OF SERVICES
RPS Rev. 01/31/20 Part II - Page 1 of 3 Prepared by Capital Projects Department
1. Background
A. Sarasota County’s correctional system is currently experiencing significant population stress and based on recent Sheriff office projections, the population will continue to rise significantly through the year 2050. The current Sarasota County correctional campus is in the heart of downtown Sarasota. The primary objective of this Project is to plan, design, permit, procure, and construct a multilevel correctional facility that will maximize additional bed capacity, yet have the flexibility to accommodate other intake and booking functions for future needs. The new facility is to be located within the footprint of the existing correctional campus at the southwest corner of Main Street and East Avenue at the site of the decommissioned Central Energy Plant. The proposed multilevel facility will have an approximate area of 18,500 SF. It is expected to maximize the number of beds for dormitory-style housing within the proposed total project budget, with flexibility on the ground level to accommodate other functions in the future if needed.
B. The project is within the City of Sarasota jurisdiction.
C. Site maps of the correctional campus (Attachment A) and anticipated project location (Attachment B) are included for reference.
2. Project Design and Programmatic Requirements
Project programmatic requirements may include, but are not limited to, selected components of the following:
A. Consultant will establish all programmatic requirements with Capital Projects and the Sarasota Sheriff’s Office (SSO).
i. The Facility shall be designed in coordination with the operational and physical context of the existing Correctional Campus.
B. The facility is anticipated to be roughly 15,000 – 20,000 of assignable square feet.
C. The facility will primarily provide dormitory style housing for inmates, with an effort to maximize the number of inmates housed within the project budget.
D. The first level shall be designed with the flexibility to be remodeled to temporarily accommodate correctional campus functions such as a sallyport, intake, booking, property, etc.
E. The facility may include supporting workspaces, such as storage, office space, restroom and break room.
RPS Rev. 01/31/20 Part II - Page 2 of 3
F. Security and safety of correctional officers, inmates, and the correctional campus itself shall be paramount in the design of the facility.
G. This will be a fixed budget project, and the design will be constrained by the total project budget.
H. The facility will be programmed and designed in accordance with the Florida Model Jail Standards (FMJS), Florida Corrections Accreditation Commission (FCAC), and state statutes, such as the ratio of inmates to sinks toilets and showers, minimum square footage for inmates in the cells and dayrooms, lighting, ventilation, etc.
I. All existing campus correctional facilities and security functions shall be operational throughout the project life cycle. The project program shall incorporate design elements and any necessary phasing to accommodate an active campus.
J. It is anticipated that the facilities will include a full-building emergency generator. Utility improvements either on or off-site, and/or off-site roadway improvements may be required.
K. The project footprint is within the City of Sarasota limits. Any applicable city coordination and Major Conditional Use permit requirement may be part of the project program.
L. The Consultant shall utilize requirements of the current edition of Sarasota County General Services, Facilities Preferred Building Equipment and Design Catalog.
M. The Consultant shall incorporate requirements of the current edition of Sarasota County Network Infrastructure Standard for Div. 27 & 28
N. Sustainability Requirements:
i. Facility design shall follow Resolution 2024-016 encouraging fossil fuel reduction for meeting energy needs.
ii. This project will follow the parameters as set by the Green Development Resolution No. 2006-174, the Green Building Resolution No. 2005-048, and the Sustainability Resolution 02-119 of the Board of County Commissioners of Sarasota County.
3. General Services of the Consultant
A. This request is for complete Construction Manager at Risk (CM) services to include pre-construction and construction phase services for the facility as identified in the scope above.
B. The selected CM will enter a contract with the County for pre-construction services, up to and including the furnishing of a Guaranteed Maximum Price
RPS Rev. 01/31/20 Part II - Page 3 of 3
(GMP) proposal for construction phase services. If the proposal is accepted, the County will amend the pre-construction services contract to include construction phase services. At the time the pre-construction services are negotiated, the County may elect to negotiate the percentage of CM Fee, as well as other aspects of the services to be provided by the CM during the construction phase.
C. Generally, Pre-construction Phase Services will include such services as:
i. Design review and recommendations including cost-reducing alternatives and comparisons versus long-term cost effects, and milestone cost estimating.
ii. Coordination with design team.
iii. Feedback on market analysis of long-lead items and stimulation of bidder interest.
iv. Early or multiple GMP proposals for phased construction may be requested.
v. Pre-construction services will conclude with either the acceptance or rejection of the construction Phase Services proposal by the County.
D. Generally, Construction Phase Services, if accepted, will be “turn-key” for project delivery and include management control systems and administration of the construction project, acting as General Contractor, subcontracting all components of the work, scheduling, bookkeeping, site and safety logistics/mobilization, quality control practices in compliance with local, state, and federal regulations. The County may directly purchase components of the Construction project.
E. Design services are to be selected under a separate solicitation and awarded through a separate contract.
i. CM services shall include coordination with the County’s selected design consultants.
F. Commission Agent services are to be selected under a separate solicitation and awarded through separate contract.
i. CM services shall include coordination with the County’s selected Commissioning Agent. Such services shall include, but may not be limited to, providing milestone documents, responding to requests for information and reviewing Commissioning Agent submittals and applications.
Attachments:
Attachment A – Site Map of Correctional Campus
Attachment B – Anticipated Project Location
PART III – INSURANCE REQUIREMENTS
Insurance Template 2 Revised 05/13/16 Page 1 of 2
CONTRACTOR’S INSURANCE
Contractor shall, on a primary basis and at its sole expense, maintain in full force and effect, at all times during the life of this Contract, insurance coverage (including endorsements) and limits as described herein. These requirements, as well as the County’s review or acceptance of insurance maintained by Contractor, are not intended to and shall not in any manner limit or qualify the liabilities or obligations assumed by Contractor under this Contract.
Insurance requirements itemized in this Contract and required of the Contractor shall extend to all subcontractors to cover their operations performed under this Contract.
The Contractor shall be responsible for any modifications, deviations, or omissions in these insurance requirements as they apply to subcontractors.
Insurance carriers providing coverage required herein must be licensed to conduct business in the State of Florida and must possess a current A.M. Best’s Financial Strength Rating of A- Class VII or better.
Each insurance policy required by this Contract shall apply separately to each insured against whom claim is made and suit is brought, except with respect to limits of the insurer’s liability.
The Contractor shall be solely responsible for payment of all premiums for insurance contributing to the satisfaction of this Contract and shall be solely responsible for the payment of all deductibles and retentions to which such policies are subject.
Contractor shall furnish Certificates of Insurance to the County Administrative Agent evidencing the types and amounts of coverage, including endorsements, required by this Contract prior to commencement of work and prior to expiration of the insurance contract, when applicable. Such Certificate(s) of Insurance shall, to the extent allowable by the insurer, include a minimum thirty (30) day notice of cancellation (10 days for non-payment of premium) or non-renewal of coverage. Notwithstanding these notification requirements, the Contractor will be required to provide County with at least 5 days prior written notice of any policy cancellation or non-renewal.
The County reserves the right to review, modify, reject, or accept any required policies of insurance, including limits, coverage, or endorsements, herein from time to time throughout the term of this Contract. County reserves the right, but not the obligation, to review and reject any insurer providing coverage due to its poor financial condition or failure to operate legally.
A. WORKERS’ COMPENSATION: Contractor shall maintain Workers’ Compensation insurance in accordance with Florida Statutes, Chapter 440. Employers Liability to be included with a minimum limit of $500,000.00 per accident/per disease/per employee. If work is to be performed over or adjacent to navigable water and involves maritime exposure, applicable LHWCA, Jones Act, or other maritime law coverage shall be included.
In the event the Contractor has “leased” employees, the Contractor or the employee leasing company must provide evidence of a Workers’ Compensation policy for all personnel on the worksite.
PART III – INSURANCE REQUIREMENTS
Insurance Template Adopted 04/19/19 Page 2 of 2
B. COMMERCIAL GENERAL LIABILITY: Contractor shall maintain Commercial General Liability per ISO form CG0001 or its equivalent, including but not limited to coverage for premises and operations, personal injury, products & completed operations, liability assumed under an insured contract, and independent contractors with limits of not less than $1,000,000.00 each occurrence, $2,000,000.00 aggregate covering all work performed under this Contract. There shall be no exclusions for explosion, collapse and underground hazards.
Contractor agrees to endorse Sarasota County Government as an additional insured on the Commercial General Liability coverage.
C. BUSINESS AUTOMOBILE LIABILITY: Contractor agrees to maintain Business Automobile Liability with limits not less than $1,000,000.00 combined single limit for each accident covering all Owned, Non-Owned & Hired automobiles used in the performance of this Contract. In the event Contractor does not own automobiles, Contractor agrees to maintain coverage for Hired & Non-Owned Auto Liability, which may be satisfied by way of endorsement to the Commercial General Liability policy or separate Business Auto Liability policy.
If the Contractor is shipping a product via common carrier, the contractor shall be responsible for any loss or damage sustained in delivery/transit.
D. UMBRELLA/EXCESS LIABILITY: Contractor agrees to maintain Umbrella or Excess Liability with limits not less than $2,000,000.00 each occurrence and in the aggregate. Coverage shall follow the terms of the underlying insurance, including the additional insured provisions.
E. SPECIALIZED REQUIREMENTS: Required if and when a Project Assignment moves to Construction Phase.
BUILDERS RISK: CM shall maintain, at CM’s expense, and keep in force during the term of the Project Assignment, Builder’s Risk insurance on an all risks of direct physical loss basis, including without limitation, earth movement, flood and windstorm, for an amount equal to the full GMP plus all subsequent change orders on a replacement cost basis. Insured property shall include portions of the work located away from the site but intended for use at the site, and shall also cover portions of the work in transit.
Such insurance shall be maintained until final payment has been made or until no other person or entity, other than the County has an insurable interest in the property required to be covered. The policy shall be endorsed such that the insurance shall not be cancelled or lapse because of any partial use or occupancy of the County.
Sarasota County Government, the CM and its subcontractors shall be included as Insureds on the policy.
Waiver of subrogation is to apply against all parties named as Insureds, but only to the extent the loss is covered.
CM is responsible for the payment of all policy deductibles. Maximum deductible amounts shall not be greater than $25,000 except for perils of earthquake, flood and windstorm, unless otherwise approved by the County.
| 262886MN - Part I RPS |
| 262886MN - Part II Scope |
| 1. Background |
| A. Sarasota County’s correctional system is currently experiencing significant population stress and based on recent Sheriff office projections, the population will continue to rise significantly through the year 2050. The current Sarasota County corr... |
| B. The project is within the City of Sarasota jurisdiction. |
| C. Site maps of the correctional campus (Attachment A) and anticipated project location (Attachment B) are included for reference. |
| 2. Project Design and Programmatic Requirements |
| A. Consultant will establish all programmatic requirements with Capital Projects and the Sarasota Sheriff’s Office (SSO). |
| i. The Facility shall be designed in coordination with the operational and physical context of the existing Correctional Campus. |
| B. The facility is anticipated to be roughly 15,000 – 20,000 of assignable square feet. |
| C. The facility will primarily provide dormitory style housing for inmates, with an effort to maximize the number of inmates housed within the project budget. |
| D. The first level shall be designed with the flexibility to be remodeled to temporarily accommodate correctional campus functions such as a sallyport, intake, booking, property, etc. |
| E. The facility may include supporting workspaces, such as storage, office space, restroom and break room. |
| F. Security and safety of correctional officers, inmates, and the correctional campus itself shall be paramount in the design of the facility. |
| G. This will be a fixed budget project, and the design will be constrained by the total project budget. |
| H. The facility will be programmed and designed in accordance with the Florida Model Jail Standards (FMJS), Florida Corrections Accreditation Commission (FCAC), and state statutes, such as the ratio of inmates to sinks toilets and showers, minimum squ... |
| I. All existing campus correctional facilities and security functions shall be operational throughout the project life cycle. The project program shall incorporate design elements and any necessary phasing to accommodate an active campus. |
| J. It is anticipated that the facilities will include a full-building emergency generator. Utility improvements either on or off-site, and/or off-site roadway improvements may be required. |
| K. The project footprint is within the City of Sarasota limits. Any applicable city coordination and Major Conditional Use permit requirement may be part of the project program. |
| L. The Consultant shall utilize requirements of the current edition of Sarasota County General Services, Facilities Preferred Building Equipment and Design Catalog. |
| M. The Consultant shall incorporate requirements of the current edition of Sarasota County Network Infrastructure Standard for Div. 27 & 28 |
| N. Sustainability Requirements: |
| i. Facility design shall follow Resolution 2024-016 encouraging fossil fuel reduction for meeting energy needs. |
| ii. This project will follow the parameters as set by the Green Development Resolution No. 2006-174, the Green Building Resolution No. 2005-048, and the Sustainability Resolution 02-119 of the Board of County Commissioners of Sarasota County. |
| 3. General Services of the Consultant |
| A. This request is for complete Construction Manager at Risk (CM) services to include pre-construction and construction phase services for the facility as identified in the scope above. |
| B. The selected CM will enter a contract with the County for pre-construction services, up to and including the furnishing of a Guaranteed Maximum Price (GMP) proposal for construction phase services. If the proposal is accepted, the County will amend... |
| C. Generally, Pre-construction Phase Services will include such services as: |
| i. Design review and recommendations including cost-reducing alternatives and comparisons versus long-term cost effects, and milestone cost estimating. |
| ii. Coordination with design team. |
| iii. Feedback on market analysis of long-lead items and stimulation of bidder interest. |
| iv. Early or multiple GMP proposals for phased construction may be requested. |
| v. Pre-construction services will conclude with either the acceptance or rejection of the construction Phase Services proposal by the County. |
| D. Generally, Construction Phase Services, if accepted, will be “turn-key” for project delivery and include management control systems and administration of the construction project, acting as General Contractor, subcontracting all components of the w... |
| E. Design services are to be selected under a separate solicitation and awarded through a separate contract. |
| i. CM services shall include coordination with the County’s selected design consultants. |
| F. Commission Agent services are to be selected under a separate solicitation and awarded through separate contract. |
| i. CM services shall include coordination with the County’s selected Commissioning Agent. Such services shall include, but may not be limited to, providing milestone documents, responding to requests for information and reviewing Commissioning Agent s... |
| Attachments: |
| Attachment A – Site Map of Correctional Campus |
| Attachment B – Anticipated Project Location |