CN-550000-CAT75-00050000.pdf
PDF 498 KB Posted
- Contract number
- CAT75
- Issued by
- Florida
About this file
This document is a Task Work Order for Professional Services issued by the Florida Department of Transportation (FDOT) to Volkert, Inc., a consulting firm located in Tampa, FL. The task work order is part of Contract No. CAT75 and specifically focuses on a corridor safety study for SR 9 / I-95 from Turnpike Overpass Bridge to N. of Graham Road in St. Lucie County, Florida.
The task work order authorizes Volkert to perform a Limited Access Safety Study with a total compensation amount of $33,605.70, to be paid on a lump sum basis based on percentage of completion. The study will focus on analyzing fatalities and serious injuries along the specified corridor, involving field reviews during weekday peak hours, nighttime corridor assessments, review of FDOT projects and studies, crash data analysis from 2019-2023, and development of safety countermeasures. The deliverables include a draft technical memorandum with various components such as field review summaries, crash analyses, recommended safety improvements, and a final report to be submitted to FDOT. The study is set to be completed by 7/17/2029, with a Tier 1 Technical Memo Draft due on 5/2/2025.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-550000-CAL96-W0020100.pdf | ||
| CN-550000-CAL96.pdf | ||
| CN-550000-CAT75-00030000.pdf | ||
| CN-550000-CAT75-00040000.pdf | ||
| CN-550000-CAT75-00060000.pdf | ||
| CN-550000-CAT75.pdf | ||
| CN-550000-CAT75-00020000.pdf | ||
| CN-550000-CAT75-00070000.pdf | ||
| CN-550000-CAT75-00080000.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
TASK WORK ORDER FOR PROFESSIONAL SERVICES
375-030-25
PROCUREMENT
06/17
Consultant:
Address:
Date:
7/17/2029
*Limiting or Estimating/Budgeted Amount.
Distribution:
Task Work Order No.:
Contract No.: Payment FM No.:
CAT75 44805813201
$168,309.70
(name) (title) Signature
David Moore Project Manager
Other Notes:
An independent assessment of the staff hours and quantities for the proposed services has been performed, and found to be fair, reasonable, and competitive.
(LS2) Lump sum paid based on % of completion
Page 1 Total
Page 2 thru 6 Subtotal
Total
Safety Study
Volkert, Inc.
1408 N Westshore Blvd Tampa, FL 33607 Phone (954) 406-6339
(To be entered upon execution of T.W.O.)
Brief Task Description:
In accordance with the above referenced contract, you are authorized to perform the tasks detailed in attached Exhibit A (Scope of Services).
Compensation elements are as follows:
Element Description Amount Est*Method of Compensation
The total amount or the limiting amount of the compensation will be:
All services required under this Task Work Order will be completed on or before:
$33,605.70
$33,605.70
As part of this Task Work Order, Volkert will perform a corridor safety study on SR-9 (I-95) Turnpike Overpass Bridge (MP 13.915) to N of Graham Rd (MP 16.394) in St.
Lucie County.
Signature
Senior Vice President
$33,605.70
$0.00
(name) (title)
David N. McFarlin
$33,605.70
Tier 1 Tech Memo Draft Due Date: 5/2/2025
Total authorizations to date (including this one):
Departmental Approval:
Consultant Acceptance:
o
File details come from the government source that posted it. Updated .