Collins Fence Project 02827 Fence Removal Specs Final.pdf
PDF 39 KB Posted
- Attached to
- COLLINS FENCE REMOVAL & CONSTRUCTION Federal contract opportunity
- Solicitation number
- 140L6220Q0084
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140L6220Q0084_Amd_0001.pdf | ||
| Site Visit_0001.pdf | ||
| 140l6220Q0084 AMD 0001 QUESTION AND ANSWERS_0001.docx | DOCX document | |
| Collins Fence Project Bid Schedule Final.xlsx | XLSX spreadsheet | |
| Sol_140L6220Q0084.pdf | ||
| Collins Fence Project Section 01505 Mobilization Final.pdf | ||
| 01009 General BFO BLM Collins Fence Project Final.pdf | ||
| 02834 Collins Wire and Gates Fence Project Final.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DIVISION 2 SECTION 02827
SITEWORK FENCE REMOVAL
BFO BLM COLLINS FENCE REPLACEMENT AND REALIGNMENT PROJECT 02827 1 of 1
PART 1: GENERAL
1.1 SUMMARY
A. Section Includes: Removing and disposing of 16,100 linear feet of 2-5 barbed wire topped woven (net) wire fence to include all associated end panels, stress panels, corner panels, and gates. All material shall be removed from the worksite and properly disposed of in a legal manner by the Contractor. The Contractor shall not re-use any of the removed fencing material for this project.
1.2 PROJECT/SITE CONDITIONS
A. Requirements: Access roads shall not be constructed along fence lines or to the jobsite unless written approval is granted by the Contracting Officer.
PART 2: PRODUCTS
2.1 MATERIALS
A. Requirements: Furnish materials required to remove fences and gates, including all wire, posts, and appurtenances.
PART 3: EXECUTION
3.1 REMOVAL
A. Fence Removal: Remove all fences, end, stress, and corner panels, and gates as staked in the field or as designated by the Contracting Officer. Dispose of debris offsite in a legal manner.
PART 4: MEASUREMENT AND PAYMENT
4.1 METHOD OF MEASUREMENT
A. Units: Fence Removal will be paid for by the linear foot of fence removed and include any associated materials and appurtenances with the fence (stress panels, gates etc.), as measured on the ground next to the fence prior to removal. This shall include disposal of associated materials.
4.2 BASIS OF PAYMENT
A. Payment: Prices and payment will be full compensation for the work described in this section.
Payment will be made under:
Pay Item Description Pay Unit
02827 Fence Removal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Linear Foot
END OF SECTION
| PART 1: GENERAL |
| PART 2: PRODUCTS |
| PART 3: EXECUTION |
| PART 4: MEASUREMENT AND PAYMENT |
| END OF SECTION |