Construction Management Services RFP - County of Orange

This is a Request for Proposal (RFP) from the County of Orange, California, Public Works department for Construction Management (CM) services related to a new Emergency Operation Center. The project encompasses construction of a new parking structure, site reconfiguration, expansion and renovation of the existing building located at 1382 Bell Avenue in Tustin, California to accommodate essential EOC operations. Respondents are required to attend a mandatory pre-submittal meeting and site visit on July 15, 2026 at 10:00 AM at the OC Sheriff's Facility in Tustin. The RFP was released on July 1, 2026, with questions due by July 24, 2026 at 2:00 PM and proposals due by July 30, 2026 at 10:00 AM. Interviews with top-ranked firms are tentatively scheduled for September 1, 2026. The CM services shall include oversight of facility design and construction, third-party testing, inspections, and commissioning to verify compliance with codes, standards, and project specifications. Respondents must have a minimum of ten years of consecutive construction management experience, ability to provide all required third-party testing and inspections, and demonstrated experience with similar technology projects for at least three public agencies. All responses must remain valid for 365 calendar days from the closing date.

Evaluation will occur in two phases: Phase 1 consists of written response scoring (500 points maximum) based on firm background and qualifications (175 points), key personnel and staffing (150 points), quality and effectiveness of work plan and project approach (125 points), organization and completeness of response (25 points), and compliance with the County Model Contract (25 points). Phase 2 involves presentation and interview scoring (500 points maximum) if conducted by the County at its discretion. The RFP requires compliance with County of Orange Local Small Business (OCLSB) and Disabled Veteran Business Enterprise (DVBE) preference policies; however, DVBE preference does not apply to public works projects. For projects exceeding five million dollars, at least three percent of the total contract value must be subcontracted to certified OCLSB or DVBE firms. Respondents must provide five references, including at least three from public sector entities comparable to the County of Orange, from work performed within the past five years. The County reserves the right to negotiate fees and contract terms with the selected respondent, defer award for up to 180 days, reject any response, request best and final offers, or cancel the solicitation entirely. Cost proposals are to be submitted at the time of interview in a sealed envelope and will not count toward the Phase 1 evaluation score.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COUNTY OF ORANGE

OC PUBLIC WORKS

REQUEST FOR PROPOSAL (RFP)

FOR

CONSTRUCTION MANAGEMENT (CM) FOR NEW EMERGENCY

OPERATION CENTER

RFP NO. -036-3070902-JM

RESPONSES MUST BE SUBMITTED ELECTRONICALLY TO:

https://secure.procurenow.com/portal/ocgov https://secure.procurenow.com/portal/%7bproject.government.code%7d

County of Orange RFP

OC Public Works - Construction Management (CM) for New Emergency Operation Center, -036-3070902-JM

County of Orange

OC Public Works

Procurement and Contract Services

601 N. ROSS ST

SANTA ANA, CA

92701

SCHEDULE OF ACTIVITIES

Release of RFP Solicitation July 1, 2026

Pre-Submittal Meeting and Site Visit

(Mandatory)

July 15, 2026, 10:00am

OC Sheriffs Facility, 1382 Bell Ave, Tustin, CA 92780

Question Submission Deadline July 24, 2026, 2:00pm

RFP Submittal Closing July 30, 2026, 10:00am

Interviews with the Top Ranked

Firm(s) Tentative

September 1, 2026, 10:00am

PROPOSALS MUST BE RECEIVED ON

OR BEFORE

Thursday, July 30, 2026

10:00 am

SECTIONS

SECTION 1. INTRODUCTION AND INSTRUCTIONS TO RESPONDENTS

SECTION 2. PROTEST PROCEDURES

SECTION 3. SCOPE OF WORK

SECTION 4. OCLSB AND DVBE PREFERENCE POLICIES CERTIFICATION

REQUIREMENTS

SECTION 5. SCORING CRITERIA

SECTION 6. VENDOR RESPONSES

Attachments:

A - Notice of Inviting Bids RFP#036-3070902-JM

B - Model Contract RFP-036-3070902-JM

C - Orange_County_District_Attorneys_Office_Public_Works_Unit_2023

D - 20260213_EOC-Tustin-100%_Criteria_Narrative - Signed

E - EOC-Tustin-100% Exhibits - All Exhibits

F - A-E_Guide_FINAL_10_2025

SECTION 1. INTRODUCTION AND INSTRUCTIONS TO RESPONDENTS

1.1 INTRODUCTION

The County intends that the successful Respondent shall provide Construction Management (CM) for New Emergency Operation Center proposed in accordance with contract requirements set forth in the solicitation and Model Contract, including Attachments.

1.2 COUNTY HOLIDAYS DURING SOLICITATION PERIOD

During this solicitation period, the OC Public Works will be closed on the following County holidays - https://hrs.oc.gov/employee-relations/employee-resources

1.3 INSTRUCTIONS TO RESPONDENTS AND PROCEDURES FOR SUBMITTAL

A. Responses are to be uploaded via the County's eProcurement Portal at https://procurement.opengov.com/portal/ocgov. For assistance on uploading Response via County’s eProcurement Portal, please contact procurement-support@opengov.com or https://help.procurement.opengov.com/en/

B. Examine the Contract Documents and the site of the proposed work carefully before submitting a Response for the work contemplated. Investigate the conditions to be encountered, as to the character, quality, and quantities of work to be performed and materials to be furnished and as to the requirements of all Contract Documents.

The County has attempted to provide all information available. It is the responsibility of each Respondent to review, evaluate, and, where necessary, request any clarification prior to submission of a Response. If any person contemplating submitting a response to this

Request for Proposal (RFP) is in doubt as to the true meaning of any part of the solicitation documents attached hereto or finds discrepancies in or omissions from the specifications, they may submit a written request for clarification/interpretation to the County Deputy

Procurement Agent (DPA) via the County’s eProcurement Portal under the bid page for this solicitation.

If clarification or interpretation of this solicitation is considered necessary by County, an addendum shall be issued, and the information will be posted via the County’s eProcurement Portal. Any interpretation of, or correction to, this solicitation shall be issued by the DPA. It is the responsibility of each Respondent to periodically check the County’s eProcurement Portal to ensure that they have received and reviewed any and all addenda to this solicitation.

The County will not be responsible for any other explanations, corrections to, or interpretations of the documents, including any oral information. If an addendum is issued, Respondents must acknowledge the addendum via the County’s eProcurement Portal.

All questions or requests for interpretations must be received within this solicitation by Friday, July 24, 2026, before 2:00 pm. The DPA will provide all official communication concerning this solicitation. Any County response relevant to this https://hrs.oc.gov/employee-relations/employee-resources https://procurement.opengov.com/portal/ocgov https://procurement.opengov.com/portal/ocgov mailto:procurement-support@opengov.com https://help.procurement.opengov.com/en/ solicitation other than through or approved by the DPA is unauthorized and will be considered invalid.

C. Responses must be valid for a period of at least three hundred sixty-five (365) calendar days from the closing date and time of receipt. No Response may be withdrawn after the submission date.

D. Each Respondent must submit their response electronically via the County’s eProcurement

Portal.

E. All pages must be submitted on standard 8.5 x 11-inch paper, numbered and identified sequentially by section. Responses must be organized and indexed as outlined in the

Response Requirements Section. It is imperative that all Respondents comply, exactly and completely, with the instructions set forth herein. All responses to this solicitation shall be type written or word-processed (except where otherwise provided or noted), concise, straightforward, and must fully address each requirement and question. Although not as a substitute for a complete written response, additional material, such as technical documents, may be referenced in any response if the material is included in the same section as additional information.

F. Responses are not to be marked as confidential or proprietary. The County may refuse to consider any Responses so marked. All Responses and supporting documents will be subject to the provisions of the California Public Records Act (California Code

Government Code 7920.000 et seq.) (PRA) and will be disclosed or withheld in accordance therewith. The County shall not be liable in any way for disclosure of any such records.

Additionally, all Responses shall become the property of the County. Respondents should not request that certain information be treated as exempt, and statements in the Responses should not be marked as confidential or proprietary. In the event that any information is marked as confidential or proprietary, as it may be absolutely necessary, Respondents have the sole responsibility of obtaining any applicable injunctive reliefs to prevent the disclosure of such confidential proprietary information in connection with any request made to County pursuant to PRA or a subpoena for disclosure of such information.

G. Each Respondent shall exercise reasonable care and diligence to avoid submitting a

Response that could result in a conflict of interest if Respondent were to be selected. This obligation shall apply to the Respondent, the Respondent’s employees, agents, and relatives, sub-contractors, and third parties associated with accomplishing work and services in response. In the event Respondent has done work for the County on this Project in the past or has reason to believe that a conflict of interest may exist for Respondent in regard to this Project, Respondent should consult with its legal counsel prior to responding to this solicitation. Any Respondent who is found to have an actual conflict of interest may have its response rejected on that ground.

Respondent, its employees and/or consultants may be subject to the provisions of the

California Political Reform Act of 1974 (the “Act”), which (1) requires such persons to disclose any financial interest that may be materially affected by services provided under this Contract, (2) prohibits such persons from making, or participating in making, decisions that could reasonably affect such interest; and (3) may require the filing a Statement of

Economic Interest (Form 700).

If subject to the Act, Respondent shall conform to all requirements of the Act. Failure to do so shall constitute a material breach and is grounds for immediate termination of the

Contract by County. Respondent shall indemnify and hold harmless County for any and all claims for damages resulting from Respondent’s violation of this Section.

H. By submitting a response, the Respondent represents that it thoroughly examined the

County’s requirements, is familiar with the services required under this solicitation and is qualified and capable of providing the services to achieve the County’s objectives.

I. Each Respondent must submit its response in strict accordance with all requirements of this solicitation and compliance must be stated in the response. Deviations, clarifications and/or exceptions must be clearly identified and listed separately as alternative items on additional information section for the County’s consideration as specified in the

Response Requirements Section, “Statement of Compliance.”

Note: Allow sufficient time to upload all required files. The County’s eProcurement Portal will not allow any uploads after the due date and time specified herein, e.g., if Part 1 and 2 uploaded successfully at 1:58:38 P.M. and Part 3 is in progress of being uploaded at 2:00:01

P.M., Part 3 will not upload successfully.

J. Pre-contractual expenses are not to be included in the Cost Proposal, Attachment B, Pricing and Compensation. Pre-contractual expenses are defined as including, but not limited to, expenses incurred by the Respondent in: a) preparing the response to this solicitation; b) submitting that response to the County; c) negotiating with the County any matter related to the Respondent’s response; and d) any other expenses incurred by the Respondent prior to the date of award and execution, if any, of the Contract.

K. Any response may be construed as non-responsive and ineligible for consideration if it does not comply with the requirements of the solicitation, including but not limited to technical features, acknowledgment of receipt of addenda, and page number limits, etc. These are common causes for deeming a response non-responsive.

L. Where two or more Respondents desire to submit a single response to this solicitation, they must do so on a prime/subcontractor basis rather than as a joint venture. The County intends to contract with a single firm that may subcontract with multiple firms (team) but not with multiple firms doing business as a joint venture.

M. County does not require and neither encourages nor discourages the use of lobbyists or other consultants for the purpose of securing business.

N. The County requires a valid D-U-N-S number prior to Contract Award. If needed, your company may obtain one at no cost at www.dnb.com. If you are unable to provide/obtain a D-U-N-S number, please indicate so in your submission response.

O. The County requires a valid UEI number and full registration prior to Contract

Award. Your company must obtain one at no cost at www.usfcr.com. If you are unable to provide/obtain a UEI number, please indicate so in your submission response.

P. Effective from the issuance date of this solicitation until a Contract is awarded or the solicitation is withdrawn, all individuals or entities responding—including their employees, agents, representatives, proposed partners, subcontractors, members, lobbyists, or attorneys (collectively "Respondents")—are prohibited from engaging in any direct or indirect communication with County personnel involved in the selection process, except with the designated Deputy Procurement Agent (DPA). Respondents may continue conducting business with the County on matters unrelated to this solicitation and may communicate with County staff, provided the solicitation is not discussed. Any attempt to engage in discussion regarding this solicitation with anyone other than the designated DPA will be presumed to create an unfair competitive advantage and may result in disqualification.

Q. After the closing date and time for receipt of Responses, evaluation, and if requested by the County, interviews will commence. Respondents who submit Responses most responsive to the County’s requirements may be asked to give a presentation of their response to County staff. The County makes no guarantee as to the number of Respondents selected for interviews. Selected Respondents should be prepared to make its presentation within five (5) business days after notification and be prepared to discuss all aspects of its response in detail, including technical questions regarding the response. Respondents shall not be allowed to alter or amend its response through the use of the presentation process.

1.4 MANDATORY PRE-SUBMITTAL MEETING AND SITE VISIT

Attendance of Pre-Submittal Meeting and Site Visit is required and will be held on Wednesday, July 15, 2026 at 10:00 am local time, no one will be admitted 10 minutes after meeting has started.

The meeting will be located at OC Sheriffs Facility, 1382 Bell Ave, Tustin, CA 92780. At this meeting, County staff will discuss the scope of work, general contract issues and respond to questions from the attendees. The Pre-Submittal Meeting and Site Visit will be conducted one time only. Attendance and sign-in at the pre-submittal meeting is required. Contractor must stay until http://www.dnb.com/ http://www.usfcr.com/ the meeting has ended. Failure of any Respondent to attend this Mandatory Pre-Submittal

Meeting and Site Visit shall constitute a substantial variation from the requirements of the Contract

Documents and the response of any Respondent not in attendance will be rejected as nonresponsive. All questions will need to be submitted in writing through the County’s online eProcurement system at https://procurement.opengov.com/portal/ocgov. The Respondent will have until Friday, July 24, 2026 before 2:00 pm to submit questions.

• Please confirm your attendance by replying via the RSVP feature in the County's eProcurement Portal before 07/14/2026 4:00 pm.

• Respondents are responsible for securing parking and payment of parking fees (if applicable)

• Respondents are encouraged to arrive early to ensure a parking space

1.5 MINIMUM QUALIFICATIONS/REQUIREMENTS

Respondents shall meet the following minimum requirements and qualifications to proceed to the evaluation process. Failure to have the ability to, upon County request, provide any of the items requested below may result in disqualification of your response. These qualifications must be maintained during the term of any resultant Contract.

A. Must have the ability to do business in Orange County, California;

B. Complete all required Vendor Response questions of the solicitation;

C. Have minimum of ten (10) years of consecutive, recent experience in construction management.

D. Have the ability to provide all required 3rd party testing, inspections, and commissioning.

E. Firm to have similar size technologic project for at least three (3) public agencies.

1.6 EVALUATION PROCESS

Responses deemed to meet all minimum solicitation requirements will be scored based on the established evaluation criteria, and will be assigned points that measure the responsiveness to each identified criterion. The total number of points earned will be tallied for each response, based upon the Respondent(s) submitted written materials.

Responses shall be evaluated by an Evaluation Panel of job knowledge experts on the basis of the responsiveness to the requirements in this RFP. The County may request clarifications, or otherwise verify the contents of the response, including information about the Respondent, Contractors and sub-contractors.

The scoring is based on evaluation of the response as measured against the Scoring Criteria, which includes County of Orange Procurement Preference Policy, in accordance with Sections 1.8-103 and 4.3-112 of the 2026 County Contract Policy Manual (CPM). A copy of the 2026 CPM can be https://procurement.opengov.com/portal/ocgov https://procurement.opengov.com/portal/ocgov found at https://cpo.oc.gov/cpm. Responses will be evaluated from the most advantageous to the least advantageous to the County.

1.7 ADDITIONAL PUBLIC WORKS EVALUATION PROCESS AND CRITERIA

An evaluation panel will conduct evaluations of the Proposals submitted through the solicitation process. The committee will consider the information supplied and not supplied by Respondents.

If it finds a failure or deficiency in the Proposals or any information provided in connection thereto, the evaluation panel may reject said Proposal or information or reflect the failure or deficiency in the evaluation.

The County may request clarifications or otherwise verify the contents of the Proposal, including information about the Respondent, firms, and sub-consultants.

The evaluation panel will rank the Respondent’s Proposal and develop a shortlist of Respondents.

At the discretion of the evaluation panel and based on evaluation results and County needs, top-ranked Respondents may be invited for interviews.

1.8 SELECTION/AWARD PROCEDURES

Upon the completion of the evaluation process, the Evaluation Committee will make a recommendation for an award to the County’s DPA. Final award determination shall be subject to reference checks and past performance.

The Model Contract contained herein this RFP is the Contract proposed for execution. It may be modified to incorporate negotiated items and other pertinent terms and conditions set forth in this

RFP, including special conditions and requirements and those added by addendum, necessary attachments and/or exhibits, and to reflect Respondent’s response and qualifications. Any additional exceptions to the terms and conditions made by any Respondent after submission of its response may result in its elimination from further consideration.

Exceptions to the terms and conditions of the Model Contract or the statements regarding

Respondent’s inability to comply with any of the provisions thereof are to be declared in the response to the RFP in VENDOR RESPONSES - Statement of Compliance.

Negotiations may or may not be conducted with the finalist(s); therefore, the response submitted should contain Respondent(s) most favorable terms and conditions, since the selection and award may be made without further discussion or need for clarification. Any additional exceptions to the terms and conditions made by any Respondent(s) after submission of its response may result in elimination from further consideration.

The County will enter into negotiations with the selected Respondent and award a contract upon completion of negotiation of fees and contract terms. The award may be subject to/require approval(s) by the County Board of Supervisors.

If a satisfactory Contract cannot be negotiated in a timely manner, County, in its sole discretion, may terminate negotiations with the selected Respondent and begin negotiations with the next

Respondent.

https://cpo.oc.gov/cpm

1.9 RIGHTS RESERVED TO COUNTY

The County reserves the right to:

A. Make use of any information or ideas in the responses submitted.

B. Request response revisions and hold discussions and negotiations with any Respondent as necessary to serve the best interests of the County.

C. Seek publicly available information about the Respondents.

D. Conduct, or not to conduct, oral interviews and/or presentations with the highest-ranked

Respondent(s) and additional Respondents.

E. Waive, at its discretion, any procedural, non-material defects, irregularity, or informality, which

County deems correctable or otherwise not warranting rejection of the response that do not result in any unfair competitive advantage. Any waiver will not excuse a proponent from full compliance.

F. Verify and validate any information prior to Contract Award and during the entire term of the

Contract.

G. Negotiate the final Contract with any Respondent(s), including pricing/fee schedule, as necessary to serve the best interests of the County.

H. Withdraw or cancel in part or in its entirety this solicitation at any time without prior notice and furthermore makes no representations that any Contract will be awarded to any Respondent responding to this solicitation.

I. Award its total requirements to one Respondent or to apportion those requirements among two or more Respondents as the County may deem to be in its best interests.

J. Reject any response if it is conditional, incomplete or deviates significantly from the services requested in this solicitation.

K. Request Best and Final Offer from any Respondent determined to be within the competitive range.

Unless requested by the County, late Best and Final Offers will not be accepted by the County for any reason. In addition, negotiations may or may not be conducted with Respondents.

L. Make multiple awards to Respondent(s) for services requested in this solicitation, at its sole discretion, to serve the best interests of the County.

M. Defer award of this Contract for a period of 180 days after the solicitation opening. During this period, Respondent shall guarantee the prices and terms quoted in their responses. The County and the responsive, responsible Respondent may mutually agree in writing to extend this deferral period.

Therefore, responses submitted shall contain the Respondent’s most favorable terms and conditions, since the selection and award may be made without discussion with any Respondent.

1.10 CONTRACTOR SAFETY

Contractor shall comply with the County’s Safety and Loss Prevention Policy and Procedure#306

(“Contractor Safety Responsibilities”) and submit a copy of their Injury and Illness Prevention

Program (IIPP) and Contractor Safety-Activity Checklist to the County’s Project Manager prior to the start of any work performed under the Contract. Contractor will notify County Project Manager of any revisions to the Safety-Activity Checklist and will provide a new Safety-Activity Checklist upon County request. The IIPP shall comply with California Code of Regulations, Title 8, Section

1509 or 3203(whichever applies). Contractor shall submit other safety programs that pertain to the type of job that will be performed on site. County reserves the right to conduct inspections and audits as necessary for the purpose of evaluating any aspect of safety performance under this

Contract.

1.11 TITLE VI SOLICITATION NOTICE

The County of Orange, in accordance with the provisions of the Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 USC §§ 2000d to 2000d-4) and the Regulations, hereby notifies all

Respondents that it will affirmatively ensure that any contract entered into pursuant to this advertisement, will be afforded full and fair opportunity to submit response to this solicitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award.

1.12 DEPARTMENT OF THE TREASURY, INTERNAL REVENUE SERVICE FORM

W-9/W-8 REQUIREMENTS

Effective June 3, 2006, all Contractors, entering into a Contract with County, who are not already established in Countywide ERP System as an Auditor-Controller vendor, will be required to submit to County a federal Form W-9, or form W-8 for foreign vendors. County will inform

Contractor, at the time of award, if the Form W-9 or W-8 will be required.

In order to comply with this County requirement, within ten (10) days of notification of selection of award of Contract but prior to official award of Contract, the selected Contractor agrees to furnish to Contract administrator, or the Deputy Procurement Agent (DPA) the required W-9 or

W-8.

1.13 CAMPAIGN CONTRIBUTION DISCLOSURE REQUIREMENT

Effective January 1, 2023, all contractors entering into a contract with the County, will be required to submit the Campaign Contribution Disclosure Form for any contributions made on or after

January 1, 2023. In order to comply with this requirement, Respondent agrees to furnish the required Campaign Contribution Disclosure Information form as a required submittal with its response. Failure to include the form as required will render the response nonresponsive.

SECTION 2. PROTEST PROCEDURES

Any actual or prospective bidder or respondent who alleges an error or impropriety in the solicitation or award of a contract may submit a grievance or protest to Jennifer Mason at jennifer.mason@pw.oc.gov, as set forth herein.

PROTEST PROCEDURES

All protests shall be typed under the protestor’s letterhead and submitted in accordance with the provisions stated herein. All protests shall include at a minimum the following information:

A. The name, address, and telephone number of the protestor;

B. The signature of the protestor or the protestor’s representative;

C. The solicitation or contract number;

D. A detailed statement of the legal and/or factual grounds for the protest; and, E. The form of relief requested.

Protest of Solicitation Specifications:

A. All protests related to solicitation specifications must be submitted to the Deputy

Procurement Agent (DPA), Jennifer Mason at jennifer.mason@pw.oc.gov, no later than five (5) business days prior to the Closing Date of the solicitation. Protests received after the five (5) business-day deadline will not be considered by the County.

B. In the event the protest of specifications is denied, and the protestor wishes to continue in the solicitation process, the protestor must still submit a bid/response prior to the close of the solicitation in accordance with the solicitation submittal procedures provided in this solicitation.

Protest of Award of Contract:

A. Protests related to the award of a contract must be submitted to the Deputy Procurement

Agent, Jennifer Mason at jennifer.mason@pw.oc.gov, no later than five (5) business days after the Notice of Solicitation Ranking Results is provided by the DPA.

B. Protests relating to a proposed contract award received after the five (5) business day deadline will not be considered by the County.

C. If the five (5) business day period expires without the receipt of a protest, the department may move forward with the contract award or if necessary, file the item for approval by the Board of Supervisors.

Protest Process

A. In the event of a timely protest, the County shall not proceed with the solicitation or award of the contract until the DPA issues a decision on the protest.

B. Upon receipt of a timely protest, the DPA will, within ten (10) business days of receipt of the protest, issue a decision in writing which shall state the reasons for the actions taken.

C. The County may, after providing written justification, make the determination that an immediate award of the contract is necessary to protect the substantial interests of the

County. The award of a contract shall in no way compromise the protester’s right to the protest procedures outlined herein.

D. If the protestor disagrees with the decision of the DPA, the protestor may submit a written appeal to the County Procurement Officer requesting an appeal to the

Procurement Appeals Board, in accordance with the process stated below.

APPEALS PROCESS

A. If the protestor wishes to appeal the protest decision of the Deputy Procurement Agent, the protestor must submit, within three (3) business days from receipt of the Deputy

Procurement Agent’s decision, a written appeal to the Office of the County Procurement

Officer.

Written appeals must be sent by mail to the address below with a courtesy copy by email;

County of Orange/County Executive Office

County Procurement Office

400 W. Civic Center Drive, 5th Floor

Santa Ana, CA 92701

Attn: County Procurement Officer

CPOAppeals@ceo.oc.gov

B. Within fifteen (15) business days, the County Procurement Officer will review all materials in connection with the appeal, assess the merits of the protest and provide a written determination that shall contain his or her decision on whether the appeal shall be forwarded to the Procurement Appeals Board.

C. The decision of the County Procurement Officer on whether to allow the appeal to go forward will be final and there shall be no right to any administrative appeals of this decision.

SECTION 3. SCOPE OF WORK

3.1 GENERAL INFORMATION:

The County of Orange is comprised of 22 Departments and over 18,000 employees located throughout the County. The County’s core businesses are public safety, public works, construction management, public health, environmental protection, regional planning, public assistance, social services, and aviation.

3.2 SCOPE OF SERVICES:

Construction Management (CM) services define the Owner’s Representative work that shall oversee the facility design & construction based on the approved design and County requirements.

The CM shall also provide all third-party testing and inspections as well as commissioning required to verify compliance with codes, standards, and project specifications. This shall consist of the following:

1. The construction of the new parking structure, reconfiguration of the site.

mailto:CPOAppeals@ocgov.com

2. The expansion and renovation of the existing 1382 Bell Avenue building to accommodate essential EOC operations.

SECTION 4. OCLSB AND DVBE PREFERENCE POLICIES CERTIFICATION

REQUIREMENTS

County of Orange Local Small Business (OCLSB) Preference and Disabled Veteran

Business Enterprise (DVBE) Preference Policies Certification Requirements

4.1 OCLSB:

Effective January 1, 2020, County of Orange Board of Supervisors adopted the OCLSB Preference policy. Implementation of the OCLSB Preference policy supports local businesses, the local economy and the development of the County’s tax base.

To be certified as a Local Small Business by the County of Orange, a business shall meet (1) and

(2) below:

A. Local Business Requirements:

1. Maintains their principal center of operations (i.e. headquarters) within Orange

County, and:

2. Has:

a. A business address located in the County of Orange that is not a post office box, or

b. A valid business license or certificate of occupancy issued by the County of

Orange or by an Orange County city, or other documentation acceptable to the

County of Orange.

B. Small Business Requirements:

1. Must be certified as a Small Business by the State of California Department of

General Services (DGS): and, C. Above requirements must be valid at the time of proposal submittal through the time of award of the contract. The terms and conditions of the contract shall additionally require the contractor to remain in compliance with the Local Business requirements (pursuant to subsection (a) above) through the term of the contract, including any extensions or renewals, and shall provide that contractor’s failure to comply may be construed by County as a material breach of the contract.

4.2 DVBE:

Effective January 1, 2021, County of Orange Board of Supervisors adopted the DVBE Preference policy.

The DVBE Preference policy supports local business opportunity, economy and the development of

County’s tax base, and in addition recognizes the service and sacrifice given by the men and women of our

Armed Forces.

To be certified as a Disabled Veteran Business Enterprise by the County of Orange, a business shall meet

(A) and (B) below:

A. Must be certified as a DVBE by the State of California Department of General Services (DGS);

and, B. DGS DVBE requirements must be valid at the time of bid/proposal submittal through the time of award of the contract.

To participate as an OCLSB and/or DVBE please read and follow the process outlined in COUNTY OF

ORANGE LOCAL SMALL BUSINESS (OCLSB) AND DISABLED VETERAN BUSINESS

ENTERPRISE (DVBE) CERTIFICATION REQUIREMENTS in the VENDOR RESPONSES.

*NOTE: DVBE PREFERENCE IS NOT APPLICABLE TO PUBLIC WORKS OR A-E

CONSTRUCTION PROJECTS.

4.3 OCLSB/DVBE CERTIFICATION REQUIREMENTS:

County Of Orange Local Small Business (OCLSB) Preference And Disabled Veteran

Business Enterprise (DVBE) Certification Requirements

A. To participate as an OCLSB and/or DVBE the following requirements must be met:

1. Must be certified with State of California the Department of General Services (DGS) as a Small Business. - https://caleprocure.ca.gov/pages/sbdvbe-index.aspx

2. Must be certified with DGS as a DVBE. - https://caleprocure.ca.gov/pages/sbdvbe-index.aspx

3. Maintains their principal center of operations (i.e. headquarters) within Orange

County.

4. Certification must be valid at the date/time solicitation is closed, and it shall remain in effect at the time of contract award. County reserves the right to verify and/or reject incomplete documents.

5. Complete and sign the Affirmation form attached herein. The signed Affirmation form and the OCLSB Certification are required and must be returned with the solicitation response.

B. OCLSB or DVBE Preference provides for the following:

1. Invitation for Bid – IFB

A five percent (5%) deduction in the original bid price shall be applied to all confirmed OCLSB or DVBE bidders for evaluation purposes. If the lowest bidder is a certified OCLSB or DVBE bidder, the contract will be awarded at the certified https://caleprocure.ca.gov/pages/sbdvbe-index.aspx https://caleprocure.ca.gov/pages/sbdvbe-index.aspx https://caleprocure.ca.gov/pages/sbdvbe-index.aspx

OCLSB or DVBE’s original bid price. The maximum allowable preference deduction is $100,000.

2. Request for Proposal - RFP

a. No Cost - Any Request for Proposals that does not include cost as a scoring criteria shall instead apply the five percent (5%) or eight percent (8%) preference percentage pursuant to the eligibility requirements above to a scoring criteria in the RFP that makes up no more than twenty percent (20%) of the total RFP.

b. With Cost - An additional five percent (5%) shall be applied to the total cost of each certified OCLSB or DVBE to obtain their final score. If the final score of any OCLSB or DVBE matches the final score of a respondent who is not an

OCLSB or DVBE, preference shall be given to the certified OCLSB or DVBE. If two or more OCLSBs and/or DVBEs have the same final score, the County shall determine the contract award based on the County’s best interests.

Notwithstanding these preference procedures, the Orange County Board of

Supervisors reserves the right to award contracts in any other permissible manner in consideration of the County’s best interests.

C. Dual OCLSB and DVBE Preference provides for the following:

1. Business Certified as OCLSB and DVBE

If a State-certified OCLSB is also a State-certified DVBE, the preference given to that business shall be 8% instead of 5%.

D. Subcontractors

If bidder is submitting subcontractors to qualify for the OCLSB or DVBE preference, bidder must demonstrate through the Staffing Plan that 20% of the total bid amount is allocated to the OCLSB and/or DVBE subcontractor(s).

*NOTE: DVBE PREFERENCE IS NOT APPLICABLE TO PUBLIC WORKS OR A-E

CONSTRUCTION PROJECTS.

4.4 OCLSB PREFERENCE POLICY - CONSTRUCTION:

For solicitations awarded to the lowest responsive and responsible bidder, a preference of five percent (5%) of the lowest bid will be applied to certified bidders who request the preference pursuant to County policy.

This preference will be applied to all certified bidders who qualify, including the lowest responsive, responsible bidder. However, the awarded contract price will remain the bidder’s original bid price and not the adjusted price used for evaluation purposes.

Please note, the total preference applied under this program cannot exceed five percent (5%) of the lowest bid, with a maximum cap of $100,000.

Eligibility for Contractors Using OCLSB Subcontractors – Prime contractors that do not otherwise meet the OCLSB certification requirements may still qualify for OCLSB preferences by virtue of their use of OCLSB subcontractors. To qualify for the preferences by using certified OCLSB subcontractor(s), twenty percent (20%) of the total proposed contract amount must be allocated to

OCLSB subcontractors identified in the List of Subcontractors.

4.5 OCLSB AND DVBE SUBCONTRACTOR REQUIREMENT - CONSTRUCTION:

This project is estimated to exceed five million dollars ($5,000,000). As a result, at least 3% of the total contract value must be subcontracted to an Orange County Local Small Business (OCLSB) or Disabled Veteran Business Enterprise (DVBE). Under the Public Contract Code, no DVBE preference can be applied to Public Works projects.

The Bid may be declared non-responsive if the Bidder fails to include at least 3% of the total contract value subcontracted to certified OCLSB or DVBE subcontractors.

4.6 OCLSB SUBCONTRACTOR PARTICIPATION - CONSTRUCTION

For the purpose of satisfying subcontracting participation requirements and/or being eligible for the preference, only 1st-tier OCLSB subcontractors will be recognized as participants in the

Contract according to the following criteria:

A. For credit to be allowed toward a respective participation level, all listed OCLSB firms shall have been certified by the Bid due date.

B. The Subcontractor shall perform a commercially useful function for credit to be allowed toward subcontractor participation levels. The Subcontractor shall be required by you to be responsible for the execution of a distinct element of the Work and shall carry out its responsibility by actually performing and supervising its own workforce.

C. If the Bidder is seeking the recognition of materials, supplies, or both towards achieving any mandatory subcontracting participation level, the Bidder shall indicate on the

Subcontractor List with the Bid the following:

1. If the materials or supplies are obtained from a OCLSB manufacturer, the Bidder will receive 100% of the cost of the materials or supplies toward OCLSB participation.

For the purposes of counting OCLSB participation, a manufacturer is a firm that operates or maintains a factory or establishment that produces, on the premises, the materials, supplies, articles, or equipment required under the Contract and of the general character described by the specifications.

2. If the materials or supplies are obtained from a OCLSB supplier, the Bidder will receive 60% of the cost of the materials or supplies toward OCLSB participation. For the purposes of counting OCLSB participation a Supplier is a firm that owns, operates, or maintains a store, warehouse, or other establishment in which the materials, supplies, articles or equipment of the general character described by the specifications and required under the Contract are bought, kept in stock, and regularly sold or leased to the public in the usual course of business. To be a supplier, the firm shall be an established, regular business that engages, as its principal business and under its own name, in the purchase and sale or lease of the products in question. A person may be a supplier in such bulk items as petroleum products, steel, cement, gravel, stone, or asphalt without owning, operating, or maintaining a place of business if the person both owns and operates distribution equipment for the products. Any supplementing of the suppliers’ own distribution equipment shall be by a long-term lease agreement and shall not be on an ad hoc or contract-by-contract basis.

3. If the materials or supplies are obtained from an OCLSB, which is neither a manufacturer nor a supplier, the entire amount of fees or commissions charged for assistance in the procurement of the materials and supplies, fees or transportation charges for the delivery of materials or supplies required on a job site will be counted toward OCLSB participation, provided the fees are reasonable and not excessive as compared with fees customarily allowed for similar services. No portion of the cost of the materials and supplies themselves will be counted toward OCLSB participation.

D. If the Bidder is seeking the recognition of OCLSB Trucking towards achieving any mandatory subcontracting participation level, the Bidder shall indicate it on the List of

Subcontractors with the Bid. The following factors will be evaluated in determining the credit to be allowed toward the respective participation level:

1. The OCLSB shall be responsible for the management and supervision of the entire trucking operation for which it is getting credit on a particular Contract and there shall not be a contrived arrangement for the purpose of counting OCLSB participation.

2. The OCLSB shall itself own and operate at least 1 fully licensed, insured, and operational truck used on the Contract.

3. The OCLSB receives credit for the total value of the transportation services it provides on the Contract using trucks it owns, insures, and operates using drivers it employs.

4. The OCLSB may lease trucks from another OCLSB firm including an owner-operator who is certified as an OCLSB. The OCLSB who leases trucks from another OCLSB receives credit for the total value of the transportation services the lessee OCLSB provides on the contract.

5. The OCLSB may also lease trucks from a non-OCLSB firm, including an owner-operator. The OCLSB who leases trucks from a non-OCLSB is entitled to credit for the total value of transportation services provided by non-OCLSB lessees not to exceed the value of transportation services provided by OCLSB owned trucks on the contract.

Additional participation by non-OCLSB lessees receive credit only for the fee or commission it receives as a result of the lease arrangement.

6. A lease shall indicate that the OCLSB has exclusive use of and control over the truck.

This does not preclude the leased truck from working for others during the term of the lease with the consent of the OCLSB so long as the lease gives the OCLSB absolute priority for use of the leased truck.

4.7 OCLSB SUBCONTRACTOR PARTICIPATION PERCENTAGE -

CONSTRUCTION

A. The Bidder must achieve the mandatory Subcontractor participation requirement.

B. The Bidders shall indicate the participation on the List of Subcontractors regardless of the dollar value.

C. An OCLSB Bidder may count its own participation toward achieving the subcontracting requirement as long as the OCLSB Bidder performs at least 51% of the Contract Price.

4.8 OCLSB MAINTAINING PARTICIPATION LEVELS - CONSTRUCTION

A. Credit and preference points are earned based on the level of participation proposed prior to the award of the Contract. Once the Project begins, Contractor shall achieve and maintain the OCLSB and/or DVBE participation levels for which credit and preference points were earned. Contractor shall maintain the OCLSB and/or DVBE percentages indicated at the Contract Award and throughout the Contract Time.

B. If the County modifies the original Scope of Work, the Contractor shall make reasonable efforts to maintain the OCLSB and/or DVBE participation for which creditor preference points were earned. If participation levels will be reduced, written approval shall be received from the County prior to making changes.

C. The Contractor shall notify and obtain written approval from the County in advance of any reduction in subcontract scope, termination, or substitution for a designated OCLSB and/or

DVBE Subcontractor. Failure to do so shall constitute a material breach of the Contract.

4.9 OCLSB SUBCONTRACTOR AND SUPPLIER SUBSTITUTIONS -

CONSTRUCTION

Listed Subcontractors and Suppliers shall not be substituted without the written authorization of the County or its duly authorized agent.

Request for Subcontractor or Supplier substitution shall be made in writing to:

County of Orange

Attn: Contact Full Name, Title

Contact Address

Email: Contact Email Address

The request shall include a thorough explanation of the reason(s) for the substitution, including dollar amounts and a letter from each substituted Subcontractor or Supplier stating that they (the

Subcontractors or Suppliers) release all interest in working on the Project and written confirmation from the new Subcontractor or Supplier stating that they agree to work on the Project along with the dollar value of the Work to be performed.

Written approval of the substitution request shall be received from the County or its authorized officer prior to any unlisted Subcontractor or Supplier performing Work on the Project.

Substitution of Subcontractors and Suppliers without authorization shall subject you to those penalties set forth in Public Contract Code §4110.

Requests for Supplier substitution shall be made in writing at least ten (10) Days prior to the provision of materials, supplies, or services by the proposed Supplier and shall include proof of written notice to the originally listed Supplier of the proposed substitution.

A Contractor whose Bid is accepted shall not:

A. Substitute a person as Subcontractor or Supplier in place of the Subcontractor or Supplier listed in the original bid, except that the County, or it’s duly authorized officer, may consent to the substitution of another person as a Subcontractor or Supplier in any of the following situations:

1. When the Subcontractor or Supplier listed in the Bid, after having a reasonable opportunity to do so, fails or refuses to execute a written Contract for the scope of work specified in the subcontractor’s bid and at the price specified in the subcontractor’s bid, when that written contract, based upon the general terms, conditions, plans, and specifications for the project involved or the terms of the subcontractor’s written bid, is presented to the subcontractor by the prime contractor.

2. When the listed Subcontractor or Supplier becomes insolvent or the subject of an order for relief in bankruptcy.

3. When the listed Subcontractor or Supplier fails or refuses to perform his or her subcontract.

4. When the listed Subcontractor fails or refuses to meet bond requirements as set forth in Public Contract Code §4108.

5. When you demonstrate to the County or it’s duly authorized officer, subject to the provisions set forth in Public Contract Code §4107.5, that the name of the

Subcontractor was listed as the result of an inadvertent clerical error.

6. When the listed Subcontractor is not licensed pursuant to Contractor License Law.

7. When the County, or it’s duly authorized officer, determines that the Work performed by the listed Subcontractor or that the materials or supplies provided by the listed

Supplier are substantially unsatisfactory and not in substantial accordance with the

Plans and specifications or that the Subcontractor or Supplier is substantially delaying or disrupting the progress of the Work.

8. When the listed Subcontractor is ineligible to work on a public works project pursuant to §§1777.1 or 1777.7 of the Labor Code.

9. When the County or its duly authorized agent determines that the listed Subcontractor is not a responsible contractor.

B. Permit a Contract to be voluntarily assigned or transferred or allow it to be performed by anyone other than the original Subcontractor, Supplier listed in the original Bid without the consent of the County, or it’s duly authorized officer.

C. Other than in the performance of “Change Orders” causing changes or deviations from the

Contract, sublet or subcontract any portion of the Work, or contract for materials or supplies in excess of 0.5% of your total bid or $10,000, whichever is greater, as to which his or her original Bid did not designate a Subcontractor or Supplier.

SECTION 5. SCORING CRITERIA

Phase 1 - Written Response Scoring: 500 points maximum

Phase 2 - Presentation/Interview Scoring: 500 points maximum

5.1 PHASE 1

No. Evaluation Criteria Scoring Method Weight (Points)

1. Firm’s Background, Qualifications &

Experience

A. Company Background and Data

1. Include an overview of firm and brief description of the firm’s history including:

a. Length of time in business;

b. Services provided relevant to the RFP;

c. Describe the Respondent’s experience in performing work of a similar nature to that solicited in this RFP;

and

d. List certifications and/or affiliations that may be relevant to this RFP.

2. Provide the following information:

a. Name and title of person(s) authorized to bind the

Respondent;

b. Main office address; and

c. Telephone number

3. List any previous or current contracts with the County of

Orange within the last five (5) years. Include:

a. Agency/Department name, address and contact person;

b. Contract Number; and

c. Contract Amount

4. Provide a general description of the firm’s prime contractor (if applicable, subcontractor’s) financial condition and identify any conditions (e.g., bankruptcy, pending litigation, planned office closures, or impending

Points Based 175 (35% of Total) merger) that may impede

Respondent’s ability to complete the services.

B. Experience

1. Descriptions of at least three (3) recent similar projects that the firm has completed (public sector experience preferred).

a. Include project name, date, and location,

b. Include client name and describe the scope of work,

c. Describe any obstacles encountered and project outcome, and

d. Describe, including experience with successfully coordinating and maintaining project schedules while staying on budget.

2. Describe experience developing strategic plans for local governments and knowledge of real estate development including permitting, financing, design, construction, land-use, and environmental planning.

3. Describe experience conducting departmental needs assessment studies for office space planning, parking, etc.

4. Describe experience with infrastructure planning.

5. Describe comprehensive capabilities in public outreach and engagement.

6. Provide a description of

Respondent’s success in facilitating working sessions and distilling meeting content and feedback into thematic areas for recommendations.

7. Provide examples of creating executive-level visual collateral, such as reports and graphics.

8. Describe additional relevant information concerning the services offered in this RFP that it considers important in evaluating its services.

2. Key Personnel/Proposed Staffing

A. Assigned personnel must have a minimum of five (5) years of expertise and experience with emphasis on the public sector with depth and breadth of services available.

B. Describe the Respondent’s team that is being proposed for the project which includes completing the Key

Personnel/Staffing Plan located in the

Vendor Responses section. Provide a brief background of each team member’s experience and the roles and responsibilities they will play in the project.

C. Team…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .