About this file

This document is Amendment #01 to Agency Term Contract ATC-21-005 between the State of Florida Department of Corrections and Brenntag Mid-South, Inc. The amendment modifies a statewide contract for wastewater and water treatment chemicals, specifically updating the public records section and revising the pricing exhibit to include Calcium Hypochlorite 68% Tablets.

The contract covers multiple chemical products across four regions, with consistent unit pricing for each item. The pricing includes chemicals such as Gas Chlorine, Aluminum Sulfate, Sodium Hypochlorite, Sodium Bisulfite, and others, with estimated annual quantities and total prices specified for each region. The unit prices are firm and include handling, shipping, environmental, and other applicable fees. The amendment maintains the existing contract terms, with prices remaining the same throughout the contract period. The estimated annual purchase volume for key items like Sodium Hypochlorite 12.5% is 55,000 gallons, with a total regional price of $103,400.00.

View the file

Other files

File Type Posted
ContractBudgetExport (2).csv CSV file
CN-700000-17030-Amd #5.pdf PDF
CN-700000-21005.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment #01

ATC-21-005

Wastewater and Water Treatment Chemicals

This Amendment (“Amendment”), effective the date fully executed below, to the Agency Term

Contract ATC-21-005 (“Contract”) is between the State of Florida, Department of Corrections

(“Department”) and Brenntag Mid-South, Inc. (“Contractor”). The Department and Contractor are collectively referred to herein as the “Parties” and individually as a “Party.” All capitalized terms used herein shall have the meaning assigned to them in the Contract, unless otherwise defined herein.

1.0 MODIFICATIONS

In accordance with Section V. Amendments, of the above-referenced Contract, the following modifications are hereby applied:

1.1 Section XIV. Other Conditions, A. Public Records is revised as follows:

A. Public Records

The Contractor agrees to: (a) keep and maintain public records required by the

Department in order to perform the service; (b) upon request from the

Department’s custodian of public records, provide the Department with a copy of the requested records or allow the records to be inspected or copied within a reasonable time at a cost that does not exceed the cost provided in this chapter or as provided by law; (c) ensure that public records that are exempt or confidential and exempt from public records disclosure requirements are not disclosed except as authorized by law for the duration of the contract term and following completion of the Contract if the Contractor does not transfer the records to the Department; and (d) upon completion of the Contract, transfer, at no cost, to the Department all public records in possession of the Contractor or keep and maintain public records required by the Department to perform the service. If the

Contractor transfers all public records to the Department upon completion of the

Contract, the Contractor shall destroy any duplicate public records that are exempt or confidential and exempt from public records disclosure requirements.

If the Contractor keeps and maintains public records upon completion of the

Contract, the Contractor shall meet all applicable requirements for retaining public records. All records stored electronically must be provided to the Department, upon request from the Department’s custodian of public records, in a format that is compatible with the information technology systems of the Department.

Pursuant to §287.058(1)(c), F.S, the Department is allowed to unilaterally cancel the Contract for refusal by the Contractor to allow public access to all documents, Amendment #01 Page 2 of 7 papers, letters, or other material made or received by the Contractor in conjunction with the Contract, unless the records are exempt from §24(a) of Art. I of the State Constitution and either §119.07(1), F.S. or §119.071, F.S.

If the Contractor has questions regarding the application of Chapter 119, Florida Statutes, to the Contractor’s duty to provide public records relating to this Contract, contact the custodian of public records at:

Florida Department of Corrections ATTN: Public Records Unit 501 South Calhoun Street Tallahassee, Florida 32399-2500 Telephone: (850) 717-3605 Fax: (850) 922-4355 Email: CO.PublicRecords@fdc.myflorida.com Website:

https://floridadoc.govqa.us/WEBAPP/_rs/(S(mxurvkhn004w tw1eymm15f4x))/SupportHome.aspx

1.2 In accordance with Section XII. Additions/Deletions, Exhibit B, Contractor’s Pricing, is revised to reflect the addition of Calcium Hypochlorite 68% Tablets.

The REVISED Exhibit B, Contractor’s Pricing, is attached hereto.

[REMAINDER OF THE PAGE INTENTIONALLY LEFT BLANK]

mailto:CO.PublicRecords@fdc.myflorida.com https://floridadoc.govqa.us/WEBAPP/_rs/(S(mxurvkhn004wtw1eymm15f4x))/SupportHome.aspx https://floridadoc.govqa.us/WEBAPP/_rs/(S(mxurvkhn004wtw1eymm15f4x))/SupportHome.aspx

Amendment #01 Page 4 of 7

REVISED Exhibit B Contractor’s Pricing

FDC ITB-20-010 ATC-21-005

Prices are firm, and include all handling, shipping, environmental, and other applicable fees. The Contractor agrees that in the absence of an equitable price adjustment, as indicated in PUR 1000 (Section 5.1), renewal pricing will remain the same throughout the Contract.

Shipping destinations for each Region include all sites listed in Attachment IV of Exhibit A, Delivery Locations.

REGION I

Item Description Unit Unit Price

(A)

Estimated Annual

Quantity (B) Total Price (C)

= (A x B)

Gas Chlorine 150 lb.

Cylinder $78.99 300 $23,697.00

Aluminum Sulfate 50% Gallons $1.93 8,000 $15,440.00

Calcium Hypochlorite Tab 68% Pounds $2.035 100 $203.50

Calcium Hypochlorite Granular 68%

Pounds $1.07 100 $107.00

Sodium Hypochlorite 12.5% Gallons $1.88 55,000 $103,400.00

Sodium Bisulfite 40% 55-Gallon

Drum $127.00 96 $12,192.00

Sodium Hydroxide 50% 55-Gallon

Drum $174.987 72 $12,599.06

Sodium Hypochlorite 10% Gallons $1.578 100 $157.80

Hydrated Lime 50% 50 Pound bag $15.19 300 $4,557.00

Orthophosphate 36% Gallons $4.17 100 $417.00

Polyphosphate Orthophosphate 70-36%

Gallons $6.953 100 $695.30

Polyphosphate Orthophosphate 36-70%

Gallons $8.12 100 $812.00

CarusTM 3190 Gallons $11.26 100 $1,126.00

Citric Acid 99% Gallons $1.085 100 $108.50

BRENNTAG MID-SOUTH, INC. 2/16/2021

NAME OF CONTRACTOR (COMPANY) DATE

Amendment #01 Page 5 of 7

REGION II

Item Description Unit Unit Price

(A)

Estimated Annual

Quantity (B) Total Price (C)

= (A x B)

Gas Chlorine 150 lb.

Cylinder $78.99 300 $23,697.00

Aluminum Sulfate 50% Gallons $1.93 8,000 $15,440.00

Calcium Hypochlorite Tab 68% Pounds $2.035 100 $203.50

Calcium Hypochlorite Granular 68%

Pounds $1.07 100 $107.00

Sodium Hypochlorite 12.5% Gallons $1.88 55,000 $103,400.00

Sodium Bisulfite 40% 55-Gallon

Drum $127.00 96 $12,192.00

Sodium Hydroxide 50% 55-Gallon

Drum $174.987 72 $12,599.06

Sodium Hypochlorite 10% Gallons $1.578 100 $157.80

Hydrated Lime 50% 50 Pound bag $15.19 300 $4,557.00

Orthophosphate 36% Gallons $4.17 100 $417.00

Polyphosphate Orthophosphate 70-36%

Gallons $6.953 100 $695.30

Polyphosphate Orthophosphate 36-70%

Gallons $8.12 100 $812.00

Amendment #01 Page 6 of 7

REGION III

Item Description Unit Unit Price

(A)

Estimated Annual

Quantity (B) Total Price (C)

= (A x B)

Gas Chlorine 150 lb.

Cylinder $78.99 300 $23,697.00

Aluminum Sulfate 50% Gallons $1.93 8,000 $15,440.00

Calcium Hypochlorite Tab 68% Pounds $2.035 100 $203.50

Calcium Hypochlorite Granular 68%

Pounds $1.07 100 $107.00

Sodium Hypochlorite 12.5% Gallons $1.88 55,000 $103,400.00

Sodium Bisulfite 40% 55-Gallon

Drum $127.00 96 $12,192.00

Sodium Hydroxide 50% 55-Gallon

Drum $174.987 72 $12,599.06

Sodium Hypochlorite 10% Gallons $1.578 100 $157.80

Hydrated Lime 50% 50 Pound bag $15.19 300 $4,557.00

Orthophosphate 36% Gallons $4.17 100 $417.00

Polyphosphate Orthophosphate 70-36%

Gallons $6.953 100 $695.30

Polyphosphate Orthophosphate 36-70%

Gallons $8.12 100 $812.00

Amendment #01 Page 7 of 7

REGION IV

Item Description Unit Unit Price

(A)

Estimated Annual

Quantity (B) Total Price (C)

= (A x B)

Gas Chlorine 150 lb.

Cylinder $78.99 300 $23,697.00

Aluminum Sulfate 50% Gallons $1.93 8,000 $15,440.00

Calcium Hypochlorite Tab 68% Pounds $2.035 100 $203.50

Calcium Hypochlorite Granular 68%

Pounds $1.07 100 $107.00

Sodium Hypochlorite 12.5% Gallons $1.88 55,000 $103,400.00

Sodium Bisulfite 40% 55-Gallon

Drum $127.00 96 $12,192.00

Sodium Hydroxide 50% 55-Gallon

Drum $174.987 72 $12,599.06

Sodium Hypochlorite 10% Gallons $1.578 100 $157.80

Hydrated Lime 50% 50 Pound bag $15.19 300 $4,557.00

Orthophosphate 36% Gallons $4.17 100 $417.00

Polyphosphate Orthophosphate 70-36%

Gallons $6.953 100 $695.30

Polyphosphate Orthophosphate 36-70%

Gallons $8.12 100 $812.00

BRENNTAG MID-SOUTH, INC. 61-0504545

NAME OF CONTRACTOR (COMPANY) FEIN

ORIGINAL ON FILE 2/16/20202021

SIGNATURE OF AUTHORIZED REPRESENTATIVE DATE

STEPHANIE UBACH, MUNICIPAL BID MANAGER

PRINTED NAME OF AUTHORIZED REPRESENTATIVE

File details come from the government source that posted it. Updated .