Collins Fence Project Section 01505 Mobilization Final.pdf

PDF 37 KB Posted

Attached to
COLLINS FENCE REMOVAL & CONSTRUCTION Federal contract opportunity
Solicitation number
140L6220Q0084
Issued by
Department of the Interior Bureau of Land Management Wyoming Region

View the file

Other files for this federal contract opportunity

Other files attached to COLLINS FENCE REMOVAL & CONSTRUCTION, newest first.
File Type Posted
Sol_140L6220Q0084_Amd_0001.pdf PDF
Site Visit_0001.pdf PDF
140l6220Q0084 AMD 0001 QUESTION AND ANSWERS_0001.docx DOCX document
Collins Fence Project Bid Schedule Final.xlsx XLSX spreadsheet
Sol_140L6220Q0084.pdf PDF
01009 General BFO BLM Collins Fence Project Final.pdf PDF
02834 Collins Wire and Gates Fence Project Final.pdf PDF
Collins Fence Project 02827 Fence Removal Specs Final.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DIVISION 1 SECTION 01505

GENERAL REQUIREMENTS MOBILIZATION / DEMOBILIZATION

BFO BLM COLLINS FENCE REPLACEMENT AND REALIGNMENT PROJECT 01505 - 1 o1

PART 1: GENERAL

1.1 SUMMARY

A. This Section includes preparatory work and operations, including those necessary to the movement of personnel, equipment, materials, and incidentals to and from the project site; and for other work and operations that must be performed or costs incurred prior to beginning work on the various items on the project site.

B. This shall also include the project office, portable sanitary facilities, and other storage containers/trailers with jobsite tools and hand tools and small supplies necessary for the project. The location of these items shall not interfere with the traffic plan or Work.

C. Move to and remove from the project site all equipment, personnel, supplies, and incidentals which are necessary for completing the Work.

D. Provide all bonding fees, and other insurance fees not specifically called out for payment that are required for the Work or for operations which must be performed.

PART 2: PRODUCTS

(There are no applicable requirements in this section.)

PART 3: EXECUTION

(There are no applicable requirements.)

PART 4: MEASUREMENT AND PAYMENT

4.1 METHOD OF MEASUREMENT:

A. Mobilization / Demobilization covers the cost of equipment, materials, and labor for mobilizing and demobilizing to the site. No measurement of individual items will be made.

4.2 BASIS OF PAYMENT:

A. Payment shall constitute full compensation for all labor, expenses, supplies, equipment and incidentals, including bonding fees and insurance fees, required to complete the Work.

B. Final payment for all Work (including the lump sum amount shown on the bid form for mobilization and demobilization) can be withheld subject to the Contracting Officer’s approval of finished site conditions.

C. Payment will be made upon final completion of the project.

D. Payment: Full compensation for mobilization and demobilization, including preparation of staging/storage area, and cleanup shall be on a lump sum basis.

Pay Item Description Pay Unit

01505 Mobilization / Demobilization Lump Sum

END OF SECTION