Concept_Plans.pdf

PDF 15 MB Posted

Attached to
HSIP Industrial Parkway / Ruus Road Intersection Improvements and Bicycle Set Aside Project
Solicitation number
26-058
Issued by
Alameda County, California

About this file

This is a concept plan document for the City of Hayward's HSIP Industrial Parkway / Ruus Road Intersection Improvements and Bicycle Set Aside Project, which outlines proposed infrastructure improvements at multiple locations within Hayward, California. The project involves the installation of bike lanes, modifications to traffic control systems, and pedestrian safety enhancements across three distinct areas: Jackson Street and Amador Street, Jackson Street and Soto Road, and Ruus Road/Industrial Parkway West. Key improvements include installation of R33PB bike lanes, removal of a second left turn lane at one location, removal of left turn lanes to accommodate bike lanes, crosswalk straightening and high-visibility markings, painted bulb-outs, and striping modifications. All work is to occur within existing City of Hayward right-of-way. Proposals must be submitted through the City's eProcurement Portal by 4:30 pm on Tuesday, August 11, 2026. The Transportation Department is located at 777 B Street, Hayward, CA 94541-5114, and late submissions will not be accepted.

The project includes a bicycle set-aside component, indicating that a portion of the work is reserved for contractors meeting specific criteria. The concept plans are in draft status with design elements subject to finalization at the 30% design phase, including the determination of additional signal equipment locations. The project appears to be funded through Highway Safety Improvement Program (HSIP) sources, a federal funding mechanism for roadway safety projects.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

© 2024 M icrosoft C orporatio n ©

2024 M axar ©

CNES (2

024) D istr ibutio n Airb us D

S

JA

C

K S O

N

S T R

E E T

N

Amador St - Proposed

25'

00 60' 120'

PAINTED BULB-OUT

TO BE INSTALLED PRIOR

STRAIGHTEN CROSSWALK

AND MAKE HIGH-VIS

(OTHER SAFETY)

AMADOR ST

AMADOR ST

8' 6' 10'

ALL WORK TO OCCUR WITHIN EXISTING CITY OF HAYWARD ROW

NARROW NB LANE

FOR BIKE LANE

NINSTALL BIKE LANE (R33PB)

N

Soto Rd Proposed Conditions

J A

C K

S O

N S

T

SOTO RD

CONFORM TO EXISTING

BIKE LANE

CONFORM TO

EXISTING BIKE LANE

00 60' 120'

ALL WORK TO OCCUR WITHIN EXISTING CITY OF HAYWARD ROW

INSTALL BIKE LANE (R33PB)

REMOVE SECOND LEFT TURN LANE

TO INSTALL BIKE LANE

In du st ria l P kw y W

Ruus Rd

N

Ruus Rd/Industrial Pkwy West Protected Intersection Concept Design (DRAFT)

ALL WORK TO OCCUR WITHIN EXISTING CITY OF HAYWARD ROW

CONFORM TO EXISTING STRIPING

NEW SIGNAL EQUIPMENT

Lucas.Woodward Callout

STAMPED CONCRETE ISLAND (TYP.)

Lucas.Woodward Callout

STRIPING MODIFICATIONS WITHIN INTERSECTION

Lucas.Woodward Callout

LOCATIONS FOR OTHER SIGNAL EQUIPMENT TO BE DETERMINED AT 30% DESIGN

File details come from the government source that posted it. Updated .