CN-550000-CAP46-00030000.pdf
PDF 71 KB Posted
- Contract number
- CAP46
- Issued by
- Florida
About this file
This document is an Authorization of Optional Services letter from the Florida Department of Transportation (FDOT), issued to The Corradino Group, Inc., a transportation consulting firm located in Fort Lauderdale, Florida. The letter is signed by FDOT representatives including Stacey Sasala, Construction Support Manager, and Mark J. Moshier, Construction Senior Project Manager, under the leadership of Governor Ron DeSantis and FDOT Secretary Jared W. Perdue.
The authorization is for Contract Number CAP46, specifically for Construction Engineering and Inspection (CEI) services related to the I-95 Interchange project at SW 10th Street, including the area from SW 10th Street to west of Military Trail. The total authorized amount for these optional services is $853,895.30, which was established based on rates included in Table 6 of the original contract. The services will commence upon the consultant's acceptance of the letter, with payment structured as a maximum limiting amount for CEI staff hours. The document is dated 02/12/2025 and includes signatures from both FDOT and The Corradino Group representatives, indicating mutual agreement on the scope and terms of the optional services.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-550000-CAP46-00020000.pdf | ||
| CN-550000-CAP46-00040000.pdf | ||
| CN-550000-CAO64-00120000.pdf | ||
| CN-550000-CAP46-00050000.pdf | ||
| CN-550000-CAP46-00060000.pdf | ||
| CN-550000-CAP46-00010000.pdf | ||
| CN-550000-CAP46.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Department of Transportation
RON DESANTIS
GOVERNOR
Element Description CEI staff hours
5548 NW 9th Avenue Fort Lauderdale, FL 33309
Compensation Element Maximum Limiting Amount
JARED W. PERDUE, P.E.
SECRETARY
Amount $853,895.30
Approved by:
Mark J. Moshier
Signature: ____________________________ Stacey Sasala Construction Support Manager
Construction Senior Project Manager
Consultant Acceptance:
Paul A. Lampley Eduardo Perez Director of Transportation Operations Senior Vice President cc: Financial Services Office, Procurement Office, File www.fdot.gov | www.d4fdot.com
Mr. Eduardo Perez The Corradino Group, Inc.
5200 NW 33rd Avenue, Suite 203 Fort Lauderdale, Fl 33309
RE: Authorization of Optional Services No. 1 Contract Number: CAP46 Financial Project No.: 436964-2-62-01 Description: CEI Services for I-95 Interchange at SW 10th Street, Including SW 10th Street to W of Military Trail
In accordance with the activities outlined in Exhibit “A” of Contract CAP46, Pages A-4 – A- 40, your firm is hereby authorized to proceed with work, as outlined in the attached scope of services.
The total authorized amount for these optional services is $853,895.30. This amount was established based on rates included in Table 6 of the contract. The method of payment for these services is as follows:
Services shall begin upon your acceptance of this letter. Should you have any questions or need additional information, please contact me at 954-958-7675 or via email at Stacey.Sasala@dot.state.fl.us.
Docusign Envelope ID: FD3A9236-CE8F-46DB-8028-2E690E6F8D0A
02/12/2025 | 2:07 PM EST
File details come from the government source that posted it. Updated .