This document is a Task Work Order Amendment Form for Professional Services issued by the State of Florida Department of Transportation (FDOT), involving Volkert, Inc., a consulting firm located in Tampa, Florida. The amendment is associated with Contract No. X0479 and dated September 4, 2019, specifically Amendment No. 1 to Task Work Order No. 1.

The amendment cancels post-storm safety inspections on TWO (Task Work Order) No. 1, effectively reducing the compensation for Basic Services from $50,000.00 to $0.00. The method of compensation is based on (LA4) Units worked at loaded billing rates in Table 6. The document indicates that an independent assessment of staff hours and quantities has been performed and found to be fair, reasonable, and competitive. The amendment was signed by Will Watts, Chief Engineer for FDOT, and Bo Sanchez, Senior Vice President of Volkert, Inc., with distribution to Ed Kestory, Michelle Sloan, Felix Pedilla, and Drew Appler from Volkert.

View the file

Other files

File Type Posted
CN-550000-BEF34-00010000.pdf PDF
CN-550000-X0479.pdf PDF
ContractBudgetExport.csv CSV file
CN-550000-X0479-00020000.pdf PDF
CN-550000-X0479-00050000.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION

TASK WORK ORDER AMENDMENT FORM

FOR PROFESSIONAL SERVICES

375-030-26

PROCUREMENT

06/17 recovered is $ 50,000.00 .

Subtotal Estimate/L imit

$0.00 Limit

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Attachments:

Distribution:

($50,000.00)

$0.00

($50,000.00)

Departmental Approval:

Total authorizations to date (including this one):

Other Notes:

An independent assessment of the staff hours and quantities for the proposed services has been performed, and found to be fair, reasonable, and competitive.

Page 1 subtotal

Page 2 thru 6 Subtotal

Total authorized against this task work order beyond the date of execution of this amendment. The following amount is the remaining work order balance to be recovered

The time for completion of services for the subject task work order is extended thru

The total amount for services performed under this task work order is increased by $

The total amount for services performed under this task work order is decreased by $

The decrease in funds will be allocated to the following compensation elements described below.

elements are described below.

from this task work order $ . Note: for Prof. Serv. Task Work Order Amendments, the encumbrance line should never be closed

The subject task work order is hereby closed. Final payment for the task work order has been set to PAID status in CITS. No additional services or charges are

(Status 50) by Financial Services staff based on this selection. Additional Note: Please be sure you want to close out before marking. Premature close outs that must

The subject task work order is hereby canceled (no work has been performed and no payment is due). The total amount of the task work order which is

The additional funds will be allocated to the following compensation elements described below.

There is no increase/decrease in the task work order amount, funds are only redistributed between compensation elements. Revised compensation be corrected in CITS may require programmer time and costs borne by the program office.

Compensation Element

Description

This Amendment

Amount

Basic Services ($50,000.00)

Previous

Amount

$50,000.00

Method of Compensation

(LA4) Units worked at loaded billing rates in

Table 6

(Title)

Bo Sanchez

Signature

Senior Vice President

(Name)

$0.00

(Name) (Title) Signature

Will Watts Chief Engineer

Ed Kestory, Michelle Sloan, Felix Pedilla, Drew Appler- Volkert

Consultant Acceptance:

Payment FM No. (must be the same as original Task Work Order):

Check all applicable Terms:

Cancel post storm safety inspections on TWO No. 1.

1408 N. Westshore Blvd., Suite 600, Tampa, FL 33607

Volkert, Inc.

Address:

Consultant:

Date (To be entered upon execution of Task Work Order Amendment):Contract No.:

9/4/2019X0479

Purpose of Amendment:

Amendment No.

to Task Work Order No.

DocuSign Envelope ID: 1FA25A18-BC5D-49A5-BB43-F4BE4D7C3437

File details come from the government source that posted it. Updated .