Complete Price List Updated 6.13.24 Final renewal UPLOAD TO VENDORNET.xlsx
XLSX spreadsheet 26 KB Posted
- Attached to
- **EXPIRED** Elevator Maintenance Repair Services
- Contract number
- 410014-M20-CKS7692-RFB-00
- Issued by
- Wisconsin
About this file
This document is a comprehensive price list for elevator maintenance and repair services under Wisconsin Department of Corrections (DOC) Contract Number 410014-M20-CKS7692-RFB, effective July 1, 2024 through June 30, 2025. The contract involves three primary vendors: KONE Inc. (based in Cudahy, Wisconsin), MEI-Badger Elevator (based in Menomonee Falls, Wisconsin), and Schumacher Elevator (based in Denver, Iowa). These contractors provide services across multiple Wisconsin correctional facilities including various correctional institutions, treatment facilities, and youth schools throughout the state.
The contract establishes standardized hourly rates and monthly maintenance charges across different facility types. KONE services eleven facilities with regular hourly rates of $258.66, overtime rates of $387.28, and monthly maintenance charges ranging from $109.27 to $2,376.45 depending on the facility. MEI-Badger Elevator serves six facilities at $249.00 regular hourly rates and $392.00 overtime rates, with monthly charges from $100.17 to $2,094.74. Schumacher Elevator maintains one facility (Prairie du Chien Correctional Institution) at $229.00 regular rate and $389.30 overtime rate with a $851.91 monthly charge. The contract includes specific overtime rate structures with time-and-a-half for scheduled weekend work, time-and-seven for callbacks, and double-time for Sunday work. Monthly charges encompass testing, insurance, and liability coverage, and the document indicates a 3% rate increase has been applied. The original five-year contract runs from July 1, 2022 to June 30, 2025, with a total contract value of approximately $335,472.98 including amendments for additional elevator installations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Schumacher Elevator Company DOC Signed Contract.pdf | ||
| MEI Badger DOC Signed Contract.pdf | ||
| 7692 Attachment A-Facility Elevator List and Service Hours.xlsx | XLSX spreadsheet | |
| Dept of Corrections contract fully executed with KONE.pdf | ||
| 7692 Updated Quick Start User Guide Elevator Maintenance and Repair 6.13.24.docx | DOCX document | |
| 7692 Elevator Maintenance RFB.doc | DOC document | |
| Complete Price List 7.1.2023 UPLOAD TO VENDORNET with Kone OT.xlsx | XLSX spreadsheet | |
| Contract Announcement.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
July 1 2023 pricing
| Effective 7/1/2024 - 6/30/25 | Updated 6/13/24 Final renewal | |||||||
| Facility | Regular Hourly Rate | Overtime Hourly Rate | Monthly Maintenance Charge* | Vendor Contact Information | **KONE Overtime and Holiday Rates** | |||
| KONE Inc. services the following facilities: | Time and One Half | Time and Seven | Double Time | |||||
| Chippewa Valley Correctional Treatment Facility (CVCTF) | $ 258.66 | $ 387.28 | $785.97 | KONE | $387.28 | $475.11 | $544.57 | |
| Columbia Correction Institution (CCI) | $ 258.66 | $ 387.28 | $687.24 | 5801 S Pennsylvania Ave #300 | ||||
| Copper Lake/Lincoln Hills School (CLS/LHS) | $ 258.66 | $ 387.28 | $345.51 | Cudahy WI, 53110 | ||||
| Dodge Correctional Institution (DCI) | $ 258.66 | $ 387.28 | $799.06 | Contact: Wendy Kittredge | Time and One-Half = Scheduled Weekday and Saturday overtime maintenance | |||
| Drug Abuse Correctional Center (DACC) | $ 258.66 | $ 387.28 | $233.73 | Main Phone: 262-373-0460 | Time and Seven = Weekday and Saturday overtime callbacks and unscheduled overtime maintenance | |||
| Ethan Allen School (EAS) | $ 258.66 | $ 387.28 | $565.70 | Cell Phone: 262-716-9275 | Double Time = Overtime repairs and Sunday overtime call backs | |||
| Fox Lake Correctional Institution (FLCI) | $ 258.66 | $ 387.28 | $766.15 | Email: wendy.kittredge@kone.com | ||||
| Green Bay Correctional Institution (GBCI) | $ 258.66 | $ 387.28 | $243.39 | DOC Contract Number: 410014-M20-CKS7692-RFB-01 | ||||
| Oakhill Correctional Institution (MWCC) | $ 258.66 | $ 387.28 | $1,035.35 | |||||
| Waupun Correctional Institution (WCI) | $ 258.66 | $ 387.28 | $2,376.45 | |||||
| Winnebago Correctional Center (WCC) | $ 258.66 | $ 387.28 | $109.27 |
| Facility | Regular Hourly Rate | Overtime Hourly Rate | Monthly Maintenance Charge | Vendor Contact Information |
| MEI - Badger Elevator services the following facilities: | ||||
| Milwaukee Secure Detention Facility (MSDF) | $ 249.00 | $ 392.00 | $ 2,094.74 | MEI - Badger Elevator |
| Milwaukee Women Correction Center (MWCC) | $ 249.00 | $ 392.00 | $ 100.17 | N50 W13740 Overview Drive Suite C |
| Racine Correctional Institution (RCI) | $ 249.00 | $ 392.00 | $ 1,077.41 | Menomonee Falls WI, 53051 |
| Racine Youthful Offender Correctional Facility (RYOCF) | $ 249.00 | $ 392.00 | $ 461.10 | Contact: Johns Friedrichs |
| Robert E. Ellsworth Correctional Center (REEC) | $ 249.00 | $ 392.00 | $ 628.13 | Phone: 262-752-6987 |
| Taycheedah Correctional Institution (TCI) | $ 249.00 | $ 392.00 | $ 1,179.07 | Email: john.friedrichs@meiusa.com |
| DOC Contract Number: 410014-M20-CKS7692-RFB-02 |
| Facility | Regular Hourly Rate | Overtime Hourly Rate | Monthly Maintenance Charge | Vendor Contact Information |
| Schumacher Elevator services the following facilities: | ||||
| Prairie du Chien Correctional Institution (PDCI) | $ 229.00 | $ 389.30 | $ 851.91 | Schumacher Elevator |
| One Schumacher Way, P.O. Box 393 | ||||
| Denver, IA 50622 | ||||
| Contact: Ted Duffy | ||||
| Phone: 319-984-5676 | ||||
| Email: ted.duffy@schumacherelevator.com | ||||
| DOC Contract Number: 410014-M20-CKS7692-RFB-03 | ||||
| *Monthly Charges include testing, Insurance, Liability etc. Includes a 3% incresase | ||||
| If your facility does not appear on this list, please contact the DOC elevator maintenance and repair contract manager for information. |
Abstract - CKS 7692 RFB
Addnd4 Calc for annual $ OCI
| 7692 Elevator Maintenance contract with added OCI elevator calculation | |||||||
| 7692 | 7/1/23 Kone added monthly $ amount for new elevator at OCI | annual X 12 | remainder of contract (2yrs) | Original contract $ (from JJ amendment #1 in DocuSign internal routing) | Annual per year /5 year contract | annual with new elevator added | Total contract with added elevator. |
| $ 225.00 | $ 2,700.00 | $ 5,400.00 | $ 330,072.98 | $ 66,014.60 | $ 68,714.60 | $ 335,472.98 |
| 7/1/2023 Used for Addendum #4 added elevator to Oak Hill Institute |
| contract terms 5 years 7/1/2022 to 6/30/2025 |
File details come from the government source that posted it. Updated .