Collins Fence Project Section 01505 Mobilization Final.pdf
PDF 37 KB Posted
- Attached to
- COLLINS FENCE REMOVAL & CONSTRUCTION Federal contract opportunity
- Solicitation number
- 140L6220Q0084
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140L6220Q0084_Amd_0001.pdf | ||
| Site Visit_0001.pdf | ||
| 140l6220Q0084 AMD 0001 QUESTION AND ANSWERS_0001.docx | DOCX document | |
| Collins Fence Project Bid Schedule Final.xlsx | XLSX spreadsheet | |
| Sol_140L6220Q0084.pdf | ||
| 01009 General BFO BLM Collins Fence Project Final.pdf | ||
| 02834 Collins Wire and Gates Fence Project Final.pdf | ||
| Collins Fence Project 02827 Fence Removal Specs Final.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DIVISION 1 SECTION 01505
GENERAL REQUIREMENTS MOBILIZATION / DEMOBILIZATION
BFO BLM COLLINS FENCE REPLACEMENT AND REALIGNMENT PROJECT 01505 - 1 o1
PART 1: GENERAL
1.1 SUMMARY
A. This Section includes preparatory work and operations, including those necessary to the movement of personnel, equipment, materials, and incidentals to and from the project site; and for other work and operations that must be performed or costs incurred prior to beginning work on the various items on the project site.
B. This shall also include the project office, portable sanitary facilities, and other storage containers/trailers with jobsite tools and hand tools and small supplies necessary for the project. The location of these items shall not interfere with the traffic plan or Work.
C. Move to and remove from the project site all equipment, personnel, supplies, and incidentals which are necessary for completing the Work.
D. Provide all bonding fees, and other insurance fees not specifically called out for payment that are required for the Work or for operations which must be performed.
PART 2: PRODUCTS
(There are no applicable requirements in this section.)
PART 3: EXECUTION
(There are no applicable requirements.)
PART 4: MEASUREMENT AND PAYMENT
4.1 METHOD OF MEASUREMENT:
A. Mobilization / Demobilization covers the cost of equipment, materials, and labor for mobilizing and demobilizing to the site. No measurement of individual items will be made.
4.2 BASIS OF PAYMENT:
A. Payment shall constitute full compensation for all labor, expenses, supplies, equipment and incidentals, including bonding fees and insurance fees, required to complete the Work.
B. Final payment for all Work (including the lump sum amount shown on the bid form for mobilization and demobilization) can be withheld subject to the Contracting Officer’s approval of finished site conditions.
C. Payment will be made upon final completion of the project.
D. Payment: Full compensation for mobilization and demobilization, including preparation of staging/storage area, and cleanup shall be on a lump sum basis.
Pay Item Description Pay Unit
01505 Mobilization / Demobilization Lump Sum
END OF SECTION