This document is a Task Work Order (TWO) for Professional Services issued by the Florida Department of Transportation (FDOT) District Five to Kittelson & Associates, Inc., located in Orlando, Florida. The task work order is part of Contract No. CAN55, a districtwide traffic safety studies and highway design contract with a total budgetary ceiling of $1,500,000.00, awarded through a Request for Proposal process.

The specific task work order (TWO 1.0) focuses on Highway Safety Improvement Program (HSIP) Project Identification, with a total authorized amount of $63,942.98. The scope of services involves conducting planning-level evaluations of up to eighteen safety-related projects across multiple categories, including midblock crossing screenings, access management project screenings, off-system project screenings for run-off road crashes, and intersection improvement project screenings. The project aims to identify and analyze potential safety improvements with a benefit-to-cost ratio of 2.0 or higher, utilizing historical crash data, GIS layers, and various analytical methodologies. The consultant will produce a list of up to ten projects with the highest benefit-to-cost ratios and develop a summary memo with project maps within fourteen weeks of receiving the notice to proceed.

View the file

Other files

File Type Posted
CN-550000-CAN55-00050000.pdf PDF
CN-550000-CAN55-W0020000.pdf PDF
CN-550000-CAN55-W0030000.pdf PDF
ContractBudgetExport.csv CSV file
CN-550000-CA835-W0010000.pdf PDF
CN-550000-CAN55-00020000.pdf PDF
CN-550000-CAN55-00040000.pdf PDF
CN-550000-CAN55-00060000.pdf PDF
CN-550000-CAN55-W0030100.pdf PDF
CN-550000-CAN55-00030000.pdf PDF
CN-550000-CAN55.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION

TASK WORK ORDER FOR PROFESSIONAL SERVICES

375-030-25

PROCUREMENT

08/21

Consultant:

Address:

Date:

9/1/2025

*Limiting or Estimating/Budgeted Amount.

Distribution:

Task Work Order No.:

Contract No.: Payment FM No.:

CAN55 237995-1-32-22

(name) (title) Signature

Loreen Bobo District 5 Safety Administrator

Other Notes:

An independent assessment of the staff hours and quantities for the proposed services has been performed, and found to be fair, reasonable, and competitive.

(LS2) Lump sum paid based on % of completion

Page 1 Total

Page 2 thru 6 Subtotal

Total

Safety Study Analysis Services

Kittelson & Associates, Inc.

225 East Robinson street, Suite 355 Orlando Florida 32801

(To be entered upon execution of T.W.O.)

Brief Task Description:

In accordance with the above referenced contract, you are authorized to perform the tasks detailed in attached Exhibit A (Scope of Services).

Compensation elements are as follows:

Element Description Amount Estimate/LimitMethod of Compensation

The total amount or the limiting amount of the compensation will be:

All services required under this Task Work Order will be completed on or before:

$63,942.98

$63,942.98 Limit

The consultant will provide analysis for potential Safety Study candidates

FDOT PM: Tony Nosse

Signature

Kittelson & Associates, Inc. / FDOT

Senior Principal Planner

$63,942.98

$0.00

(name) (title)

Jane Lim-Yap

$63,942.98

Total authorizations to date (including this one):

Departmental Approval:

Consultant Acceptance:

$63,942.98

DocuSign Envelope ID: 8436C7BA-4B58-41B9-9A04-B2FA4AFC974C

09/14/2023 | 12:34 PM EDT

FDOT D5 Safety Studies and Minor Design Contract CAN55 TWO 1 KAI Project #: 28674 Task 1 August 3, 2023 Page 1

FDOT District Five – Safety Studies and Minor Design Contract No. CAN55

Date: August 3, 2023 KAI Project #: 28674 Task 1

To: Yvonne Broxton Florida Department of Transportation District Five 719 S. Woodland Blvd, DeLand, FL 32720

From: Nathan Kautz, Jane Lim-Yap Project: FDOT D5 Safety Studies and Minor Design Contract CAN55 TWO 1 Subject: HSIP Project Identification

BACKGROUND

The scope of services has been developed to assist the Florida Department of Transportation (FDOT) District Five, Safety Office in conducting a planning level evaluation of up to eighteen (13) projects to determine if each project can meet a B/C of 2.0 or more, qualifying for HSIP funding, including:

Midblock Crossing Project Screening – up to three (3) projects Access Management Project Screening – up to three (3) projects Off-System Project Screening – up to four (4) corridor lane departure type safety projects Intersection Improvement Project Screening – up to three (3) projects

SCOPE

The intent of this task is to provide the District with ten (10) projects that are good candidates for further study and have a reasonable expectation of a B/C of greater than 2.0. Kittelson & Associates, Inc. (KAI) proposes to conduct the following planning level evaluations of up to eighteen (18) projects to determine if each project can meet a B/C of 2.0 or more. The three (3) additional locations are included in the instance that we perform an evaluation and do not predict an appropriate B/C. It should be noted that the number of locations evaluated in this task will not exceed eighteen (13) in the instance less than ten

(10) locations are identified with an expected B/C over 2.0.

Task 1 – Meetings Kittelson staff will attend up to two project meetings with FDOT D5 staff to discuss results of the evaluations. Meetings are anticipated to be up to 1-hour in length and be conducted virtually. The purpose of the meetings will be to provide preliminary location lists.

Task 2 – Midblock Crossing Project Screening Conduct a planning level screening of Seminole and Osceola Counties using Streetlight data through MetroPlan Orlando to identify candidate midblock crossing locations. A detailed screening has been completed in Orange County through FDOT Central Office. The Orange County screening results will be

August 3, 2023 Page 2 provided to FDOT D5 as part of Task 2. The additional screening of Seminole and Osceola Counties is intended to provide similar results but using a “higher-level” methodology.

Task 2.1 – Data Collection Collect Streetlight data for Seminole and Osceola Counties from MetroPlan Orlando.

Collect historical pedestrian crash data in Seminole and Osceola Counties from Signal Four Analytics for 2018-2022.

FDOT Central Office Pedestrian Statewide Network Screening Results MetroPlan Orlando pedestrian crash typing data Collect the following GIS layers from FDOT RCI:

o SHS o Posted Speed o Number of Lanes o Traffic Signals o Context Classification

Collect transit data through General Transit Feed Specification (GTFS).

Existing crossing locations layer from FSU/FAMU.

FDOT historical and future 5-Year Work Program

Task 2.2 – GIS Midblock Crossing Project Evaluation Identify SHS segments with more than ¼ mile between traffic signals and/or midblock crossings and with transit present along the segment and no existing midblock crossing.

Join historical crash data to the ¼ miles segments.

Other data that maybe be used to identify potential crossing locations includes:

o FDOT CO Pedestrian Statewide Network Screening Results o MetroPlan Orlando 2019 crash typing o MetroPlan Streetlight data o Socioeconomic data o Land use data o Transit data

Rank ¼ mile segments based on number of historical pedestrian crashes.

Compare project locations to the 5-year work program for overlap. Information used for programming recommendations and possible timeline of additional analysis.

Task 2.3 – Evaluation and Review Identify top two (2) ¼ mile segments with the most pedestrian crashes and pedestrian use according to Streetlight.

Review top two (2) segments using aerial and street view imagery to verify that each segment is a good midblock crossing candidate (e.g. attractors and generators present). Conduct a planning level review to determine if each location meets requirements set by the FDOT TEM.

August 3, 2023 Page 3

Identify midblock crossing improvement type (e.g., RRFB, HAWK, Ped Signal).

Task 2.4 – Planning Level Benefit/Cost Analysis Conduct a planning level B/C analysis. The benefit will be determined based on an anticipated reduction in crashes using historical crashes and the identified improvement. The cost will be determined using historical project level cost data from past similar construction projects completed in the District. Assumed construction costs will be grown by 20% for individual items, with a 30% overall contingency, to account for current market fluctuations. Planning level concepts and cost estimates will not be developed as part of this evaluation. The potential project will be evaluated to determine if the potential improvement is expected to meet a B/C of 2.0 or more. If one of the top two (2) projects does not meet the B/C of 2.0, the next highest ranked location will be evaluated. B/C analyses will be conducted at up to three (3) locations.

Task 3 – Access Management Project Screening Conduct a planning level screening of five-lane and seven-lane undivided sections and 4-lane and 6-lane divided sections in C3 contexts for high concentrations of F&SI left-turn, angle, and head-on crashes in D5.

Task 3.1 – Data Collection Collect historical crash data in District 5 from Signal Four Analytics for 2018-2022.

Collect the following GIS layers from FDOT RCI:

o SHS o Context Classification o Number of Lanes o Median Type o Access Management Classification

Task 3.2 – GIS Access Management Project Evaluation Develop segmentation of 1-mile segments on C3 context SHS roadways.

Join historical crash data to 1-mile segments.

Rank 5 and 7-lane undivided 1-mile segments based on number of F&SI left-turn, angle, and head-on crashes.

Rank 4 and 6-lane divided 1-mile segments based on number of F&SI left-turn, angle, and head-on crashes.

Compare project locations to the 5-year work program for overlap.

Task 3.3 – Evaluation and Review Identify top 1-mile segment with the most F&SI left-turn, angle, and head-on crashes on 5 and 7-lane undivided roadways.

August 3, 2023 Page 4

Identify top 1-mile segment with the most F&SI left-turn, angle, and head-on crashes on 4 and 6-lane divided roadways that do not meet access spacing standards based on each roadway’s access classification. Access spacing check will be conducted through an aerial imagery review.

Identify access management improvement type for 5 and 7-lane undivided roadways through street view and aerial imagery review (e.g., left-turn lane, closing access). Corridor will also be evaluated manually to determine if the limits are sensible or should be expanded/contracted.

Identify access management improvement type for 4 and 6-lane divided roadways through street view and aerial imagery review (e.g., left-turn lane, closing access). Corridor will also be evaluated manually to determine if the limits are sensible or should be expanded/contracted.

Task 3.4 – Planning Level Benefit/Cost Analysis reduction in crashes using historical crashes and the identified improvement. The cost will be determined using historical project level cost data from past similar construction projects completed in the District. Assumed construction costs will be grown by 20% for individual items, with a 30% overall contingency, to account for current market fluctuations. Planning level concepts and cost estimates will not be developed as part of this evaluation. The potential project will be evaluated to determine if the potential improvement is expected to meet a B/C of 2.0 or more. If one of the top 5 and 7-lane undivided or 4 and 6-lane divided projects does not meet the B/C of 2.0, the next highest ranked location will be evaluated. B/C analyses will be conducted for up to three (3) segments.

Task 4 – Off-System Project Screening Conduct a planning level screening of Lake, Sumter, and Marion Counties for high concentrations of F&SI run off road crashes.

Task 4.1 – Data Collection Collect historical crash data in Lake, Sumter, and Marion Counties from Signal Four Analytics for 2018-2022.

Evaluate if FDOT RCI can assist. If it can, collect the following GIS layers from FDOT RCI:

o SHS

Lake, Sumter, and Marion Counties’ TIP

Task 4.2 – GIS Off-System Project Evaluation Develop segmentation of 1-mile segments on non SHS roadways.

Join historical crash data to 1-mile segments.

Rank 1-mile segments based on number of F&SI run off road crashes.

Compare project locations to the TIP. Locations will be excluded if currently on the TIP if it can be reasonably assumed that the TIP project will address the safety issue.

August 3, 2023 Page 5

Task 4.3 – Evaluation and Review Identify top one (1) segment in Lake, Sumter, and Marion Counties with the most F&SI run off road crashes.

Identify roadway improvement type through street view and aerial imagery review (e.g. rumble strips).

Task 4.4 – Planning Level Benefit/Cost Analysis reduction in crashes using historical crashes and the identified improvement. The cost will be determined using historical project level cost data from past similar construction projects completed in the District. Assumed construction costs will be grown by 20% for individual items, with a 30% overall contingency, to account for current market fluctuations. Planning level concepts and cost estimates will not be developed as part of this evaluation. The potential project will be evaluated to determine if the potential improvement is expected to meet a B/C of 2.0 or more. If one of the top locations does not meet the B/C of 2.0, the next highest ranked location will be evaluated. B/C analyses will be conducted at up to four (4) intersections.

Task 5 – Intersection Improvement Project Screening Conduct a planning level screening for high concentrations of F&SI rear end, angle, and left-turn crashes at unsignalized intersections on rural 2-lane SHS roadways.

Task 5.1 – Data Collection Collect historical crash data in District 5 from Signal Four Analytics for 2018-2022.

Collect the following GIS layers from FDOT RCI:

o SHS o Number of Lanes o Traffic Signals o Urban Areas

Task 5.2 – GIS Intersection Improvement Project Evaluation Identify unsignalized intersections in rural areas on 2-lane SHS roadways.

Join historical crash data to intersections that occurred within a 250’ radius of the intersection.

Rank intersections based on number of F&SI, rear end, angle, and left-turn crashes.

Compare project locations to the 5-year work program for overlap.

Task 5.3 – Evaluation and Review Identify top two (2) intersections with the most F&SI rear end, angle, and left-turn crashes.

Identify intersection improvement type through street view and aerial imagery review (e.g. traffic signal, turn lanes, access management).

August 3, 2023 Page 6

Task 5.4 – Planning Level Benefit/Cost Analysis reduction in crashes using historical crashes and the identified improvement. The cost will be determined using historical project level cost data from past similar construction projects completed in the District. Assumed construction costs will be grown by 20% for individual items, with a 30% overall contingency, to account for current market fluctuations. Planning level concepts and cost estimates will not be developed as part of this evaluation. The potential project will be evaluated to determine if the potential improvement is expected to meet a B/C of 2.0 or more. If one of the top two (2) projects does not meet the B/C of 2.0, the next highest ranked location will be evaluated. B/C analyses will be conducted at up to three (3) intersections.

Task 6 – Documentation

Task 6.1 – Project List Development Compare project lists from Tasks 2-5 to develop a list of up to ten projects with the highest B/C ratios.

Task 6.2 – Memo Development Develop memo including maps of up to ten projects to summarize the network screening results.

SCHEDULE

The Consultant will produce the first draft of the list of projects within fourteen (14) weeks of receiving notice to proceed (NTP).

FEE

The details of the estimated staff hours and fees for this task are attached.

August 3, 2023 Page 7

EXHIBIT I – PROJECT BUDGET

ST

AN

D

AR

D F

EE

S U M M

AR

Y

SH

EE

T

TW

O 1:

H

SI

P Pr oj ec t I de nt ifi ca tio n

N am e of F irm Ki tt el so n A ss oc ia te s, In c.

TO

TA

L

CO

ST

B Y

Ta sk

RA

TE

3.

RA

TE

7.

4.

5.

HO

U

RS

AC

TI

VI

TY

Ta sk

M ee tin gs

2.

6.

1.

1, 0.

Pr ep ar e fo r / a tt en d m ee tin gs w ith F

DO

T D5 S ta ff

2.

6.

1.

Ta sk

M id bl oc k Cr os si ng P ro je ct s S cr ee ni ng

7.

2, 4.

6, 9.

,5 .2

,6 .7

2.

Da ta C ol le ct io n

6.

4.

G

IS

M id bl oc k Cr os sin g Pr oj ec t E va lu at io n

4.

8.

5, 6.

Ev al ua tio n an d Re vi ew

3.

9.

4.

7.

Be ne fit /C os t A na ly sis

3.

9.

0.

7.

Ac ce ss M an ag em en t P ro je ct s S cr ee ni ng

7.

4.

2.

3.

9, 7.

3.

Da ta C ol le ct io n

8.

3.

G

IS

A cc es s M an ag em en t P ro je ct E va lu at io n

4.

6.

8.

Ev al ua tio n an d Re vi ew

3.

4.

4.

5.

Be ne fit /C os t A na ly sis

3.

4.

4.

5.

O ff -S ys te m P ro je ct S cr ee ni ng

7.

9.

3, 8.

2.

9, 7.

4.

Da ta C ol le ct io n

8.

3.

G

IS

O ff- Sy st em P ro je ct E va lu at io n

4.

6.

4.

Ev al ua tio n an d Re vi ew

3.

2.

2.

Be ne fit /C os t A na ly sis

3.

2.

2.

3.

In te rs ec tio n Im pr ov em en t P ro je ct S cr ee ni ng

7.

4.

2.

4, 7.

,1 .8

5.

Da ta C ol le ct io n

2.

5.

G

IS

In te rs ec tio n Im pr ov em en t P ro je ct E va lu at io n

4.

6.

4.

Ev al ua tio n an d Re vi ew

3.

9.

4.

Be ne fit /C os t A na ly sis

3.

9.

0.

7.

D oc um en ta tio n

4.

6.

0.

6, 1.

6.

Pr oj ec t L ist D ev el op m en t

4.

6.

5.

6.

M em o De ve lo pm en t

9.

0.

4.

oj ec t M an ag em en t

8.

2.

7.

4, 8.

TO

TA

L

PR

O

JE

CT

2, 8.

,4 .5

,7 .2

,3 .4

,9 .9

Pe rc en ta ge o f p ro je ct h ou rs

2%

0%

Ta sk W or k O rd er T ot al

,9 .9 oj ec t M an ag er

En gi ne er

En gi ne er in g In te rn

Ch ie f E ng in ee r 1

FLORIDA DEPARTMENT OF TRANSPORTATION

FUNDS APPROVAL

CAN55

9/14/2023

CONTRACT INFORMATION

FUNDS APPROVAL INFORMATION

FUNDS APPROVED/REVIEWED FOR ROBIN M. NAITOVE, CPA, COMPTROLLER ON 9/14/2023

Action: Task Work Order

Reviewed or Approved: APPROVED

Organization Code: 55053010541

Expansion Option: AJ

Object Code: 131500

Amount: $63,942.98

Financial Project: 23799513222

Work Activity (FCT): 011

CFDA:

Fiscal Year: 2024

Budget Entity: 55100100

Category/Category Year: 088849/24

Amendment ID: W001

Sequence: 00

User Assigned ID: TW1.0

Enc Line (6s)/Status: 0001/04

Total Amount: $63,942.98

Contract: CAN55

Contract Type: CA - ENGINEERING (ENGINEER)

Vendor Name: KITTELSON & ASSOCIATES INC

Vendor ID: F930964447001

Beginning Date of This Agreement: 04/27/2023

Ending Date of This Agreement: 04/26/2028

Contract Total/Budgetary Ceiling: bc = $1,500,000.00

Method of Procurement: C - REQUEST FOR PROPOSAL (287.55,F. S.)

Description: Districtwide Traffic Safety Studies & Highway Design 02

Page1 of 1

To: Meagan.Prugh@dot.state.fl.us

DocuSign Envelope ID: D8A2F845-B4D5-489E-9A57-027E99928215DocuSign Envelope ID: 8436C7BA-4B58-41B9-9A04-B2FA4AFC974C

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION

FUNDING AUTHORIZATION INCREASE

375-030-89

PROCUREMENT

04/22 www.fdot.gov

719 S. Woodland Blvd.

DeLand, FL 32720

Nathan Kautz Kittelson & Associates, Inc.

225 East Robinson Street, Suite 355 Orlando, FL 32801

RE: Contract Number: CAN55 LOA 1 - TWO 1.0

Funding Authorization Number 237995-1-32-22

Dear Nathan Kautz:

Contract No. CAN55 is funded by multiple appropriations. Previously, only $0.00 of the total contract budgetary ceiling amount of $1,500,000.00 had been approved for contract expenditures.

As of the above date, an additional $63,942.98 has now been approved for the subject contract.

In accordance with Contract No. CAN55, the total approved funding is $63,942.98.

If there are any questions regarding this Authorization to Incur Additional Charges, please contact Yvonne Broxton at 386-943-5335.

Sincerely, Meagan Prugh cc: Procurement Office FDOT Financial Services Office Yvonne Broxton

DocuSign Envelope ID: D8A2F845-B4D5-489E-9A57-027E99928215

09/14/2023 | 10:40 AM EDT

CAN55_ 237995-1-23-22_TWO 1 draft Safety Analysis draft
TWO 1 draft
Scope and fee TWO 1 draft
ENCumbrance TWO 1
CAN55 LOA 1 - TWO 1.0

File details come from the government source that posted it. Updated .