This document is a Task Work Order for Professional Services issued by the Florida Department of Transportation (FDOT) to BCC Engineering, LLC, a consulting firm located in Miami, Florida. The task work order is associated with Contract No. CAT47 and Payment FM No. 45354613201, specifically focused on bridge repair design for SR 85 Eglin Parkway in Okaloosa County, Florida, involving Bridge Nos. 570017 and 570018.

The task work order authorizes BCC Engineering to provide detailed plans and technical specifications for bridge repair and rehabilitation, including installing structural pile jackets with cathodic protection, sealing cracks in the superstructure and substructure, and repairing spalled and delaminated areas. The total compensation for these services is limited to $246,709.00, with the work to be completed by 12/31/2025. The consultant is required to submit 60%, 100%, and final plans to FDOT for review, following AASHTO LRFD Bridge Design Specifications and FDOT Structures Manual. The project will be prepared in English Units, with maintenance of traffic plans included as needed.

View the file

Other files

File Type Posted
CN-550000-CAT47-00030000.pdf PDF
CN-550000-CAT47-00040000.pdf PDF
CN-550000-CAT47-W0040000.pdf PDF
CN-550000-CAT47.pdf PDF
CN-550000-CAT47-00050000.pdf PDF
CN-550000-CAT47-00060000.pdf PDF
CN-550000-CAT47-W0030000.pdf PDF
CN-550000-CAA09-00110000.pdf PDF
CN-550000-CAT47-W0010000.pdf PDF
ContractBudgetExport.csv CSV file
CN-550000-CAT47-00020000.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION

TASK WORK ORDER FOR PROFESSIONAL SERVICES

375-030-25

PROCUREMENT

08/21

Consultant:

Address:

Date:

12/31/2025

*Limiting or Estimating/Budgeted Amount.

Distribution:

Consultant Acceptance:

Signature

Financial Services PSU Pascarelli-Mathews Consultant PM-Jason Gentry Sarah Evans/Whit Pettis

Director of Structures

$246,709.00

$0.00

(name) (title)

Danny Raymat

$246,709.00

Encumber by task

Total authorizations to date (including this one):

Departmental Approval:

$246,709.00 Limit

D/W Bridge Repair Design for SR 85 Eglin Parkway over Cinco & Garniers Bayou Bridge Nos. 570017 & 570018 Okaloosa county (scope of services attachment )

BCC Engineering, LLC

6401 SW 87th Avenue, Suite 200, Miami, Florida 33173

(To be entered upon execution of T.W.O.)

Brief Task Description:

In accordance with the above referenced contract, you are authorized to perform the tasks detailed in attached Exhibit A (Scope of Services).

Compensation elements are as follows:

Element Description Amount Estimate/LimitMethod of Compensation

The total amount or the limiting amount of the compensation will be:

All services required under this Task Work Order will be completed on or before:

$246,709.00

(LA4) Units worked at loaded billing rates in Table 6

Page 1 Total

Page 2 thru 6 Subtotal

Total

Basic Services

$277,198.00

(name) (title) Signature

Jason D. Peters, P.E. Director Of Transportation Operations

Other Notes:

An independent assessment of the staff hours and quantities for the proposed services has been performed, and found to be fair, reasonable, and competitive.

Task Work Order No.:

Contract No.: Payment FM No.:

CAT47 45354613201

Docusign Envelope ID: 1F9F41CD-498E-4646-85B7-B9FC724B0ACF

10/4/2024

Florida Department of Transportation

RON DESANTIS

GOVERNOR

1074 Highway 90 Chipley, FL 32428

JARED W. PERDUE, P.E.

SECRETARY

www.fdot.gov

SCOPE OF WORK

FM No. 453546-1

SR85 Eglin Parkway Over Cinco & Garniers Bayou Bridge Nos. 570017 & 570018

Okaloosa County

Provide plans and specifications for bridge repair and rehabilitation as described below:

1. Detailed plans and technical specifications for installing structural pile jackets with cathodic protection on several piles within the intermediate bents and sealing cracks within both the superstructure and substructure.

2. Detailed plans and technical specifications for repairing spalled and delaminated areas throughout the structure.

3. Maintenance of traffic plans as needed.

4. Bridge Plans shall include: Cover Sheet, Project Location Map, Scope of Work, General

Notes, EQ Report and Pay Item Notes, and any details necessary to produce a workable set of plans.

5. Consultant shall provide Phase II plans, Phase IV plans and Shelf submittals to the department for review.

The plans and specifications shall be prepared according to the current Design Manual. Bridge design shall be in accordance with AASHTO LRFD Bridge Design Specifications and FDOT

Structures Manual.

A copy of the Sunshine 811 ticket listing all utility owners within the project limits shall be provided within 10 days of NTP as part of all subsequent phase submittals. The Consultant shall provide 60%, 100% and final plans to the Department for review. The Consultant’s work estimate and fee proposal shall include the proposed time required for completion of the project. Plans shall be prepared in English Units.

October 1, 2024