This document is a combined project specification and bid notice issued by the Pennsylvania Game Commission (PGC) for construction of a new access road to State Game Lands #042 located in Upper Yoder Township, Cambria County, Pennsylvania. The project scope includes construction of a new access road with a tar and chip wearing course (asphalt seal coat treatment), removal and installation of highway guiderail, removal of existing culvert pipes, grading and embankment work, and seeding of disturbed areas. The work encompasses foreign borrow excavation, placement of aggregate base and subbase layers, installation of a STOP sign, and erosion and sedimentation control measures. Electronic bids were to be opened on February 26, 2026, at 2:00 PM at the PGC's Division of Contracts and Procurement in Harrisburg. The contract term commences upon delivery of the purchase order and terminates on June 30, 2026, with all work required to be completed and accepted by that date. Site visits are encouraged, with prospective bidders directed to contact Travis Anderson (Southwest Region Group #4 Land Manager Group Supervisor) at 814-241-9966 or Joe Mullen (Game Lands Maintenance Supervisor) at 724-235-2050 for site access arrangements. Questions regarding specifications should be directed to Zachary Whitenight, PGC Civil Engineer, at 717-787-4250 Ext. 73626 or zwhitenigh@pa.gov.
Bidders are required to submit invoices to Zachary Whitenight at 2001 Elmerton Avenue, Harrisburg, PA 17110, with monthly payments made upon satisfactory completion of work items and inspection approval by PGC representatives. Pennsylvania prevailing wage requirements apply to all workers on the project, with detailed wage schedules provided for multiple trade classifications effective through June 2027. The contractor must provide performance and payment bonds equal to 100 percent of the contract amount within 10 days of award, obtained from U.S. Treasury-listed surety companies. Insurance requirements include worker's compensation coverage and public liability and property damage insurance with minimum coverage of $250,000 per person and $1,000,000 per occurrence for bodily injury and property damage. Additional compliance requirements include submission of weekly certified payrolls (notarized initially and finally), completion of the Reciprocal Limitations Act form (GSPUR89), Worker Protection and Investment Certification, Public Works Employment Verification Form confirming E-Verify enrollment, and verification that bidders are not listed on the Pennsylvania Treasury's Russia and Belarus Act 57 restricted persons list. All work must comply with prevailing wage determinations, OSHA regulations, Pennsylvania Department of Environmental Protection Chapter 102 erosion control standards, and a Pennsylvania Department of Transportation Highway Occupancy Permit (No. 09033411) issued April 21, 2025, expiring October 21, 2025. The contract is classified as Heavy/Highway construction, with measurement and payment for most work items specified as lump sum compensation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ReciprocalLimitationsAct (materials bid).pdf | ||
| Worker Protection Form .docx | DOCX document | |
| SGL042_New Access Road.pdf | ||
| Bid Notice-SGL-042.doc | DOC document | |
| Terms and Conditions.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SGL #042 New Access Road Contract No. PGC-042-25-01
PENNSYLVANIA GAME COMMISSION
STATE GAME LANDS #042
NEW ACCESS ROAD
UPPER YODER Township, CAMBRIA County
Table of Contents
Bid Notice
Terms and Conditions
Specifications
PA Prevailing Wages
Reciprocal Limitations Act
Workers Protection & Investment Cert
Russia and Belarus Act-57 2023
Highway Occupancy Permit
Public Works Employment Verification Form
Technical Specifications
Project Drawings
(Provided Separately with Solicitation)
(Provided Separately with Solicitation)
4 Pages
6 Pages (Determination No. 26-01013)
4 Pages
1 Page
3 Pages
2 Pages
1 Page
19 Pages
13 Drawings
Contract No. PGC-042-24-01
PROJECT SPECIFICATIONS
The Contractor shall comply with the Contract Terms and Conditions provided with the Bid Documents including but not limited to the following:
INSURANCE REQUIREMENTS – In accordance with the Contract Terms and Conditions, the Contractor is required to have in place during the term of the Contract and any renewals or extensions thereof, the following types of insurance, issued by companies acceptable to the Commonwealth and authorized to conduct such business under the laws of the Commonwealth of Pennsylvania:
A. Worker's Compensation Insurance for all of the Contractor's employees and those of any subcontractor, engaged in Work at the site of the project as required by law.
B. Public Liability and Property Damage Insurance to protect the Commonwealth, the Contractor, and any and all subcontractors from claims for damages for personal injury (including bodily injury), sickness or disease, accidental death and damage to property including the loss of use resulting from any property damage, which may arise from the activities performed under the Contract or the failure to perform under the Contract, whether such performance or non-performance be by the Contractor, by any subcontractor, or by anyone directly or indirectly employed by either. The minimum amounts of coverage shall be $250,000 per person and $1,000,000 per occurrence for bodily injury, including death, and $250,000 per person and $1,000,000 per occurrence for property damage. Such policies shall be occurrence rather than claims-made policies and shall not contain any endorsements or any other form designated to limit and restrict any action by the Commonwealth, as an additional insured, against the insurance coverage in regard to Work performed for the Commonwealth.
Prior to commencement of the Work under the Contract and at each insurance renewal date during the term of the Contract, the Contractor shall provide the Commonwealth with current certificates of insurance. These certificates or policies shall name the Commonwealth AND Pennsylvania Game Commission as additional insured and shall contain a provision that the coverage's afforded under the policies will not be cancelled or changed until at least thirty (30) days written notice has been given to the Commonwealth.
COMPLIANCE WITH LAW – The Contractor shall comply with all applicable federal and state laws and regulations and local ordinances in the performance of the Contract.
WORKMANSHIP - All Work shall be performed in a Workmanlike manner and all materials and labor shall be in strict and entire conformity with the Drawings and Specifications.
INSPECTION AND CHANGES - All Work is subject to inspection and acceptance by the Pennsylvania Game Commission. Any Work rejected as defective or unsuitable shall be removed and replaced with suitable Work and materials at the sole cost of the Contractor to the complete satisfaction of the Game Commission.
Changes shall be in accordance with the Contract Terms and Conditions.
TEMPORARY SERVICES AND JOB CONDITIONS - The Contractor shall be responsible for providing any and all temporary facilities necessary to execute and protect the Work. The Contractor shall accept all conditions as found upon examination of the site and shall coordinate, plan, and execute the Work accordingly. The Contractor shall cooperate in the arrangements of the Work as necessary to least affect the administration or operations of existing buildings, facilities, and infrastructure. The Contractor shall keep the Work site clean at all times.
PREVAILING WAGE – Prevailing minimum wages apply to this project. See Contract Terms and Conditions and attached Prevailing Wage Determination.
The Contractor and each Subcontractor shall file a statement each week and a final statement at the conclusion of the Work on the contract with the contracting agency, under oath, and in form satisfactory to the Secretary, certifying that workmen have been paid wages in strict conformity with the provisions of the contract as prescribed by this section or if wages remain unpaid to set forth the amount of wages due and owing to each workman respectively. The PA Labor and Industry “Weekly Payroll Certification for Public Works Projects” form shall be used. The initial and final Payroll Certifications shall be notarized.
PAYMENT TERMS - A schedule of values is provided with the bid. Payment will be made on a monthly basis upon satisfactory completion of items listed on the Schedule of Values and in accordance with the Contract Terms and Conditions.
All payments due to the Contractor shall be processed after all Work has been inspected and approved by an agent of the Pennsylvania Game Commission. Payment will not be made for Work that is not progressing satisfactorily or for unsuitable or defective Work.
Payments may be withheld for failure to provide required documentation for the project including but not limited to required submittals / shop drawings and weekly submission of Certified Payrolls.
INVOICING – All Project invoices shall be submitted directly to:
Zachary Whitenight, Civil Engineer Pennsylvania Game Commission 2001 Elmerton Ave Harrisburg PA 17110 Office: 717-787-4250 Ext 73628 Email: zwhitenigh@pa.gov
All invoices must be submitted in black and white with no color and shaded areas. Invoices must include the Purchase Order Number, Contractor’s SAP Vendor Number, and the Contractor’s name and address as listed on the Purchase Order. Payment items on invoices shall match the items on the Purchase Order. Failure to submit invoices that meet these requirements will result in a delay of payment.
Please Note: Vendors are reminded to NOT include employer identification numbers, Social Security Numbers, bank account information, or other personally identifiable information on their invoices. That information is uniquely tied to your SAP Vendor Number and, for security purposes, should not be explicitly stated on an invoice.
CONTRACT TERM - The Contract shall commence upon delivery of Purchase Order to Contractor and shall terminate on June 30, 2026. Contract time is of the essence of the Project.
All Work must be completed and accepted by this date.
EXCISE TAXES, PENNSYLVANIA SALES TAX - The Commonwealth is exempt from all Excise Taxes. See Contract Terms and Conditions.
OFFSET PROVISION - The Contractor agrees that the Commonwealth may set off the amount of any state liability or other debt of the Contractor or its subsidiaries that is owed to the Commonwealth and not being contested on appeal against any payments due the Contractor under this or any other contract with the Commonwealth.
PERFORMANCE SECURITY / CONTRACT BONDS – Within 10 days after award of the purchase order, the Bidder to whom the Contract is awarded, shall provide Contract Performance Security and a Payment Bond in a form acceptable to the Commonwealth for the amounts listed below and in accordance with the Contract Terms and Conditions.
A Performance Bond at one hundred percent (100%) of the contract amount, conditioned upon the faithful performance of the contract in accordance with the plans, specifications and conditions of the contract.
A Payment Bond in an amount equal to one hundred percent (100%) of the contract amount.
Performance and Payment Bonds shall be executed by a surety company authorized to do business in the Commonwealth and listed on the current U.S. Dept. of Treasury, Bureau of Fiscal Service, Department Circular 570 (https://fiscal.treasury.gov/surety-bonds/list-certified-companies.html). Bonds shall include a current Power of Attorney dated the same as the date of the bond. Bonds shall be made payable to the Commonwealth.
GUARANTY / WARRANTY – See Contract Terms and Conditions – all items are warranted for a period of one year following delivery by the Contractor and acceptance by the Commonwealth.
HOLD HARMLESS PROVISION - See Contract Terms and Conditions - The Contractor shall hold the Commonwealth harmless from and indemnify the Commonwealth against any and all third party claims, demands and actions based upon or arising out of any activities performed by the Contractor and its employees and agents under this Contract, provided the Commonwealth gives Contractor prompt notice of any such claim of which it learns.
CONTRACT TERM - The Contract shall commence upon delivery of Purchase Order to Contractor and shall terminate on June 30, 2026. Contract time is of the essence of the Project.
All Work must be completed and accepted by this date.
EXCISE TAXES, PENNSYLVANIA SALES TAX - The Commonwealth is exempt from all Excise Taxes. See Contract Terms and Conditions.
ADDITIONAL PROVISIONS -
Contractor shall comply with the conditions listed below in accordance with the Contract Terms and Conditions:
1. Steel Products Procurement Act
2. Prohibition Against the Use of Certain Steel and Aluminum Products (Trade Practices Act)
3. Reciprocal Limitations Act - The form GSPUR89 (Reciprocal Limitations Act Requirements) is attached. The Contractor shall complete the applicable portions of pages 3 and 4 of the form and submit the completed pages within two days after the bid opening.
4. Restrictions for Associations with Russia and Belarus Act 57 of 2023 – PA General Assembly.
5. Worker Protection and Investment Certification Form - The form is attached.
The Contractor shall complete the certification on the bottom of the form and submit it within two days after the bid opening.
6. Public Works Employment Verification Form - The form is attached. The Contractor shall complete the form and submit it within two days after the bid opening.
Project Name: SGL 042 New Access Road
General Description: Installation of new access road for SGL 042. Project to include highway guiderail work, embankment fill, roadway grading and culvert pipe removal.
Project Locality Upper Yodder Township
Awarding Agency: Pennsylvania Game Commission
Contract Award Date: 2/26/2026
Serial Number: 26-01013
Project Classification: Heavy/Highway
Determination Date: 2/3/2026
Assigned Field Office: Altoona
Field Office Phone Number: (814)940-6224
Toll Free Phone Number:
Project County: Cambria County
BUREAU OF LABOR LAW COMPLIANCE
PREVAILING WAGES PROJECT RATES
Commonwealth of Pennsylvania Department of Labor & Industry Report Date: 2/3/2026 Page 1 of 66
Project: 26-01013 - Building Effective Date
Expiration Date
Hourly Rate Fringe Benefits
Total
Asbestos & Insulation Workers 8/1/2024 $41.55 $29.51 $71.06
Boilermakers 6/1/2016 $40.90 $27.61 $68.51
Bricklayer 6/1/2025 $38.65 $23.52 $62.17
Bricklayer 12/1/2025 $39.15 $24.02 $63.17
Bricklayers, Stone Masons, Pointers, Caulkers, Cleaners
4/28/2024 $36.91 $21.52 $58.43
Bricklayers, Stone Masons, Pointers, Caulkers, Cleaners
5/4/2025 $38.76 $21.52 $60.28
Carpenters - Piledriver/Welder 1/1/2024 $42.13 $21.97 $64.10
Carpenters - Piledriver/Welder 1/1/2025 $43.38 $22.72 $66.10
Carpenters - Piledriver/Welder 1/1/2026 $44.63 $23.47 $68.10
Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft Floor Layers
6/1/2024 $33.72 $19.20 $52.92
Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft Floor Layers
6/1/2025 $34.76 $20.91 $55.67
Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft Floor Layers
6/1/2026 $34.76 $23.41 $58.17
Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft Floor Layers
6/1/2027 $34.76 $25.66 $60.42
Cement Masons 1/1/2024 $31.22 $20.22 $51.44
Drywall Finisher 1/1/2025 $34.01 $24.63 $58.64
Drywall Finisher 6/1/2025 $35.16 $25.98 $61.14
Electricians & Telecommunications Installation Technician
12/27/2024 $50.86 $32.69 $83.55
Electricians & Telecommunications Installation Technician
12/26/2025 $53.11 $33.72 $86.83
Elevator Constructor 1/1/2025 $61.07 $40.05 $101.12
Elevator Constructor 1/1/2026 $63.71 $40.89 $104.60
Glazier 9/1/2024 $26.00 $26.95 $52.95
Glazier 9/1/2025 $28.00 $27.67 $55.67
Iron Workers 6/1/2024 $39.89 $36.47 $76.36
Iron Workers 6/1/2025 $41.50 $37.36 $78.86
Laborers (Class 01 - See notes) 1/1/2024 $26.31 $17.79 $44.10
Laborers (Class 01 - See notes) 1/1/2025 $28.31 $17.82 $46.13
Laborers (Class 02 - See notes) 1/1/2024 $29.56 $17.79 $47.35
Laborers (Class 02 - See notes) 1/1/2025 $30.66 $17.82 $48.48
Laborers (Class 03 - See notes) 1/1/2024 $28.66 $17.79 $46.45
Laborers (Class 03 - See notes) 1/1/2025 $31.56 $17.82 $49.38
Laborers (Class 04 - See notes) 1/1/2024 $25.31 $17.79 $43.10
Laborers (Class 04 - See notes) 1/1/2025 $27.31 $17.82 $45.13
Landscape Laborer (Skilled) 1/1/2025 $25.79 $18.78 $44.57
Landscape Laborer (Skilled) 1/1/2026 $26.79 $19.03 $45.82
Landscape Laborer (Tractor Operator) 1/1/2025 $26.09 $18.78 $44.87
Landscape Laborer (Tractor Operator) 1/1/2026 $27.09 $19.03 $46.12
Landscape Laborer 1/1/2025 $25.37 $18.78 $44.15
Landscape Laborer 1/1/2026 $26.37 $19.03 $45.40
Millwright 6/1/2020 $41.68 $20.32 $62.00
BUREAU OF LABOR LAW COMPLIANCE
PREVAILING WAGES PROJECT RATES
Report Date: 2/3/2026 Page 2 of 67
Expiration Date
Hourly Rate Fringe Benefits
Total
Operators (Class 01 - see notes) 7/1/2024 $36.87 $21.42 $58.29
Operators (Class 01 - see notes) 7/1/2025 $37.97 $21.82 $59.79
Operators (Class 01 - see notes) 7/1/2026 $39.12 $22.17 $61.29
Operators (Class 02 -see notes) 7/1/2024 $32.87 $21.42 $54.29
Operators (Class 02 -see notes) 7/1/2025 $33.35 $21.82 $55.17
Operators (Class 02 -see notes) 7/1/2026 $34.50 $22.17 $56.67
Operators (Class 03 - See notes) 7/1/2024 $29.70 $21.42 $51.12
Operators (Class 03 - See notes) 7/1/2025 $30.80 $21.82 $52.62
Operators (Class 03 - See notes) 7/1/2026 $31.95 $22.17 $54.12
Operators (Class 04 - Chief of Party (Surveying and Layout))
7/1/2024 $29.30 $21.42 $50.72
Operators (Class 04 - Chief of Party (Surveying and Layout))
7/1/2025 $30.40 $21.82 $52.22
Operators (Class 04 - Chief of Party (Surveying and Layout))
7/1/2026 $31.55 $22.17 $53.72
Operators (Class 04 - Instrument Person (Surveying & Layout))
7/1/2024 $28.30 $21.42 $49.72
Operators (Class 04 - Instrument Person (Surveying & Layout))
7/1/2025 $29.40 $21.82 $51.22
Operators (Class 04 - Instrument Person (Surveying & Layout))
7/1/2026 $30.55 $22.17 $52.72
Operators (Class 04 - Rodman/Chainman (Surveying and Layout))
7/1/2024 $27.85 $21.42 $49.27
Operators (Class 04 - Rodman/Chainman (Surveying and Layout))
7/1/2025 $28.95 $21.82 $50.77
Operators (Class 04 - Rodman/Chainman (Surveying and Layout))
7/1/2026 $30.10 $22.17 $52.27
Painters Class 6 (see notes) 6/1/2024 $32.14 $24.93 $57.07
Painters Class 6 (see notes) 6/1/2025 $34.16 $25.81 $59.97
Pile Driver Divers (Building, Heavy, Highway) 1/1/2025 $62.82 $22.72 $85.54
Pile Driver Divers (Building, Heavy, Highway) 1/1/2026 $64.70 $23.47 $88.17
Piledrivers 1/1/2025 $41.88 $22.72 $64.60
Piledrivers 1/1/2026 $43.13 $23.47 $66.60
Plasterers 6/1/2024 $33.14 $21.04 $54.18
Plumbers and Steamfitters 6/1/2025 $41.47 $27.71 $69.18
Plumbers and Steamfitters 6/1/2026 $42.92 $28.45 $71.37
Pointers, Caulkers, Cleaners 6/1/2025 $40.66 $21.99 $62.65
Pointers, Caulkers, Cleaners 12/1/2025 $41.50 $22.50 $64.00
Roofers 6/1/2025 $39.91 $20.76 $60.67
Roofers 12/1/2025 $41.21 $21.46 $62.67
Sheet Metal Workers 7/1/2024 $43.00 $33.96 $76.96
Sheet Metal Workers 7/1/2025 $45.00 $35.16 $80.16
Sign Makers and Hangars 7/15/2024 $32.32 $25.82 $58.14
Sign Makers and Hangars 7/15/2025 $33.48 $26.41 $59.89
Sprinklerfitters 4/1/2024 $46.45 $28.62 $75.07
Sprinklerfitters 4/1/2025 $49.75 $29.21 $78.96
Stone Masons 12/1/2022 $38.56 $23.61 $62.17
BUREAU OF LABOR LAW COMPLIANCE
PREVAILING WAGES PROJECT RATES
Report Date: 2/3/2026 Page 3 of 68
Expiration Date
Hourly Rate Fringe Benefits
Total
Terrazzo Finisher 6/1/2025 $41.73 $19.03 $60.76
Terrazzo Finisher 12/1/2025 $42.75 $19.51 $62.26
Terrazzo Mechanics 6/1/2025 $41.13 $21.28 $62.41
Terrazzo Mechanics 12/1/2025 $42.15 $21.76 $63.91
Tile Finisher 6/1/2025 $33.24 $18.36 $51.60
Tile Finisher 12/1/2025 $33.99 $18.71 $52.70
Tile Setter 6/1/2025 $40.15 $22.80 $62.95
Tile Setter 12/1/2025 $40.80 $23.25 $64.05
Truckdriver class 1(see notes) 1/1/2025 $36.43 $23.21 $59.64
Truckdriver class 1(see notes) 1/1/2026 $37.93 $23.71 $61.64
Truckdriver class 2 (see notes) 1/1/2025 $36.89 $23.52 $60.41
Truckdriver class 2 (see notes) 1/1/2026 $38.39 $24.02 $62.41
Window Film / Tint Installer 10/1/2019 $25.00 $2.63 $27.63
BUREAU OF LABOR LAW COMPLIANCE
PREVAILING WAGES PROJECT RATES
Report Date: 2/3/2026 Page 4 of 69
Project: 26-01013 - Heavy/Highway Effective
Expiration Date
Hourly Rate Fringe Benefits
Total
Carpenter 1/1/2025 $41.10 $22.09 $63.19
Carpenter 1/1/2026 $42.35 $22.84 $65.19
Carpenter Welder 1/1/2025 $42.60 $22.09 $64.69
Carpenter Welder 1/1/2026 $43.85 $22.84 $66.69
Carpenters - Piledriver/Welder 1/1/2024 $42.13 $21.97 $64.10
Carpenters - Piledriver/Welder 1/1/2025 $43.38 $22.72 $66.10
Carpenters - Piledriver/Welder 1/1/2026 $44.63 $23.47 $68.10
Cement Finishers 1/1/2024 $35.14 $26.30 $61.44
Cement Finishers 1/1/2025 $35.94 $27.50 $63.44
Cement Masons 1/1/2020 $32.84 $21.10 $53.94
Electric Lineman 6/3/2024 $53.97 $31.05 $85.02
Electric Lineman 6/2/2025 $57.10 $31.63 $88.73
Iron Workers (Bridge, Structural Steel, Ornamental, Precast, Reinforcing)
6/1/2024 $39.89 $36.47 $76.36
Iron Workers (Bridge, Structural Steel, Ornamental, Precast, Reinforcing)
6/1/2025 $41.50 $37.36 $78.86
Laborers (Class 01 - See notes) 1/1/2024 $32.20 $25.50 $57.70
Laborers (Class 01 - See notes) 1/1/2025 $33.70 $26.00 $59.70
Laborers (Class 01 - See notes) 1/1/2026 $34.70 $27.00 $61.70
Laborers (Class 02 - See notes) 1/1/2024 $32.36 $25.50 $57.86
Laborers (Class 02 - See notes) 1/1/2025 $33.86 $26.00 $59.86
Laborers (Class 02 - See notes) 1/1/2026 $34.86 $27.00 $61.86
Laborers (Class 03 - See notes) 1/1/2024 $32.75 $25.50 $58.25
Laborers (Class 03 - See notes) 1/1/2025 $34.25 $26.00 $60.25
Laborers (Class 03 - See notes) 1/1/2026 $35.25 $27.00 $62.25
Laborers (Class 04 - See notes) 1/1/2024 $33.20 $25.50 $58.70
Laborers (Class 04 - See notes) 1/1/2025 $34.70 $26.00 $60.70
Laborers (Class 04 - See notes) 1/1/2026 $35.70 $27.00 $62.70
Laborers (Class 05 - See notes) 1/1/2024 $33.61 $25.50 $59.11
Laborers (Class 05 - See notes) 1/1/2025 $35.11 $26.00 $61.11
Laborers (Class 05 - See notes) 1/1/2026 $36.11 $27.00 $63.11
Laborers (Class 06 - See notes) 1/1/2024 $30.45 $25.50 $55.95
Laborers (Class 06 - See notes) 1/1/2025 $31.95 $26.00 $57.95
Laborers (Class 06 - See notes) 1/1/2026 $32.95 $27.00 $59.95
Laborers (Class 07 - See notes) 1/1/2024 $33.20 $25.50 $58.70
Laborers (Class 07 - See notes) 1/1/2025 $34.70 $26.00 $60.70
Laborers (Class 07 - See notes) 1/1/2026 $35.70 $27.00 $62.70
Laborers (Class 08 - See notes) 1/1/2024 $34.70 $25.50 $60.20
Laborers (Class 08 - See notes) 1/1/2025 $36.20 $26.00 $62.20
Laborers (Class 08 - See notes) 1/1/2026 $37.20 $27.00 $64.20
Millwright 6/1/2024 $47.59 $23.72 $71.31
Millwright 6/1/2025 $49.72 $23.72 $73.44
Operators (Class 01 - see notes) 1/1/2025 $40.39 $24.23 $64.62
Operators (Class 01 - see notes) 1/1/2026 $41.96 $24.66 $66.62
Operators (Class 02 -see notes) 1/1/2025 $40.13 $24.23 $64.36
BUREAU OF LABOR LAW COMPLIANCE
PREVAILING WAGES PROJECT RATES
Report Date: 2/3/2026 Page 5 of 610
Project: 26-01013 - Heavy/Highway Effective
Expiration Date
Hourly Rate Fringe Benefits
Total
Operators (Class 02 -see notes) 1/1/2026 $41.70 $24.66 $66.36
Operators (Class 03 - See notes) 1/1/2025 $36.48 $24.23 $60.71
Operators (Class 03 - See notes) 1/1/2026 $38.05 $24.66 $62.71
Operators (Class 04 - See notes) 1/1/2025 $36.02 $24.23 $60.25
Operators (Class 04 - See notes) 1/1/2026 $37.59 $24.66 $62.25
Operators (Class 05 - See notes) 1/1/2025 $35.77 $24.23 $60.00
Operators (Class 05 - See notes) 1/1/2026 $37.34 $24.66 $62.00
Operators Class 1-A 1/1/2025 $43.39 $24.23 $67.62
Operators Class 1-A 1/1/2026 $44.96 $24.66 $69.62
Operators Class 1-B 1/1/2025 $42.39 $24.23 $66.62
Operators Class 1-B 1/1/2026 $43.96 $24.66 $68.62
Painters Class 1 (see notes) 6/1/2022 $34.45 $22.82 $57.27
Painters Class 2 (see notes) 6/1/2025 $40.36 $25.81 $66.17
Painters Class 3 (see notes) 6/1/2025 $43.68 $25.81 $69.49
Painters Class 4 (see notes) 6/1/2019 $28.20 $20.06 $48.26
Painters Class 5 (see notes) 6/1/2019 $22.91 $20.06 $42.97
Pile Driver Divers (Building, Heavy, Highway) 1/1/2025 $62.82 $22.72 $85.54
Pile Driver Divers (Building, Heavy, Highway) 1/1/2026 $64.70 $23.47 $88.17
Piledrivers 1/1/2025 $41.88 $22.72 $64.60
Piledrivers 1/1/2026 $43.13 $23.47 $66.60
Steamfitters (Heavy and Highway - Gas Distribution) 5/1/2022 $48.43 $40.28 $88.71
Truckdriver class 1(see notes) 1/1/2025 $36.43 $23.21 $59.64
Truckdriver class 1(see notes) 1/1/2026 $37.93 $23.71 $61.64
Truckdriver class 2 (see notes) 1/1/2025 $36.89 $23.52 $60.41
Truckdriver class 2 (see notes) 1/1/2026 $38.39 $24.02 $62.41
BUREAU OF LABOR LAW COMPLIANCE
PREVAILING WAGES PROJECT RATES
Report Date: 2/3/2026 Page 6 of 611
Department of General Services GSPUR-89 Rev. 11/06/12
RECIPROCAL LIMITATIONS ACT
REQUIREMENTS
Please Complete Applicable Portion of Pages 3 & 4 and Return with Bid.
NOTE: These Requirements Do Not Apply To Bids Under $10,000.00
I. REQUIREMENTS
A. The Reciprocal Limitations Act requires the Commonwealth to give preference to those bidders offering supplies produced, manufactured, mined or grown in Pennsylvania as against those bidders offering supplies produced, manufactured, mined or grown in any state that gives or requires a preference to supplies produced, manufactured, mined or grown in that state. The amount of the preference shall be equal to the amount of the preference applied by the other state for that particular supply.
The following is a list of states which have been found by the Department of General Services to have applied a preference for in-state supplies and the amount of the preference:
STATE PREFERENCE
1. Alaska 7% (applies only to timber, lumber, and manufactured lumber products originating in the state)
2. Arizona 5% (construction materials produced or manufactured in the state only)
3. Hawaii 10%
4. Illinois 10% for coal only
5. Iowa 5% for coal only
6. Louisiana 4% meat and meat products
4% catfish 10% milk & dairy products 10% steel rolled in Louisiana 7% all other products
7. Montana 5% for residents * 3% for non-residents*
*offering in-state goods, supplies, equipment and materials
8. New Mexico 5%
9. New York 3% for purchase of food only
10. Oklahoma 5%
11. Virginia 4% for coal only
12. Washington 5% (fuels mined or produced in the state only)
13. Wyoming 5%
B. The Reciprocal Limitations Act requires the Commonwealth to give preference to those bidders offering printing performed in Pennsylvania as against those bidders offering printing performed in any state that gives or requires a preference to printing performed in that state. The amount of the preference shall be equal to the amount of the preference applied by the other state for that particular category of printing.
The following is a list of states which have been found by the Department of General Services to have applied a preference for in-state printing and the amount of the preference:
STATE PREFERENCE
1. Hawaii 15%
2. Idaho 10%
3. Louisiana 3%
4. Montana 8%
5. New Mexico 5%
6. Wyoming 10%
C. The Reciprocal Limitations Act, also requires the Commonwealth to give resident bidders a preference against a nonresident bidder from any state that gives or requires a preference to bidders from that state or exclude bidders from states that exclude nonresident bidders. The amount of the preference shall be equal to the amount of the preference applied by the state of the nonresident bidder. The following is a list of the states which have been found by the Department of General Services to have applied a preference for in-state bidders and the amount of the preference:
STATE PREFERENCE
1. Alaska 5% (supplies only)
2. Arizona 5% (construction materials from Arizona resident dealers only)
3. California 5% (for supply contracts only in excess of $100,000.00)
4. Connecticut 10% (for supplies only)
5. Montana 3%
6. New Mexico 5% (for supplies only)
7. South Carolina 2% (under $2,500,000.00)
1% (over $2,500,000.00) This preference does not apply to construction contracts nor where the price of a single unit exceeds $10,000.
8. West Virginia 2.5% (for the construction, repair or improvement of any buildings
9. Wyoming 5%
STATE PROHIBITION
1. New Jersey For supply procurements or construction projects restricted to Department of General
Services Certified Small Businesses, New Jersey bidders shall be excluded from award even if they themselves are Department of General Services Certified Small Businesses.
D. The Reciprocal Limitations Act also requires the Commonwealth not to specify, use or purchase supplies which are produced, manufactured, mined or grown in any state that prohibits the specification for, use, or purchase of such items in or on its public buildings or other works, when such items are not produced, manufactured, mined or grown in such state. The following is a list of the states which have been found by the Department of General Services to have prohibited the use of out-of-state supplies:
STATE PROHIBITION
1. Alabama Only for printing and binding involving ”messages of the Governor to the Legislature“, all bills, documents and reports ordered by and for the use of the Legislature or either house thereof while in session; all blanks, circulars, notices and forms used in the office of or ordered by the Governor, or by any state official, board, commission, bureau or department, or by the clerks of the supreme court . . ./and other appellate courts/; and all blanks and forms ordered by and for the use of the Senate and Clerk or the House of Representatives, and binding the original records and opinions of the Supreme Court . . .
/and other appellate courts/
2. Georgia Forest products only
3. Indiana Coal
4. Michigan Printing
5. New Mexico Construction
6. Ohio Only for House and Senate bills, general and local laws, and joint resolutions; the journals and bulletins of the Senate and house of Representatives and reports, communications, and other documents which form part of the journals; reports, communications, and other documents ordered by the General Assembly, or either House, or by the executive department or elective state officers; blanks, circulars, and other work for the use of the executive departments, and elective state officers; and opinions of the Attorney General.
7. Rhode Island Only for food for state institutions.
*If the bid discloses that the bidder is offering to supply one of the above-listed products that is manufactured, mined, or grown in the listed state, it shall be rejected. Contractors are prohibited from supplying these items from these states.
II. CALCULATION OF PREFERENCE
In calculating the preference, the amount of a bid submitted by a Pennsylvania bidder shall be reduced by the percentage preference which would be given to a nonresident bidder by its state of residency (as found by the Department of General Services in Paragraph C above). Similarly, the amount of a bid offering Pennsylvania goods, supplies, equipment or materials shall be reduced by the percentage preference which would be given to another bidder by the state where the goods, supplies, equipment or materials are produced, manufactured, mined or grown (as found by the Department of General Services in Paragraphs A and B above).
THIS FORM MUST BE COMPLETED AND RETURNED WITH THE BID
III. STATE OF MANUFACTURE
All bidders must complete the following chart by listing the name of the manufacturer and the state (or foreign country) of manufacture for each item. If the item is domestically produced, the bidder must indicate the state in the United States where the item will be manufactured. This chart must be completed and submitted with the bid or no later than two (2) business days after notification from the Issuing Office to furnish the information. Failure to complete this chart and provide the required information prior to the expiration of the second business day after notification shall result in the rejection of the bid.
ITEM NUMBER NAME OF MANUFACTURER
STATE
(OR FOREIGNCOUNTRY)
OF MANUFACTURE
IV. BIDDER’S RESIDENCY
A. In determining whether the bidder is a nonresident bidder from a state that gives or requires a preference to bidders from that state, the address given on the first page of this invitation to bid shall be used by the Commonwealth. If that address is incorrect, or if no address is given, the correct address should be provided in the space below:
Correct Address:
B. In order to claim the preference provided under Section I.B., Pennsylvania resident bidders must complete the following or have such information on file with the Issuing Office:
1. Address of bidder’s bona fide establishment in Pennsylvania at which it was transacting business on the date when bids for this contract/requisition were first solicited:
2. a. If the bidder is a corporation:
(1) The corporation is or is not incorporated under the laws of the Commonwealth of Pennsylvania.
(a) If the bidder is incorporated under the laws of the Commonwealth of Pennsylvania, provide date of incorporation:
(b) If the bidder is not incorporated under the laws of the Commonwealth of Pennsylvania, it must have a certificate of authority to do business in the Commonwealth of Pennsylvania from the Pennsylvania Department of State as required by the Pennsylvania Business Corporation Law (15 P.S. §2001). Provide date of issuance of certificate of authority:
(2) The corporation is or is not conducting business in Pennsylvania under an assumed or fictitious name. If the bidder is conducting business under an assumed or fictitious name, it must register the fictitious name with the Secretary of the Commonwealth and the office of the prothonotary of the county wherein the registered office of such corporation is located as required by the Fictitious Corporate Name Act, as amended 15 P.S. §51 et seq. Corporate bidders conducting business under an assumed or fictitious name must provide date of registry of the assumed or fictitious name:
b. If the bidder is a partnership:
(1) The partnership is or is not conducting business in Pennsylvania under an assumed or fictitious name. If the bidder is conducting business under an assumed or fictitious name, it must file with the Secretary of the Commonwealth and the office of the prothonotary the county wherein the principal place of business is located as required by the Fictitious Name Act of May 24, 1945, P.L. 967, as amended 54 P.S. §28.1. Partnerships conducting business under an assumed or fictitious name must provide the date of filing of the assumed or fictitious name with the Secretary of the Commonwealth:
(2) The partnership is or is not a limited partnership formed under the laws of any jurisdiction other than the Commonwealth of Pennsylvania. If the bidder is an Out-of-state limited partnership, it must register with the Pennsylvania Department of State as required by the Act of July 10, 1981, P.L. 237, as amended, 59 Pa. C.S.A. §503. Out-of-state limited partnerships must provide the date of registry with the Pennsylvania Department of State:
c. If the bidder is an individual:
He or she is or is not conducting business under an assumed or fictitious name. If the bidder is conducting business under an assumed or fictitious name, he or she must file with the Secretary of the Commonwealth and the office of the prothonotary in the county wherein the principal place of business is located as required by the Fictitious Name Act of May 24, 1945, P.L. 967, as amended, 54 P.S. §28.1. Individuals conducting business under an assumed or fictitious name must provide the date of filing of the assumed or fictitious name with the Secretary of the Commonwealth:
WORKER PROTECTION AND INVESTMENT CERTIFICATION FORM
A. Pursuant to Executive Order 2021-06, Worker Protection and Investment (October 21, 2021), the Commonwealth is responsible for ensuring that every worker in Pennsylvania has a safe and healthy work environment and the protections afforded them through labor laws. To that end, contractors and grantees of the Commonwealth must certify that they are in compliance with Pennsylvania’s Unemployment Compensation Law, Workers’ Compensation Law, and all applicable Pennsylvania state labor and workforce safety laws including, but not limited to:
1. Construction Workplace Misclassification Act
2. Employment of Minors Child Labor Act
3. Minimum Wage Act
4. Prevailing Wage Act
5. Equal Pay Law
6. Employer to Pay Employment Medical Examination Fee Act
7. Seasonal Farm Labor Act
8. Wage Payment and Collection Law
9. Industrial Homework Law
10. Construction Industry Employee Verification Act
11. Act 102: Prohibition on Excessive Overtime in Healthcare
12. Apprenticeship and Training Act
13. Inspection of Employment Records Law
B. Pennsylvania law establishes penalties for providing false certifications, including contract termination; and three-year ineligibility to bid on contracts under 62 Pa. C.S. § 531 (Debarment or suspension).
CERTIFICATION
I, the official named below, certify I am duly authorized to execute this certification on behalf of the contractor/grantee identified below, and certify that the contractor/grantee identified below is compliant with applicable Pennsylvania state labor and workplace safety laws, including, but not limited to, those listed in Paragraph A, above. I understand that I must report any change in the contractor/grantee’s compliance status to the Purchasing Agency immediately. I further confirm and understand that this Certification is subject to the provisions and penalties of 18 Pa. C.S. § 4904 (Unsworn falsification to authorities).
Signature Date
Name (Printed)
Title of Certifying Official (Printed)
Contractor/Grantee Name (Printed)
BOP-2201
Published: 02/07/2022 16
BOP-2401
Published: 04/08/2024
Russia Belarus Certification
Background
Pennsylvania Act 57 of 2023 states that persons associated with Russia or Belarus may not bid on, submit a proposal for, enter into, be a party to or renew a contract with a Commonwealth agency for the provision of goods or services. Per Act 57, the Pennsylvania Treasury Department will publish a list of such persons.
To be compliant with this Act, the contracting officer will review the list published by Treasury as part of the determination of contractor responsibility prior to contract award. This process is outlined below. This completed document should be attached to the contract.
Instructions
1. Access the “Act 57 – Russia” list on the Pennsylvania Treasury’s Divestment Page: List-Pursuant-to- Act-57-of-2023-Russia.pdf (patreasury.gov)
2. Search for the supplier on the list. Use the name as listed on the supplier’s proposal/bid submission.
3. Complete the attestation below and attach to the contract. Suppliers appearing on the Treasury-published list are deemed not responsible and may not be issued a contract.
Attestation
On _________, I, ___________, verified that ______________. is not on the list of individuals doing business with Russia and Belarus, as accessed via the link above.
Signature of Attesting Individual https://www.legis.state.pa.us/cfdocs/legis/li/uconsCheck.cfm?yr=2023&sessInd=0&act=57 https://patreasury.gov/pdf/divestment/List-Pursuant-to-Act-57-of-2023-Russia.pdf https://patreasury.gov/pdf/divestment/List-Pursuant-to-Act-57-of-2023-Russia.pdf
Name and Address of Permittee:
Pennsylvania Game Commission 2001 Elmerton Avenue Harrisburg, PA 17110
County: Cambria
County Contact No.: (814) 419-1157
Issuing District Office: 9-0
District Contact No.: (814) 696-7260
Municipalities: Upper Yoder Township
Issue Date: 4/21/2025
Expiration Date: 10/21/2025
Application No.: 356361
Account No.:
Permit Fee: $ 0.00
Immediately upon completion of the work Permittee shall notify the permit office where application was made. Subject to all the conditions, agreements, restrictions, and regulations prescribed by the Pennsylvania Department of Transportation, (see in particular 67 Pa. Code, Chapter 212, 441 and 459 and State Highway Law, 36 P.S. Section 670 - 411, 420 and 421 ) and subject to the plans, special conditions, or restrictions herein set forth or attached hereto. This permit shall be located at the work site and shall be available for inspection by any police officer or Department representative.
Location and Description of Work Permit No.: 09033411
1 of 1 State Route #: 0271 Segment(s): From 0090 To 0090 Offset(s): From 0786 To 0786
511: Install Minimum Use Driveway
Permit Conditions Permit No.: 09033411
1 of 13 NOTIFY THE TRAFFIC MANAGEMENT CENTER AT 814-693-5915. PRIOR TO SETTING UP
ANY LANE CLOSURES OR RESTRICTIONS, AND WHEN THE CLOSURE/RESTRICTION IS
REMOVED.
2 of 13 CONTACT COUNTY PERMIT INSPECTOR AT LEAST 3 WORK DAYS PRIOR TO START OF
WORK AT 814-935-5391.
3 of 13 THIS PERMIT AUTHORIZES WORK ONLY IN DEPARTMENT HIGHWAY RIGHT OF WAY.
4 of 13 GUIDE RAIL MUST BE CAREFULLY REMOVED AND DELIVERED TO THE DEPARTMENT.
PLEASE CALL: Cambria County Maintenance Manager Mike Peachey 814) 419-1179 TO ARRANGE
FOR DELIVERY TO THE DEPARTMENT.
5 of 13 GUIDE RAIL END TREATMENTS MUST BE INSTALLED IN ACCORDANCE WITH
DEPARTMENT R.C.54 STANDARDS ON THE SAME DAY AS EXISTING GUIDE RAIL IS
REMOVED.
6 of 13 GUIDE RAIL MUST BE INSTALLED IN ACCORDANCE WITH DEPARTMENT'S ROADWAY
CONSTRUCTION STANDARDS.
7 of 13 IT IS THE PERMITTEE'S RESPONSIBILITY TO KEEP VEGETATION TRIMMED IN ORDER TO
MAINTAIN MINIMUM SIGHT DISTANCE. NO OBJECTS MAY BE PLACED WITHIN THE LINE
OF SIGHT.
8 of 13 PERMITTEE MUST MAINTAIN EXISTING SHOULDER DURING CONSTRUCTION.
9 of 13 SURFACE DRAINAGE MAY NOT BE DIRECTED ONTO STATE HIGHWAY RIGHT OF WAY.
10 of 13 IT IS THE PERMITTEE'S RESPONSIBILITY TO IDENTIFY ALL PENNDOT OWNED/OPERATED
FACILITIES WITHIN THE LIMITS OF PERMITTED WORK. IF DAMAGED BY THE PERMITTED
WORK, IT IS PERMITTEES RESPONSIBILITY TO CONTACT THE DEPARTMENT
IMMEDIATELY AND RESTORE THE FACILITY TO ITS ORIGINAL CONDITION OR AS
DIRECTED BY THE DEPARTMENT.
M-945P (6/12)
Highway Occupancy Permit Permit No.: 09033411
Page 1 of Permit # 09033411
Permit Conditions Permit No.: 09033411
11 of 13 ALL DISTURBED AREAS OUTSIDE THE PAVEMENT OR SHOULDER SHALL BE RESTORED
TO A CONDITION AT LEAST EQUAL TO THAT WHICH EXISTED BEFORE THE START OF
WORK.
12 of 13 MINIMUM WORK ZONE TRAFFIC CONTROL TO BE IN ACCORDANCE WITH PUB. 213. SEE
PUB 212 FOR ADDITIONAL DETAILS.
13 of 13 PERMITTEE IS RESPONSIBLE FOR ENSURING THAT MUD, SILT AND OTHER DEBRIS IS
REMOVED FROM VEHICLES AND TIRES (BY POWER WASH, ETC.) BEFORE ENTERING
ONTO THE HIGHWAY.
Acknowledgement of Completion
Permit work has been completed:
Date:
By:
Michael B. Carroll
Secretary of Transportation
Vincent Greenland, P.E.
District Executive
M-945P (6/12)
Highway Occupancy Permit Permit No.: 09033411
Page 2 of Permit # 09033411
Street Address 2
City State Zip Code
Doing Business As:
(if different from Legal Name)
Commonwealth of Pennsylvania Public Works Employment Verification Form
Complete and return the form to the contracting Public Body prior to the award of the contract.
Company Legal Name: ___________________________________________________________
Mailing Address: ______________________________________________________
Check one: Contractor Subcontractor
Contracting Public Body: _________________________________________________________
Contract/Project Number: ________________________________________________________
Project Description: _____________________________________________________________
Project Location: _______________________________________________________________
Date Enrolled in E-Verify (MM/DD/YYYY): ___________________________________________ As a contractor/subcontractor for the above referenced public works contract, I hereby affirm that as of today’s date, __________________________, our company is in compliance with the Public Works Employment Verification Act (‘the Act’) through utilization of the federal E-Verify Program (EVP) operated by the United States Department of Homeland Security. To the best of my/our knowledge, all employees hired are authorized to work in the United States.
It is also agreed to that all public works contractors/subcontractors will utilize the federal EVP to verify the employment eligibility of each new hire within five (5) business days of the employee start date throughout the duration of the public works contract. Documentation confirming the use of the federal EVP upon each new hire shall be maintained in the event of an investigation or audit.
I,____________________________________________, authorized representative of the company above, attest that the information contained in this verification form is true and correct and understand that the submission of false or misleading information in connection with the above verification shall be subject to sanctions provided by law.
Authorized Representative Signature Date of Signature
Printed Name: _________________________________________________________________
Phone Number: ______________________ Email: ____________________________________
Street Address 1
TECHNICAL SPECIFICATIONS
The following stipulations, specifications and description of Work are defined and described as Technical Specifications and it is understood and agreed that everything herein contained is hereby made part of the Contract. Wherever any feature of the Work is not fully set forth in these Technical Specifications and is necessary for the completion of Work, it shall be understood that the same is governed by the rules of the best prevailing practice for that class of Work, as determined by the Pennsylvania Game Commission and its representatives.
These Technical Specifications and any drawings, maps and/or plans forming a part thereof, will cover the furnishing of all labor, equipment, tools, materials, and related items necessary to perform the Work, as required under this Contract.
Section 1 – Summary of Work Section 2 – Submittals Section 3 – ES Control Section 4 – Foreign Borrow Excavation Section 5 – Aggregate Section 6 – Asphalt Seal Coat Section 7 – Guiderail Section 8 – Post-Mounted Sign Section 9 – Excavation Section 10 – Seeding
DRAWINGS
The following Drawings are included:
CS-1 Cover Sheet GN-1 General Notes C-1 Construction Plan C-2 Construction Plan TS-1 Typical Sections GP-1 Grading Plan GP-2 Grading Plan P-1 Roadway Profile ES-1 E&S Control Plan XS-1 Cross Sections XS-2 Cross Sections XS-3 Cross Sections XS-4 Cross Sections
22 TS-1-1
TECHNICAL SPECIFICATION SECTION No. 1 - SUMMARY OF WORK
1.1 – SCOPE OF PROJECT
The intent of this project is to construct an access road from State Route 271 (Menoher Blvd.) to serve as the new entrance to the Pennsylvania Game Commission (PGC) State Game Lands 042. The new access road is in Upper Yoder Township, Cambria County on State Game Lands #042. The project consists of establishing a new roadway base, placing roadway material, applying seal coat treatment and associated state highway guide rail removal and installation. The site has a drop in elevation from the proposed access point to the location of the connection with the existing roadway.
1.2 – WORK AREA
The work area for this project is on State Game Lands #042. The roadway site is located along State Route 271, Menoher Blvd., in Upper Yoder Township, near Silver Birch Lane, Johnstown, PA 15905. The property is owned by the PGC.
1.3 – WORK HOURS
The work hours at the project site are during regular PGC business hours which are Monday through Friday, 7:00AM to 3:30PM. Work during different hours is permitted with prior approval by the PGC. Requests should be submitted two days in advance.
1.4 – ACCESS TO WORK AREA
Access to the work area is directly off Menoher Blvd. The Contractor shall keep all equipment and materials within the limit of disturbance of the project.
1.5 – SITE LAYOUT AND PREPARATION
The PGC will locate the approximate roadway centerline during the initial job conference.
The Contractor is responsible for the new roadway construction and other associated roadway construction on the project.
23 TS-1-2
1.6 – PERMITS, LAWS AND REGULATIONS
The Contractor shall procure and pay for all permits, licenses, inspections, conveniences, or other approvals necessary for the execution of the contract. The only fee expected may or may not be a third-party inspection of the electrical meter base and trenching. The PGC has secured a building permit from the PA Department of Labor & Industry (L&I) for construction of this building at no cost to the contractor. A copy of this permit will be provided to the contractor along with an inspection log checklist. The contractor shall notify the L&I inspector and coordinate with the PGC so that the required inspections take place, and the project is not unduly delayed. Local building code officials have no jurisdiction over this project.
The Contractor shall comply with all laws, ordinances, rules, orders and regulations relating to the performance of the work, the protection of adjacent property, the maintaining of surface passageways, safety measures, and/or other protective facilities.
All applicable Federal and State laws and regulations and regulations of all utilities, having jurisdiction over construction of the project shall apply to the contract throughout, and they shall be deemed to be included in the contract as a part, thereof, the same as though herein written out in full.
All regulations of the Occupational Safety and Health Act are in effect on this contract. It will be the Contractor’s responsibility to make himself aware of all appropriate County, State and Federal regulations that apply to this contract.
Any violations incurred from improper execution of the above provisions shall be paid for by the Contractor. Loss of time on the project from such violations will not be tolerated.
24 TS-2-1
TECHNICAL SPECIFICATION SECTION No. 2 - SUBMITTALS
2.1 – SECTION INCLUDES/CONTENT
A. Included in this section of the specifications is a list of approvals required for all materials incorporated into the project. The Pennsylvania Game Commission reserves the right to require additional approvals if necessary. No material, equipment or supplies listed herein shall be incorporated into the work until the Contractor has obtained prior approval from the Department.
B. Submittals required by each prime contract are indicated in the description of items to be submitted, Paragraph 2.8.
2.2 - SUBMITTAL PROCEDURES
A. Comply with the following or resubmission will be required:
1. Indicate contract number and specification section on each item submitted.
2. Signify approval by stamp, initialing and dating each item prior to submission to the
Designer.
B. Items requiring testing shall be forwarded directly to the approved laboratory. The
Contractor shall pay all costs associated with testing.
C. Expedite critical materials, equipment and shop drawings, and other required submissions.
D. Incomplete submissions will be returned for resubmission.
E. Use of substitutions for materials or details shown on the contract drawings or called for in these specifications require written approval from the Department.
2.3 - PRODUCT DATA
A. Manufacturer's printed directions and manufacturer's standard specifications showing all dimensions, cuts, finishes, etc., as well as catalog cuts and ratings of all material will be required and shall be submitted in advance prior to application and/or installation.
2.4 - TESTS
A. Submit required reports listing items tested, tests conducted, and results obtained as specified.
2.5 - CERTIFICATIONS
A. Submit required certifications in written form identifying authorized representative, manufacturer, systems designer, and other required data as specified.
25 TS-2-2
2.6 - WARRANTIES
A. Refer to Specifications for required warranties. Copies of proposed warranties specified for products shall accompany the designated submittal of that product.
2.7 - OPERATION AND MAINTENANCE MANUALS
A. Manual Format (Use 3-ring binder):
1. Title page with the following information for each system covered:
a. Project Title and Contract Number (in capital letters)
b. Name of Company
c. Name of the individual to be called
d. Normal telephone numbers
e. Contractor's account number for project
2. Index listing all sections of the Manual.
3. Copies of all warranties for equipment or materials furnished in contract. (Index tabbed)
4. Complete system circuit diagrams, block diagrams, copies of all approved shop drawings, which shall clearly illustrate how all the components relate and how they are interconnected and a point wiring diagram.
5. Reports, testing analysis.
6. Operating instructions and maintenance instructions for all equipment and finish materials furnished.
7. All approved, shop drawings, descriptive data, and any certifications.
2.8 - SUBMITTALS LIST
A. Abbreviations
1. Mfr - for Manufacturer
2. Prod - for Producer or Supplier
3. SHDR - for Shop Drawings
4. DeDa - for Descriptive Data or Catalog Cuts
5. Samp - for Samples
6. Cert - for Certification
7. Tests - required Test Reports
8. Warr – for Warranties
26 TS-2-3
GENERAL CONSTRUCTION
DESCRIPTION OF ITEMS
TO BE SUBMITTED
MFR PROD SHDR DeDa SAMP CERT TESTS WARR
2A COARSE AGGREGATE X X
AASHTO #3 AGGREGATE X X
CRS-2 BITUMINOUS
MATERAIL
X X
#67 TYPE A AGGREGATE X X
#8 TYPE A AGGREGATE X X
GUIDERAIL AND
RELATED COMPONENTS
X X X X
PROJECT SCHEDULE X
27 TS-3-1
TECHNICAL SPECIFICATION SECTION No. 3 - EROSION AND SEDIMENTATION
CONTROL
3.1 -SCOPE
This work is implementing the erosion and sedimentation control measures to protect the surrounding environment. Compliance is required with Chapter 102 of the Department of Environmental Protection’s regulations is also required.
3.2 - PROCEDURE
The Contractor shall install a 12-inch diameter silt sock around the construction site as indicated on the Site Plan drawing.