This is a specification document for a construction bid issued by the City of Minneapolis Water Treatment and Distribution Services for the installation of a crane beam in the boiler room of Pump Station 6 located on the Fridley Water Treatment campus. The project scope includes all labor, materials, and site preparation necessary to complete the crane beam installation work. The work must be completed by November 30, 2026. Work is scheduled during weekdays, Monday through Friday, between 7:00 a.m. and 4:30 p.m. The specification requires bidders to submit a written PDF scope of work outlining project execution methodology, along with documentation of contractor qualifications, safety certifications, and prior experience references. No bidders' conference or formal site visit requirement is explicitly stated, though site conditions are documented through photographs included in the specification.

Pricing and payment terms require all work to be placed on a City-issued Purchase Order, with invoices submitted electronically in PDF format to submitinvoices@minneapolismn.gov within thirty days of service completion and acceptance. The specification does not reference set-aside provisions, incumbent contractors, or specific funding amounts. However, bidders must demonstrate minimum qualifications including AWS D1.1 welding certifications for personnel, submission of a contractor safety program compliant with OSHA standards, OSHA Forms 300 and 300A from the past five years, and two safety performance references. All contractor personnel on-site for more than five working days must pass criminal background investigations conducted through an independent third-party provider. The City reserves the right to reject any or all bids and is not obligated to award an exclusive contract, reserving the option to hire multiple contractors for similar work.

View the file

Other files

File Type Posted
Call_for_Bids.pdf PDF
BID_-_PW_PS6_Boiler_Room_Crane_Beam.pdf PDF
10463327_MPLS_PS6_Boiler_Room_Crane_Signed.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PS6 Boiler Room Crane – MWW 2605 1 | P a g e

SPECIFICATIONS

Minneapolis Water Treatment and Distribution

PS6 Boiler Room Crane MWW Specification No. 2605

OVERVIEW/PURPOSE:

This specification describes the requirements for bidding installation of a crane beam on City of Minneapolis’ Fridley Water Treatment campus. Beam will be installed in the boiler room of Pump Station 6. Bid shall include all labor, materials, and site preparation to complete work. Work shall be completed before November 30, 2026

Non-Exclusive Any contract(s) resulting from this Request for Bid will not be an exclusive contract and the City reserves the right to hire other contractors, to perform similar work, and seek bids from other vendors.

Rights of the City

The City reserves the right to reject all or any part of any bid, waive informalities, and award the contract to the lowest responsive and responsible contractors to best serve the interest of the City. Informality shall mean a minor defect or variation of a bid from the exact requirements of the Request for Bid which does not affect the price, quality, quantity, or delivery schedule for the goods, services or construction being procured.

REQUIREMENTS:

Minimum Qualifications Bidders must demonstrate that they have the resources and capability to provide all materials, services, and documents described in this specification. All bidders must submit the documentation indicated below with their bid. Failure to provide any of the required documentation shall be cause for bid to be deemed non-responsible and rejected.

Safety:

Contractor is required to comply with all relevant safety procedures outlined in Section 01 35 23, specifically with the City of Minneapolis hot work procedures. All contractor personnel shall be fully trained and certified to perform the work in accordance with these and all applicable safety programs, policies, and requirements.

Safety Submittals

• A copy of the contractors’ safety program. Safety Program shall include the applicable elements as described in OSHA part 1926 Safety and Health Regulations for Construction and part 1910 General Industry Standards.

• A copy of the contractor’s safety logs from the last five (5) years:

o OSHA Form 300 – Log of Work-Related Injuries and Illnesses.

o OSHA Form 300A – Summary of Work-Related Industries and Illnesses.

• Filling out specification attachment – MWW Experience Form

PS6 Boiler Room Crane – MWW 2605 2 | P a g e

Certification Prior to work start, contractor shall present AWS D1.1 certifications for proper personnel.

Safety Attachments

• Section 01 35 23 Safety Procedures

• MWW Experience Form

Security:

The contractor will be required to comply with all City security procedures outlined in Section 01 35 53.

Security Attachments

• Section 01 35 53 Security Procedures

Logistics:

Work to be Performed

Contractor’s work and responsibility includes, but is not limited to, what is described on attached drawing sheet S-102. Pipe supports may be removed, but pipes must be temporarily supported by other means until the original supports are back in place. Height of ceiling from basement floor is 40ft.

Hours of Operation Work shall be scheduled during weekdays, Monday through Friday, between the hours of 7am to 4:30pm.

Work Execution Submittal A successful bid from a contractor shall include a written PDF scope outlining how project will be executed.

EQUIPMENT AND MATERIALS:

Contractor shall have in its possession all tools and equipment necessary to access and install beam including all safety equipment that may be required by OSHA or any other regulating government agencies. Any specialty equipment needed to perform a task that is not covered by the above statement shall be presented to the City for approval and acceptance prior to work commencement.

Quality of Materials Unless otherwise specified, all materials and equipment incorporated in this project shall be new and of the best quality for the purpose intended.

Delays and Delivery Failures The Contractor must keep the City advised at all times of status of parties’ agreement. If delay is foreseen, the Contractor shall give immediate written notice to the City Project Manager.

INVOICE AND PAYMENT:

All work requested under this Contract shall be placed on a City issued Purchase Order.

Contractor shall submit invoices and documentation in an electronic format.

PS6 Boiler Room Crane – MWW 2605 3 | P a g e

Upon completion and acceptance of the service, the contractor shall submit an invoice detailing the appropriate charges.

Invoices shall be submitted to submitinvoices@minneapolismn.gov in a PDF format attachment. Include company name in subject line and cc the City Project Manager on the email. Do not include any messages in the body of the email because these emails are not monitored, nor does it get forwarded.

Top of invoice first page should include:

• Purchase Order Number

• Projects name

• Project Manager’s name

• “Public Works – Water Division” label

• Invoice amount

• Total contract amount

If multiple invoices are required and agreed upon, invoices must also include:

• Amount previously invoiced

• Total invoiced to date

Upon receipt of invoice and final inspection and acceptance of the service, the City will render payment within thirty (30) days unless any items thereon are questioned, in which event payment will be withheld pending verification of the amount claimed and the validity of the claim. The contractor shall provide complete cooperation during any such investigation.

The City will not pre-pay for service. All bills shall state the location and dates of service being billed. All fees, taxes, charges, surcharges, and revenue payments are to be itemized.

mailto:submitinvoices@minneapolismn.gov

PS6 Boiler Room Crane – MWW 2605 4 | P a g e

Attachments:

• PS6 Existing Conditions

• Drawing Sheet S-102

• Section 01 35 23 Safety Procedures

• MWW Experience Form

• Section 01 35 53 Security Procedures

PS6 Boiler Room Existing Conditions

Figure 1: Ceiling from boiler room floor

Figure 2: Boiler room from entrance platform

Figure 3: Boiler room from boiler platform; showing pipe gallery and supports

Figure 4: Access hatch to basement elevation

Figure 5: Boiler room access at basement elevation

MWW Specification 2517

Section 01 35 00 - 1

PS6 Boiler Room Crane Beam

SECTION 01 35 23

SAFETY PROCEDURES

PART 1 - GENERAL

1.01 SUMMARY

A. Section includes safety and coordination requirements for working on the Owner's property.

B. Submission of a Bid will constitute incontrovertible representation by the Bidder that they understand and will comply with the information and requirements of this section.

C. Contractor is fully responsible for safety on the Construction site and shall assign at least one of their employees as competent person(s).

D. Emergency evacuation maps are posted at major building entrances. Contractor shall inquire of the Owner or Plant Supervisor if there are any questions.

1.02 SUBMITTALS

A. Within seven days of the bid closing and before Notice to Proceed, the Contractor shall submit the following items. These items are required by OSHA's Process Safety Management Program

(PSM) and the EPA's Risk Management Program (RMP).

1. A copy of the Contractor's safety program. Safety program shall include the applicable elements as described in OSHA Part 126 Safety and Health Regulations for the Construction

Industry and Part 1910 General Industry Standards.

2. 14BA copy of the Contractor 's safety logs from the most recent 5 years:

a. OSHA Form 300 - Log of Work-Related Injuries and Illnesses and

b. OSHA Form 300A - Summary of Work-Related Injuries and Illnesses

3. Two references (name, affiliation, address, and phone number) to attest to Contractor's safety record and performance.

B. Contractor is responsible for the content of their own safety program. The Owner reserves the right to request changes or additions to the safety program. However, neither the Owner nor the

Engineer will not be responsible for errors or omissions in the Contractor's safety program.

1.03 SPECIAL PROVISIONS FOR WORK NEAR CHLORINE AND AMMONIA

A. The work performed under this contract may take place near areas where chlorine and ammonia are stored and/or used in the water treatment plants. Chlorine is in the form of liquefied gas under pressure. Anhydrous ammonia is also in the form of liquefied gas under pressure. Any leak of these chemicals will release a gas that can harm people. At low doses, they will temporarily irritate eyes and throat. High doses can be fatal.

B. The Fridley Filtration Plant has chlorine delivered and stored in one-ton containers in a separate structure. Anhydrous ammonia is stored in tanks in a separate structure. Chlorine solution and

Ammonia gas are fed into the process water in the plant. Electronic gas detectors monitor the storage and feed system areas for potential leaks. Both the chlorine and ammonia storage systems include emergency gas scrubber and automatic shut-off valves to reduce the risk of gas release.

In addition, other liquid chemicals are stored in the plant. The list of the chemicals will be shared as part of the Hazard Briefing described below.

C. The Columbia Heights Membrane Filtration Plant has chlorine delivered and stored in one-ton containers. Chlorine solution and aqueous ammonia are fed into the process water in the plant.

Section 01 35 00 - 2

Electronic gas detectors monitor the storage and feed system areas for potential leaks. The chlorine storage system includes an emergency gas scrubber and automatic shut-off valves to reduce the risk of gas release. In addition, other liquid chemicals are stored in the two plants on the campus. The list of the chemicals will be shared as part of the Hazard Briefing described below.

D. The Contractor must abide by the measures outlined in Part 3, and shall cooperate with the

Owner's staff toward these ends.

1.04 HOT WORK

A. All Contractors are required to comply with all OSHA standards, including 1910.252, "General

Requirements for Welding, Cutting, and Brazing". This standard covers basic precautions for fire protection and prevention. For elaboration of these basic precautions, special precautions, and delineation of the fire protection and prevention responsibilities of Contractor personnel

(including welders and cutters and their supervisors), refer to the latest edition of the National

Fire Protection Association's Standard 51B: Standard for Fire Prevention During Welding, Cutting, and Other Hot Work.

1. Owner will advise Contractor about flammable materials or hazardous conditions.

2. Hot Work is defined as any work with flame or sparks (cutting, welding, brazing, grinding, etc.) in the following locations:

a. Confined spaces,

b. In contact with Chlorine or Ammonia gas piping or storage vessel,

c. within 50 feet of Chlorine or Ammonia gas piping or storage vessel.

3. Contractor shall inform the Plant Supervisor at least 3 days before beginning Hot Work.

4. Hot Work Permits will be required every workday for any Hot Work.

5. Plant Supervisor will have forms and may have additional instructions appropriate for the work and location. See Supplement "Hot Work Permit and Hot Work Checklist."

6. All Hot Work should stop about 30 minutes before the end of each work shift to allow monitoring of the area after work stops.

1.05 ENERGY CONTROL PROGRAM (LOCK-OUT TAG-OUT) PROCEDURES

A. Contractor must follow the applicable procedures in the Energy Control Program document attached to this section.

B. Contractor must include requirements in their Site Safety Plan that are compatible with the

Owner's Energy Control Program.

1.06 CONFINED SPACE ENTRY PROCEDURES

A. Contractor must follow the applicable procedures in the Confined Space Entry Program document attached to this section.

B. Contractor must include requirements in their Site Safety Plan that are compatible with the

Owner's Confined Space Entry Program.

C. Contractor must confirm that all personnel that will enter Confined Spaces have been properly trained.

D. Contractor must provide their own attendant(s) outside of the confined space ("Top person").

Section 01 35 00 - 3

PART 2 - PRODUCTS

2.01 NOT USED

PART 3 - EXECUTION

3.01 HAZARD BRIEFING PRIOR TO START OF WORK

A. Contractor supervisory staff shall attend a briefing on the hazards of chemicals at Minneapolis

Water facilities, emergency response procedures, and Contractor access procedures. The

Contractor will be asked to sign the "CONTRACTOR SAFETY MANAGEMENT BRIEFING

FORM (RM/PSM)", indicating they have received the briefing and will disseminate the information to all persons in their employment, as well as all subcontractors and agents that will work on the site.

3.02 REQUIREMENTS DURING WORK

A. The Contractor shall notify Owner staff, including the Plant Supervisor and Project Manager, at least 3 days before any hot work (defined above).

1. Notification shall be in writing (electronic version is acceptable) and shall include the precise nature, location, beginning time, and duration of work, along with any other relevant details.

It shall be the Contractor's responsibility to provide sufficient detail in the notice for the

Owner to review and make determinations with regard to safety and operations.

2. The Owner will respond in writing in a timely manner (allow 3 working days) so as not to hinder or delay the work of the Contractor without sufficient cause. The sufficiency of this cause however, whenever in doubt, shall be determined solely by the Owner.

3. The Contractor may not proceed with the work without the written approval of the Plant

Supervisor.

B. Submit Hot Work Permits daily to the Plant Supervisor.

C. Safety Training Records: The Contractor shall submit copies of their safety training records to the

Owner's project manager as informational submittals if they have been working at the site for more than one (1) year. The training records shall show employee names, dates of training, listing of safety program elements in which they were trained. Training records shall also identify all employees working directly on the chlorine or anhydrous ammonia systems.

Attachments:

Supplement 1 - Contractor Safety Management Briefing Form (RMP/PSM)

Supplement 2 - Energy Control Program (Lockout/Tagout)

Supplement 3 - Public Works Confined Space Entry Program

Supplement 4 - Hot Work Permit form

END SECTION

Section 01 35 23 Supplement 1 - Page 1

CITY OF MINNEAPOLIS

WATER TREATMENT AND DISTRIBUTION SERVICES

Contractor Safety Management Briefing Form

PROCESS SAFETY MANAGEMENT / RISK MANAGEMENT PLAN

Presenter’s Name Date / /

Project Name

By signing below I affirm that, in accordance with OSHA 29 CFR 1910.119 Process Safety Management (PSM) of Highly Hazardous Materials and 40 CFR Part 68.87—Chemical Accident Prevention Provisions, I have received a safety brief from Minneapolis Water personnel covering chlorine and ammonia hazards, safe work practices including lockout/tagout, and emergency response procedures.

In no way should this briefing be construed as replacing the required contractor employee safety training. I further understand that Minneapolis Water expects contractors, including their subcontractors, suppliers, agents and employees of such, to perform construction activities under OSHA-required regulations and the Minneapolis Water procedures and that they have received all of the required associated training.

It is understood that all information presented to me by the Minneapolis Water staff shall be disseminated to all persons, subcontractors, and agents employed either directly or indirectly by us. I agree to submit documentation as required by Minneapolis Water to verify that my employees, subcontractors, and any other parties working directly or indirectly for me are conveyed the information required and have received any required training.

I agree to submit a written statement indicating whether my work presents any unique hazards and a description of those hazards.

Date Print Name Signature Company

NOTE: Minneapolis Water is not responsible for training contractors. Minneapolis Water has an obligation to inform or “brief” contractors on the topics listed, but it does not have an obligation to train contractors. It does have an obligation, however, to reasonably assure that the contractor has provided its personnel with safety training and provide a brief overview of the specific process hazards and emergency response plan for Minneapolis Water.

Project manager – Please keep a copy of this completed form in the project folder

H O

T W

O R

K P

ER

M

IT

FO

R

O

PE

N F

LA

M

E A

N D

S

PA

R K

H A

ZA

D

Al l te m po ra ry o pe ra tio ns i nv ol vi ng o pe n fla m es o r pr od uc in g he at a nd

/o r sp ar ks r eq ui re a

H O

T W

O R

K P

ER

M

IT

Th is in cl ud es

, b ut is n ot li m ite d to

Br az in g, C ut tin g G rin di ng , S ol de rin g, T ha w in g, a nd W el di ng

Em pl oy ee at e_

Bu ild in g_

_A re a_ ep t._

_F lo or

W or k to b e do ne

Sp ec ia l P re ca ut io ns

Is fi re w at ch re qu ire d?

Th e lo ca tio n w he re th is w or k is to b e do ne h as b ee n ex am in ed , n ec es sa ry pr ec au tio ns ta ke n, a nd p er m is si on is g ra nt ed fo r t hi s w or k.

Se e ot he r s id e)

Pe rm it Ex pi re s

Si gn ed

(In di vi du al re sp on si bl e fo r au th or iz in g w el di ng a nd c ut tin g)

Ti m e st ar te d

C om pl et ed

FI

N A

L C

H

EC

K -U

P W or k ar ea a nd a ll ad ja ce nt a re as to w hi ch s pa rk s an d he at m ig ht h av e sp re ad

(i nc lu di ng fl oo rs a bo ve a nd b el ow a nd o n op po si te s id es o f w al ls

) w er e in sp ec te d m in ut es a fte r w or k w as c om pl et ed a nd w er e fo un d fir e sa fe

Si gn ed

(S up er vi so r o r F ire

W at ch er

T W

O R

K C

H

EC

K

LI

ST

Be fo re a pp ro vi ng a ny c ut tin g an d w el di ng p er m it, th e su pe rv is or s ha ll in sp ec t th e w or k ar ea a nd c on fir m th at p re ca ut io ns h av e be en ta ke n to p re ve nt fi re in ac co rd an ce w ith N

FP

A

B

P

EC

A

U

TI

O

S

Sp rin kl er s in s er vi ce

C ut tin g an d w el di ng e qu ip m en t i n go od re pa ir

M ul ti-pu rp os e fir e ex tin gu is he r a nd

/o r w at er p um p ca n.

W

IT

H

IN

FE

ET

O

F W

O

K

Fl oo rs s w ep t c le an o f c om bu st ib le s om bu st ib le fl oo rs w et d ow n, c ov er ed w ith d am p sa nd

, m et al o r ot he r s hi el ds o co m bu st ib le m at er ia l o r f la m m ab le li qu id bu st ib le s an d fla m m ab le li qu id s pr ot ec te d w ith c ov er s, g ua rd or et al s hi el ds

Al l w al l a nd fl oo r o pe ni ng s co ve d ov er s su sp en de d be ne at h w or k to c ol le ct s pa rk

R K

O N

W A

LL

S

O R

C

EI

LI

N

G S on st ru ct io n no nc om bu st ib le a nd w ith ou t c om bu st ib le c ov er in g bu st ib le s m ov ed a w ay fr om o pp os ite s id e of w al l

R

K

IN

C O

N

FI

N

ED

S

PA

ES

(T an ks

, c on ta in er s, d uc ts , d us t c ol le ct or s, e tc

Eq ui pm en t c le an ed o f a ll co m bu st ib le on ta in er s pu rg ed o f f la m m ab le v ap or

Fo llo w c on fin ed s pa ce g ui de lin es

E

W

AT

Su pp lie d w ith e xt in gu is he r

Tr ai ne d in u se o f e qu ip m en t a nd in s ou nd in g fir e al ar

A L

C H

EC

K

-U P

To b e m ad e m in ut es a fte r c om pl et io n of a ny o pe ra tio n un le ss fi w at ch is p ro vi de d

TH

ER

P R

EC

AU

TI

O

N S

TA

K

EN

Si gn ed

Su pe rv is or

Section 01 35 23 Supplement 4

Th is P ag e

In te nt io na lly

L ef t B la nk

Section 01 35 23 Supplement 4

BID-PW – PS6 Boiler Room Crane

Prior Experience and Reference Form

Company Name: ______________________________________________

Date: _______________________________________________________

List two (2) references able to attest to safety record and performance related to service requirements listed in this specification and bid form. Please include customer name, affiliation, work address and contact information.

1. _____________________________________________________________________________________

2. _____________________________________________________________________________________

Provide list of jobs within the last two (2) years related to service requirements listed in this specification and bid form. Provide Customer, Location and Date.

Customer Location Date Description

Failure to complete and submit this form may result in your bid being deemed unresponsive.

Further any bidder who is currently suspended/debarred will be deemed unresponsive. MN Rule Part 1230.1150 subpart 6A PW-Paving, 4.17.2024

01 35 53 - 1 PS6 Boiler Room Crane

SECTION 01 35 53

SECURITY PROCEDURES

PART 1 - GENERAL

1.01 SUMMARY

1. Requirements of the Public Health Security and Bioterrorism Preparedness and Response Act of 2002 and the Homeland Security Act of 2002 require that municipal water utilities be managed as secure locations.

2. These acts define security screening of all employee and contractor personnel, controlling access to facilities and controlling access to information as “basic security requirements.” The

City of Minneapolis has reviewed these requirements and will manage them in the following manner.

1.02 CRIMINAL BACKGROUND INVESTIGATIONS

A. All Contractor or Sub-Contractor personnel who will be on the project site for more than five (5) working days or have the need or opportunity to access water facility information must submit to the collection, review and approval of personal criminal background history information.

B. Personal criminal background information will be acquired through an independent third party investigator that is licensed, insured and under contract with the City to perform said investigations.

C. Persons submitting to a background investigation will do so via secure website. This requires disclosing the following information.

1. Full legal name.

2. Current address.

3. Social Security number.

4. All past addresses for previous seven years.

5. Any known aliases.

6. Date of birth

D. The background investigation will consist of searching and reporting information for all disclosed and discovered history information involving:

1. County criminal.

2. State criminal.

3. Federal criminal.

4. Global watch.

E. Personal credit history information will not be collected nor reviewed as part of this investigation.

F. All history gathered will be forwarded to the City for review and approval. The City reserves the right to deny access to its facilities and information as it deems appropriate.

G. Under Data Privacy Act Laws, specific details of the investigation will not be released to anyone other than the person (upon request) being investigated. The City will simply report findings as either "Pass or Fail".

01 35 53 - 2 PS6 Boiler Room Crane

H. Under the Fair Credit and Reporting Act (FCRA) Federal law, the City is required to notify individuals they will be denied site access based on information found in their background investigation. Individuals will be notified by email, along with a copy of the background check report and a copy of the summary of your rights under the FCRA before any action is taken.

1. If the individual believes there is false information in the report, they may submit additional information. The City will re-investigate and provide an updated report. A final determination will be made after the second report is reviewed.

1.03 SUBMITTAL PROCESS FOR CRIMINAL BACKGROUND CHECKS

A. The Contractor shall send the following information to the Project Manager on all individuals who require access to the work site:

1. First, Middle, and Last name

2. Personal email address (not corporate address, for privacy reasons)

3. Phone Number

4. Project name

5. Company name

B. The Project Manager will forward the individual’s information above to the City Security

Division who will enter the information into the database of the City’s Background Investigation

Service Provider (herein BGI Service Provider). The BGI Service provider may change through time, so the City Project Manager will inform the Contractor of the current provider.

C. The BGI Service Provider will contact each individual via their personal email and provide them with a secure link to enter their personal information. Once the individual completes this form and submits it, the background investigation process will begin.

1. The individual should check their spam and junk email folders as it might automatically go there. Each individual has 30 days to enter the information before the link expires.

2. To prevent any delays this information must be completed and returned to the Provider as soon as possible – the background investigation process cannot begin until this step is complete.

D. City Security Division will be alerted by the BGI Service Provider when individual background investigations have been completed. Security will review the reports and make a determination on pass / fail based on the contents of the report.

E. Once the BGI consent form has been forwarded by the individual to the BGI Service Provider, the Project Manager should allow about 10 business days for the City to review and make a determination on the individual’s pass/fail status.

F. If adverse information is discovered during the investigation process, Security Staff will forward a copy of the report along with written notice of the findings to the individual. He /she will have 3 business days from receipt to dispute the findings with the BGI Service Provider. Access to City property will be denied unless the original report is found to be erroneous.

PART 2 - PRODUCTS

2.01 NOT USED

01 35 53 - 3 PS6 Boiler Room Crane

PART 3 - EXECUTION

3.01 CONTROLLING ACCESS TO FACILITIES:

A. All Contractor personnel approved by the City will be issued work identification (ID) badges.

These badges must be worn at all times while on Minneapolis Water (MWW) property. ID badges allow access to the work site; identify the person, the activity and the area of the facility where personnel are allowed to enter.

B. Any persons not wearing their ID badges or frequenting unapproved areas will be escorted from the premises. If an individual is escorted from the premises more than twice, that person will be removed from the work eligible list and not allowed to return to MWW.

C. Gates onto Minneapolis property and providing plant site access, including the construction entrance, must be locked or attended at all times.

D. NO deliveries or pickups will be allowed unless the Contractor is available for escort.

E. Any Contractor or Subcontractor personnel whose work require them to be on site for less than five total days must be escorted on to the site and under the direct supervision by contractor personnel who have successfully passed the investigation and are in position of Minneapolis-issued ID badges.

F. Select contractor personnel who require access inside other controlled area(s) will be authorized for access as coordinated with Owner.

G. All Identification Badges and Access Cards must be returned to Owner prior to final application for payment. A fee of $100 will be deducted from final payment for each badge or card not returned.

3.02 SITE AND BUILDING ACCESS SCHEDULE

A. Contractor personnel Door and Gate access cards will be active from 7:00 am to 4:30 PM, Monday through Friday, except on City Holidays. Contractor shall discuss any needed exceptions to this schedule with the Owner's Project Manager in advance of the need. Construction observation by Engineer or Owner should be available to allow Contractor access.

B. The City observes the following holidays:

1. New Year's Day – January 1

2. Martin Luther King Jr. Day – Third Monday of January

3. Presidents’ Day – Third Monday of February

4. Memorial Day – Last Monday of May

5. Juneteenth - June 19

6. Independence Day – July 4

7. Labor Day – First Monday of September

8. Indigenous Peoples’ Day – Second Monday of October

9. Veterans Day – November 11

10. Thanksgiving – Fourth Thursday of November

11. Day after Thanksgiving

12. Christmas Day –December 25

01 35 53 - 4 PS6 Boiler Room Crane

13. If a Holiday is on a Saturday, it will be observed on Friday. If the Holiday is on a Sunday, it will be observed on Monday.

3.03 GENERAL ACCESS CONTROL METHODS

A. For long-term systems, keys should not be needed for any employees or non-employees. Card readers shall be used for long-term access. Each locked building door will be keyed, but keys will not be distributed for access.

B. Keys will only be allowed for selected cabinets where other methods are impractical. Use common keying per building wherever possible. Deliver at least 4 copies of every required key to the Plant Supervisor prior to Substantial Completion.

C. All exterior doors and gates must have monitored (and alarmed) position switches.

D. All exterior doors shall have electrical boxes to allow installation of card readers. Those left for future installation must have weather-tight covers over the empty boxes.

E. Card Readers shall be included on the outside of each door, wherever people will be allowed access from outside. Request to exit switches shall be included in crash bars and hand lever, to confirm open door has not been forced.

F. Some exterior doors may be for emergency exit only, and should have no door pulls, knobs, or levers on the outside.

G. Construction Projects should require at least 3 key changes

1. Contractor full control – Owner only allowed to have a few keys.

2. Owner partial occupancy – wider distribution of keys to Owner’s representatives, (typically prior to card reader installation). Contractor remains in charge of keying.

3. Owner Full Occupancy – Full control of keying by Owner (typically after installation of card readers). Contractor shall work with an Owner employee to aid the last core change.

3.04 CONTROLLING ACCESS TO INFORMATION:

A. Contractors must sign a non-disclosure agreement defining the Contractors responsibilities for being allowed access to and provided copies of the specifications, drawings and technical information in the process control and plant security areas. The Contractor agrees it will require sub-contractors to meet all requirements of this agreement.

B. The Contractor shall also sign and maintain a “Chain-of-Custody” agreement document for the duration of the work. This agreement requires City approval of the distribution of any sensitive information as well as documentation of who/what/when and where said information is accessed or distributed.

C. Any documents developed by the Contractor in progress of the Work shall become a part of the

“information” and will be subject to the requirements of this section.

END OF SECTION

Specification 2605
Attachments
PS6 Boiler Room Crane Existing Conditions
Secion 01 35 23 Safety Procedures
MWW Experince Form
Section 01 35 53 Security Procedures

File details come from the government source that posted it. Updated .