This document is a Task Work Order for Professional Services issued by the State of Florida Department of Transportation (FDOT), specifically for District Two. The contract is with Metric Engineering, Inc., located in Chipley, FL, for professional services supporting the department's Planning Department. The task work order (TWO) No. 2 is associated with Contract No. CAN49 and focuses on urban and rural counties trail rehabilitation study.

The task work order authorizes Metric Engineering to perform services including inventory of existing trail infrastructure, analysis of current trail conditions, and prioritization of trail rehabilitation needs, with a specific focus on trails within Nassau County. The total compensation is limited to $187,500.00, to be completed by 4/5/2028, with compensation based on loaded billing rates outlined in a detailed fee computation table. The scope involves data collection activities such as creating video logs of trails, supporting environmental impact studies, performing pedestrian traffic counts, and providing recommendations for trail maintenance and rehabilitation, utilizing various staff classifications including Project Managers, Engineers, GIS Specialists, and Technicians.

View the file

Other files

File Type Posted
CN-550000-CAN49-W0030000.pdf PDF
CN-550000-BE138-00120000.pdf PDF
CN-550000-CAN49.pdf PDF
ContractBudgetExport.csv CSV file
CN-550000-CAN49-W0010000.pdf PDF
CN-550000-CAN49-W0040000.pdf PDF
CN-550000-CAN49-W0050000.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION

TASK WORK ORDER FOR PROFESSIONAL SERVICES

375-030-25

PROCUREMENT

08/21

Consultant:

Address:

Date:

4/5/2028

*Limiting or Estimating/Budgeted Amount.

Distribution:

Consultant Acceptance:

Signature

Vice President

$187,500.00

$0.00

(name) (title)

Amy Wiwi, GISP

$187,500.00

The services for this Task Work Order shall be completed by the date specified above; however, this Task Work Order shall remain open for the duration of this contract.

Any rates specified in the original agreement may be used on this Task Work Order.

Total authorizations to date (including this one):

Departmental Approval:

$187,500.00 Limit

INVENTORY EXISTING TRAIL INFRASTRUCTURE, ANALYZE CURRENT TRAIL CONDITIONS, AND PRIORITIZE TRAIL REHABILITATION NEEDS BASED UPON

USE AND QUALITY METRICS. THIS TWO WILL INCLUDE TRAIL FACILITIES ON THE SUNTRAIL NETWORK, AND/OR FACILITIES PREVIOUSLY OR

CURRENTLY PLANNED TO BE FUNDED BY THE DEPARTMENT. THIS TWO INCLUDES TRAILS WITHIN AND OF IMPORTANCE TO THE FOLLOWING

COUNTY: NASSAU

Metric Engineering, Inc.

1343 Brickyard Rd

Chipley, FL 32428

(To be entered upon execution of T.W.O.)

Brief Task Description:

In accordance with the above referenced contract, you are authorized to perform the tasks detailed in attached Exhibit A (Scope of Services).

Compensation elements are as follows:

Element Description Amount Estimate/LimitMethod of Compensation

The total amount or the limiting amount of the compensation will be:

All services required under this Task Work Order will be completed on or before:

$187,500.00

(LA4) Units worked at loaded billing rates in Table 6

Page 1 Total

Page 2 thru 6 Subtotal

Total

General Support

(name) (title) Signature

Scott Clayton Project Manager

Other Notes:

An independent assessment of the staff hours and quantities for the proposed services has been performed, and found to be fair, reasonable, and competitive.

Task Work Order No.:

Contract No.: Payment FM No.:

CAN49 439181-3-22-01

DocuSign Envelope ID: 06B75098-FB0E-458B-9417-3D22B8DE5B94

06/19/2023 | 9:43 AM PDT

EXHIBIT “A”

SCOPE OF SERVICES

STAGE 3

FINANCIAL PROJECT ID#’s:

439181-2-22-01 439181-3-22-01 439181-4-22-01 439181-5-22-01 439181-6-22-01 439181-7-22-01

DESCRIPTION:

URBAN AND RURAL COUNTIES TRAIL REHABILITAION STUDY

DocuSign Envelope ID: 1AFFD582-03C0-4838-9261-2BE9ACA21E09DocuSign Envelope ID: 06B75098-FB0E-458B-9417-3D22B8DE5B94

A1

Exhibit “A”

Scope of Services/Stage 3

URBAN AND RURAL COUNTIES TRAIL REHABILITAION STUDY

Financial Project ID#s. 439181-2-22-01, 439181-3-22-01, 439181-4-22-01, 439181-5-22-01, 439181-6-22-01, 439181-7-22-01

1.0 PURPOSE:

The Department requires the professional services of a Consultant to act as an extension of the Department by providing technical personnel to perform services to support the Planning Department, specifically related to data collection and condition of roadways or shared use trails which are located on and off the State Highway System within District Two. The work will involve data collection and reporting for the following areas: Roadway Characteristics Inventory, Base Mapping, Trail Condition, and other related incidental tasks that may be assigned; PD&E services including design and Environmental Impact Studies. The Department will provide a project manager for this contract. The Consultant shall minimize the Department’s need to apply its own resources to work performed under this contract.

The Consultant’s work will be managed by the Department’s Project Manager. All work performed under this contract is located within the 18-county area of District 2. Consultant staff may be required at times to be physically located in the Lake City District Office working directly with Department staff to perform the tasks in this contract. An in-district office will be advantageous.

2.0 REFERENCES

Transportation Statistics Roadway Characteristics Handbook: This Handbook is published by and available from the Department

Multimodal Data Inventory Evaluation to Improve FDOT’S RCI Classification Inventory

Quality Assurance Monitoring Plan

Topic No.: 525-020-310 General Interest Roadway Data

References shall be to the latest editions and as may be updated during the course of this contract.

3.0 SERVICES:

The following types of work elements will be assigned under the terms of this agreement:

A. SHARED USE TRAIL CHARACTERISTICS INVENTORY AND DATA COLLECTION:

1. Perform an inventory of the general interest data for all trails State Owned or Local Government Owned in accordance with the Handbooks and District Guidance. Update the required physical features for the Trails in RCI within 30 days of inventory. Retain documentation for 10 years.

2. Resolve any discrepancies found in RCI within 30 days of notification of discrepancies.

3. Provide support to the District Project Manager as may be required for the District to meet its responsibilities for data collection, Quality Assurance Review’s, District Quality Evaluations, and requisite reporting.

DocuSign Envelope ID: 1AFFD582-03C0-4838-9261-2BE9ACA21E09DocuSign Envelope ID: 06B75098-FB0E-458B-9417-3D22B8DE5B94

A2

4. Create a Video Log of all Trails. The Department shall have access to Video Logs of inventories at any time. Retain Video Logs for 10 years.

5. Provide support to the Department for Environmental Impact Studies and PD&E services for shared use trails in the District.

6. Pedestrian traffic counts may be required to prioritize trail rehabilitation projects.

7. Provide recommendations to the Department for MRP compliance on all Trails in District 2.

The data to be collected under this task may include but is not limited to the following data characteristics: pavement condition, pavement widths, shoulder types and widths, intersection names and location, bridge number and locations, etc. Features collected will have a focus on Maintenance and Planning RCI Features and Characteristics. When possible, inventory will be done in county-by-county clusters or as determined by the Project Manager.

B: BASE MAPPING:

1. The Consultant may be required to assist in updating the GIS Linear Referencing System for the 18 counties within District Two. The Consultant will provide supporting documentation, maps, and update the RCI database.

4.0 EQUIPMENT:

The Consultant may be required to perform the above data collection activities using the following equipment: a vehicle equipped with a Global Positioning System (GPS), Distance Measuring Instrument, measuring wheel, 100-foot measuring tape, Video Logging hardware with necessary software, and other items necessary. The vehicle will be required to traverse shared use paths in which pickup trucks or passenger vehicles may not be able to travel. The vehicle must have sufficient seating capacity for consultant staff and QA/QC staff from the Department. All equipment shall be maintained in good working order and recalibrated as necessary to provide accurate data.

5.0 ELECTRONIC MAIL REQUIREMENTS:

The Consultant will be required to have the capabilities of communication with the Department through Electronic Mail (E-Mail).

6.0 SAFETY:

The Consultant will be required to perform the above tasks in adherence to all FDOT safety guidelines, policies, and procedures.

7.0 QUALITY CONTROL:

The Consultant will be required to provide quality control for all data collection activities to ensure that Departmental accuracy standards are maintained, and the data collected is provided to the Department in a timely manner.

The Consultant shall maintain a Quality Control Monitoring Plan. The plan shall be a comprehensive, well defined, written set of procedures and activities designed to produce services and products that meet the Districts accuracy standards. The Consultant shall conduct an on-going Quality Control program to monitor performance.

8.0 SUBCONTRACTING:

DocuSign Envelope ID: 1AFFD582-03C0-4838-9261-2BE9ACA21E09DocuSign Envelope ID: 06B75098-FB0E-458B-9417-3D22B8DE5B94

A3

Services assigned to sub-consultants must be approved in advance by the Department. The sub-consultant must be qualified by the Department to perform all work assigned to them. Additional sub-consultants with specialized areas of expertise may be required by the Department or requested by the Consultant to complete specific Task Work Order assignments. Either the Department or the Consultant may request, in writing, the need to hire the sub-consultant. Before the sub-consultant begins any work, the Department and Consultant Project Managers must agree in writing upon the work assignments to be performed.

9.0 KEY PERSONNEL:

The Consultant’s work shall be performed and directed by key personnel identified in the proposal or Letter of Intent by the Consultant. Any changes in the indicated personnel shall be subject to review and approval by the Department.

10.0 RESPONSIBILITIES OF THE DEPARTMENT:

The Department will provide a Project Manager who shall be responsible for:

A. DEPARTMENT PROJECT MANAGER SHALL:

1. Responsible for day-to-day management of this contract.

2. Define the specific work to be performed and schedule for completion of such work.

3. Agree on the Consultant staffing and availability (including substitutions from the available staffing list provided).

4. Process Consultant invoices for payment.

B. TASK MANAGERS:

The Department will also provide Task Managers, when required, to provide support to the Project Manager for various Tasks.

C. SERVICES AND DATA:

1. The Department will provide all criteria and full information as to the Department’s requirements for consultants and contractor’s services including objectives, constraints, budgetary limitations and time restraints.

2. The Department will furnish all Department procedures, standards, and policies applicable to the services.

3. The Department will furnish maps, drawings, specifications, schedules, reports and other information prepared by and/or for the Department by others which are available to the Department and which the Department considers pertinent to the Consultant’s responsibilities, as described herein.

4. The Department will furnish available traffic, planning, and maintenance data.

11.0 RESPONSIBILITIES OF THE CONSULTANT:

The Consultant shall provide an overall Project Manager who will:

A: CONSULTANT PROJECT MANAGER SHALL:

DocuSign Envelope ID: 1AFFD582-03C0-4838-9261-2BE9ACA21E09DocuSign Envelope ID: 06B75098-FB0E-458B-9417-3D22B8DE5B94

A4

1. Be the primary point of contact for the Consultant for the scope, schedule, work force coordination, negotiation, and completion of all work under this contract.

2. Meet with the Department Project Manager regularly and shall provide weekly Progress Reports. These Progress Reports shall be the basis for evaluation and processing of invoices for payment.

B. LIST OF STAFF CLASSIFICATIONS FOR ASSIGNMENT TO TASK WORK ORDERS:

The Consultant shall provide and maintain a list of staff with the following classifications that are available for assignment to specific Task Work Orders:

1. Project Manager

2. Project Engineer

3. GIS/CADD Specialist

4. Computer Developer

5. Senior Technician

6. Technician

7. Clerical

Any classifications not listed above must be documented and agreed to by the Department’s Project Manager. Rates for all classifications will be negotiated before beginning the contract.

C. PROVIDE SUFFICIENT STAFF:

1. The Consultant shall provide sufficient staff, either the specific staff person requested or acceptable staff at defined levels of expertise as agreed to by the Department’s Project Manager, in a timely manner to complete all assigned work. If, at any time, the Department’s Project Manager determines the number or expertise of particular staff assigned to a specific task is inadequate, the Project Manager shall coordinate with the Consultant Project Manager to remedy the situation to ensure the timely completion of the work.

2. As a minimum, Consultant staff gathering roadway data or inputting data into the RCI database, shall have completed the RCI training course provided by the Department. For any newly hired personnel performing work in the RCI that have not completed RCI training, they shall work under the direction of a trained person until such time as the newly hired personnel has completed RCI training.

3. The Consultant shall do all analyses, develop recommendations, and document all work within the required time schedule of this contract. The Consultant shall develop a work schedule detailing how the work will be accomplished in the prescribed period.

4. The Consultant shall promptly advise the Department if any work may present a conflict of interest or the appearance of conflict, with any other client of the Consultant or affiliated firms.

5. The Consultant will perform all tasks according to all FDOT Guidelines and Standards, applicable Florida Statutes and other state laws and policies.

12.0 COMPUTER SERVICES:

DocuSign Envelope ID: 1AFFD582-03C0-4838-9261-2BE9ACA21E09DocuSign Envelope ID: 06B75098-FB0E-458B-9417-3D22B8DE5B94

A5

A. REQUIRED SOFTWARE:

The Consultant shall be required to use the following software in versions compatible with the District versions:

1. ARCMAP or Equivalent

2. Adobe Illustrator or Equivalent

3. Any other applicable software as may be required to perform the work in this contract.

B. OTHER:

1. Should the Consultant want to use any other Department programs; permission must be granted according to this agreement.

2. Computations based on computer programs other than the Department’s must conform to all Department format requirements.

DocuSign Envelope ID: 1AFFD582-03C0-4838-9261-2BE9ACA21E09DocuSign Envelope ID: 06B75098-FB0E-458B-9417-3D22B8DE5B94

Contract: CAN49 NASSAU

5/30/2023

Basic Staff Hours by Activity Staff Hourly Staff Hourly Staff Hourly Staff Hourly Staff Hourly Staff Hourly Staff Hourly Staff Hourly Staff Hourly Staff Hourly Staff Hourly Staff Hourly Staff Hourly Staff Hourly Staff Hourly Staff Hourly Staff Hourly Staff Hourly Activity Activity

Hours Rate Hours Rate Hours Rate Hours Rate Hours Rate Hours Rate Hours Rate Hours Rate Hours Rate Hours Rate Hours Rate Hours Rate Hours Rate Hours Rate Hours Rate Hours Rate Hours Rate Hours Rate Planning/Feasibility 40 $273.64 $78.08 5 $110.57 $142.90 $233.76 $120.91 10 $90.67 $128.23 140 $130.09 5 $102.83 80 $85.79 10 $286.09 $165.76 0 $258.90 $123.06 $85.53 $164.98 60 $130.09 350 Inventory 60 177 176 36 176 176 801 Inspection 40 10 83 11 4 15 163

QC 20 20 20 20 80

TOTALS Total Total Total Total Total Total Total Total Total Total Total Total Total Total Total Total Total Total Total Total Total Total Total Total Total Total Total Total Total Total Total Total Total Total Total Total S/H Amount S/H Amount S/H Amount S/H Amount S/H Amount S/H Amount S/H Amount S/H Amount S/H Amount S/H Amount S/H Amount S/H Amount S/H Amount S/H Amount S/H Amount S/H Amount S/H Amount S/H Amount

60 $16,418.40 60 $4,684.80 5 $552.85 60 $8,574.00 30 $7,012.80 177 $21,401.07 186 $16,864.62 83 $10,643.09 196 $25,497.64 5 $514.15 80 $6,863.20 10 $2,860.90 11 $1,823.36 4 $1,035.60 176 $21,658.56 176 $15,053.28 15 $2,474.70 60 $7,805.40 171,738 1,394

Note: Loaded Billing Rates Used TOTAL AUTHORIZATION FEE COMPUTATIONS

Project Manager $273.64 Total (Maximum Limiting Amount) Metric $171,738.42

CADD/Computer

Technician Home

$ 78.08

Scalar $15,761.50

Community Outreach

Specialist Home

$ 110.57

Total $187,499.92

Engineer 1 Home $ 142.90

Engineer 2 Home $ 233.76

Engineering Intern Home $ 120.91

Engineering Technician

Home

$ 90.67

Environmental Specialist $ 128.23

GIS Specialist Home $ 130.09

Graphic Designer Home $ 102.83

Senior Environmental

Specialist Home

Transportation Data

Scientist HomeProject Manager

CADD/Computer

Technician Home

Community Outreach

Specialist Home Engineer 1 Home Engineer 2 Home Senior Designer Home

Senior Computer

Programmer Home

METRIC ENGINEERING, INC.

D2 URBAN AND RURAL TRAIL REHABILITATION STUDY

Secretary/Clerical Home Senior Engineer 1 Home

Miscellaneous Support Services

Project Description:Transportation Systems Planning, Task Work Order 2

SUMMARY FEE SHEET

Project Identifier: F591685550

Engineering Intern

Home

Engineering

Technician Home

Environmental Specialist

Home GIS Specialist Home Graphic Designer Home

Senior Engineering

Technician A Home

Senior Engineering

Technician B Home

DocuSign Envelope ID: 06B75098-FB0E-458B-9417-3D22B8DE5B94

File details come from the government source that posted it. Updated .