CN-550000-E4P20-00110000.pdf

PDF 40 KB Posted

Attached to
Master Agreement FL|E4P20|b5001ab645f014a0816c6bfa7527a2ac
Contract number
E4P20
Issued by
Florida

About this file

This document is a Work Document for a Traffic Operation District 4 Push Button Contract issued by the Florida Department of Transportation (FDOT), specifically from the Traffic Operations Project Engineer Jose R. Guerrero to Eduardo Caballero, the West Palm Beach Operations Engineer. The work document involves Community Asphalt Corp. as the contractor, with the project located in the City of Riviera Beach, Palm Beach County, at SR-A1A (North Ocean Drive) and Island Road.

The contract is for roadway work involving the installation of a marked crosswalk and ADA ramps at the specified intersection. The total estimated work cost is $6,399.76, which does not include construction costs of the pay item out of the contract. The project is expected to be completed in November 2015, with a timeline of 5 days after procurement. The work document (No. PBC-6-2015) is associated with District Contract No. E4P20, Project No. 229833-7-52-01, and Section No. 93080. The document indicates that the contractor will need to coordinate a pre-construction field review meeting and provide a tabulation of quantities.

View the file

Other files

File Type Posted
CN-550000-E4P20-00030000.pdf PDF
CN-550000-E4P20-00040000.pdf PDF
CN-550000-E4P20-00060000.pdf PDF
ContractBudgetExport.csv CSV file
ContractDeliverablesExport.csv CSV file
CN-550000-E4P20-00090000.pdf PDF
CN-550000-E4P20-00100000.pdf PDF
CN-550000-E4P20-00020000.pdf PDF
CN-550000-E4P20-00050000.pdf PDF
CN-550000-E4P20-00080000.pdf PDF
CN-550000-E4P20.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .