CN-550000-CAX55-00010000.pdf

PDF 225 KB Posted

Attached to
Master Agreement FL|CAX55|efd8b241e59e4754fd87e96cab564395
Contract number
CAX55
Issued by
Florida

About this file

This document is a Notice to Proceed issued by the Florida Department of Transportation (FDOT) to Castillo Engineering, Inc., located in Miami, FL. The notice pertains to Contract No. CAX55, with two specific Financial Project IDs (421548-6-62-01 and 421548-7-62-01), authorizing the firm to begin work on Construction Engineering and Inspection (CEI) services for two SR-93/I-75 Interchange projects located between Griffin Road and Royal Palm Boulevard, and from South Royal Palm Boulevard to South SW 14th Street.

The contract commence date is 05/13/2025 and is scheduled for completion by 09/12/2027, with a total duration of approximately 2 years. The contract specifies that any work performed out of scope or beyond the contract service period must be covered by an approved supplemental agreement or time extension to be eligible for payment by FDOT. The Department's Project Manager for this contract is Christopher Comprosky, who can be reached at 954-547-2807 or christopher.comprosky@dot.state.fl.us. The notice is signed by Paul A. Lampley, P.E., Director of Transportation Operations, and includes standard distribution to Financial Services Office, Procurement Office, and the Project Manager.

View the file

Other files

File Type Posted
CN-550000-CAX55-00020000.pdf PDF
CN-550000-CAX55.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION

NOTICE TO PROCEED

375-030-89

PROCUREMENT

04/22 www.fdot.gov

3400 W. Commercial Blvd.

Fort Lauderdale, Florida 33309

Pacifico Castillo

Castillo Engineering, Inc.

12030 SW 129th Court, #204

Miami, FL 33186

RE: Contract No. CAX55

Financial Project ID No. 421548-6-62-01; 421548-7-62-01

CEI Services for SR-93/I-75 Interchange at Royal Palm Blvd. from Griffin Rd. to Royal

Palm Blvd. and SR 93/I-75 Interchange at Royal Palm Blvd. from S. Royal Palm Blvd. to

South SW 14th Street

NOTICE TO PROCEED

Dear Mr. Castillo:

In accordance with the terms of the Agreement executed between your firm and the Department, you are hereby authorized to begin work on the above referenced project effective for Contract CAX55.

The terms of your contract require that all work be completed by . The terms also require that work performed out of scope or beyond the contract service period, which is not covered by an approved supplemental agreement or time extension, will not be eligible for payment by the

FDOT. We look forward to working with you and your firm on this important project. The Department’s

Project Manager is Christopher Comprosky, and can be reached at 954-547-2807 or christopher.comprosky@dot.state.fl.us.

Sincerely, Paul A. Lampley, P.E.

Director of Transportation Operations cc: Financial Services Office

Procurement Office

Christopher Comprosky

Docusign Envelope ID: BA298520-F56C-4418-90E8-B499559098DC

05/13/2025 | 1:45 PM EDT

05/13/2025 | 1:45 PM EDT

09/12/2027