This document is a Task Work Order for Professional Services issued by the State of Florida Department of Transportation (FDOT), involving Keith & Associates, Inc., a professional surveying and mapping firm located in Pompano Beach, Florida. The task work order is associated with Contract No. CAM29 and specifically relates to a survey project for State Road 5 (Broadway) from Northwood Road to 47th Street in Broward County, with a federal project number D424 040 B and a state project number 438386 6 32 01.
The task work order authorizes Keith & Associates to perform a comprehensive topographic and subsurface utility engineering (SUE) survey for the project, with a total compensation of $144,688.44, paid on a lump sum basis according to percentage of completion. The survey scope includes preparing a design survey with a digital terrain model (DTM) extending 10 feet outside the existing right-of-way, utility designations within the corridor, and survey work for four signalized intersections extending 250 feet from the stop bar. The project length is 1.34 miles along State Road 5, with an additional 3,650 feet along side streets. The work is to be completed by January 24, 2028, and has been assessed as fair, reasonable, and competitive by the FDOT.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-550000-CAO11-S0010000.pdf | ||
| CN-550000-CAO11.pdf | ||
| ContractBudgetExport.csv | CSV file | |
| CN-550000-CAO11-00020000.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
TASK WORK ORDER FOR PROFESSIONAL SERVICES
375-030-25
PROCUREMENT
08/21
Consultant:
Address:
Date:
1/24/2028
*Limiting or Estimating/Budgeted Amount.
Distribution:
Consultant Acceptance:
Signature
Vice President, Geospatial
$144,688.44
$0.00
(name) (title)
Sam Hall, PSM
$144,688.44
Balance Remaining $114,167.55
Total authorizations to date (including this one):
Departmental Approval:
$144,688.44 Estimate
SR 5/Broadway, Northwood to 47th St
Topographic & SUE Survey
Keith & Associates, Inc
301 E Atlantic Blvd
Pompano Beach, FL 33060
(To be entered upon execution of T.W.O.)
12/27/2023
Brief Task Description:
In accordance with the above referenced contract, you are authorized to perform the tasks detailed in attached Exhibit A (Scope of Services).
Compensation elements are as follows:
Element Description Amount Estimate/LimitMethod of Compensation
The total amount or the limiting amount of the compensation will be:
All services required under this Task Work Order will be completed on or before:
$144,688.44
(LS2) Lump sum paid based on % of completion
Page 1 Total
Page 2 thru 6 Subtotal
Total
Survey Services
$692,586.45
(name) (title) Signature
Jeffrey Smith, PSM District Surveyor & Mapper
Other Notes:
An independent assessment of the staff hours and quantities for the proposed services has been performed, and found to be fair, reasonable, and competitive.
Task Work Order No.:
Contract No.: Payment FM No.:
CAM29 438386 6 32 01
DocuSign Envelope ID: DFD18799-F7B7-4CBD-94E0-A6868D5AC928 www.KEITHteam.com
Pompano Beach (HQ) Fort Lauderdale Miami West Palm Beach Orlando
December 20, 2023
Jeff Smith, PSM FDOT District Surveyor 3400 West Commercial Blvd Fort Lauderdale, Florida 33309
RE: Agreement for Professional Services Contract FM: 429258-8-32-01 Contract No.: CAM29 State Road: 5 Project Name: SR 5 / Broadway Northwood Rd to 47th Street County: Broward Project FM: 438386-6
CITS No.: 25 K&A Project/Proposal Number: 12576.M0 WO25
Dear Mr. Smith:
KEITH would be most pleased to provide Survey and Mapping services on the project as follows.
I. PURPOSE OF AGREEMENT/PROJECT DESCRIPTION
The purpose of this Agreement is to outline the scope of services recommended by CONSULTANT and accepted by CLIENT.
II. SCOPE OF SERVICES
Task 001 Survey and Mapping
Keith and Associates will prepare a design survey for State Road 5 from Northwood Road to 50 feet North of
47th Street. The design survey will include a full DTM with the limits being 10 feet outside the existing right of way. On the four signalized intersections, the limits will be 250 feet from the stop bar. All other side streets, the limits are 50 feet past the curve return.
NOTES
1. This proposal is limited to the scope of work described of work described above and in the staff hour estimate. Any additional out of contract scope of work is to be performed via additional TWO.
2. The length of the project is 7,075 feet (1.34 miles) along S.R. 5 with an additional 3,650 feet along the side streets.
3. SUE utility designates within the corridor will be located.
4. Primary Control will be provided by the Department.
5. The baseline and existing right of way will be provided by the F.D.O.T.
6. Drainage survey will be done by others for this project.
7. Tree information is limited to location, DBH and common names.
8. See the attached staff hour estimate for a further breakdown of the scope.
December 20, 2023
DELIVERABLES
1. Survrd01.dgn, Open Roads file
2. Field Book(s)
3. Signed Survey Report
FEES
Keith and Associates, Inc.
SUR Chief Surveyor Home 32.0 x $206.39 /Hour = $6,604.48
SUR Surveyor Home 49.0 x $191.15 /Hour = $9,366.35
SUR Field Crew Supervisor 1 Home
19.0 x $196.90 /Hour = $3,741.10
SUR Survey/GIS/SUE Analyst 3
75.0 x $182.09 /Hour = $13,656.75
SUR Survey/GIS/SUE Analyst 2
65.0 x $96.18 /Hour = $6,251.70
SUR Mobile Survey Analyst 3
88.0 x $128.74 /Hour = $11,329.12
SUR Mobile Survey Analyst 2
122.0 x $96.94 /Hour = $11,826.68
Sub-Total
$62,776.18
Survey Field Crews
SUR Crew Chief Home 200.0 x $90.88 /Hour = $18,176.00
SUR Instrument Operator Home 204.0 x $75.73 /Hour = $15,448.92
SUR Rod Person Home 243.0 x $63.62 /Hour = $15,459.66
SUE Field Crews
SUR SUE Technician 3 Home 216.0 x $100.48 /Hour = $21,703.68
SUR SUE Technician 1 Home 216.0 x $51.50 /Hour = $11,124.00
Sub-Total
$81,912.26
KEITH TOTAL
$144,688.44
ESTIMATE OF WORK EFFORT AND COST - PRIME CONSULTANT
Name of Project: SR 5 Northwood Road to 47th Street Consultant Name: KEITH
County: Palm Beach Consultant No.: 12576.00 WO 25
FPN: 438386-6-32-01 Date: 12/20/2023
FAP No.: 54321 Estimator: Wilhjelm
SH Salary Average
By Cost By Rate Per
$206.39 $189.33 $191.15 $196.90 $182.09 $96.18 $96.94 $128.74 $75.73 $63.62 $121.17 $302.93 Activity Activity Task
25. Landscape Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
26. Landscape Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
27. Survey (Field & Office Support) 190 13 0 18 19 75 65 0 0 0 0 0 0 190 $29,773 $156.70
28. Photogrammetry 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
29. Mapping 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
30. Terrestrial Mobile LiDAR 266 19 0 31 0 0 0 122 88 4 3 0 0 267 $33,497 $125.46
Total Staff Hours 456 32 0 49 19 75 65 122 88 4 3 0 0 457
Total Staff Cost $6,604.48 $0.00 $9,366.35 $3,741.10 $13,656.75 $6,251.70 $11,826.68 $11,329.12 $302.92 $190.86 $0.00 $0.00 $63,269.96 $138.45
Check = $63,269.96
Survey Field Days by Subconsultant $63,269.96
4 - Person Crew: 0% $0.00
0% $0.00
Notes: 0.00% $0.00
1. This sheet to be used by Prime Consultant to calculate the Grand Total fee. 0.00% $0.00
2. Manually enter fee from each subconsultant. Unused subconsultant rows may be hidden. $63,269.96
20 160 90.88$ / hour $14,540.80 days 160 75.73$ / hour $12,116.80
160 63.62$ / hour $10,179.20
5 40 90.88$ / hour $3,635.20 days 40 75.73$ / hour $3,029.20
40 63.62$ / hour $2,544.80
40 63.62$ / hour $2,544.80
27 216 100.48$ / hour $21,703.68 days 216 51.50$ / hour $11,124.00
0 0 100.48$ / hour $0.00 days 0 51.50$ / hour $0.00
0 51.50$ / hour $0.00
$144,688.44
$0.00
$0.00
$0.00
$0.00
$0.00
$144,688.44GRAND TOTAL ESTIMATED FEE:
SUBTOTAL ESTIMATED FEE:
Subconsultant:
Subconsultant:
Subconsultant:
Subconsultant:
Subconsultant:
SUR SUE Technician 3 Home
SUR SUE Technician 1 Home
SUR SUE Technician 1 Home
Utility Designate/Locate(2 Person SUE Crew)
SUR SUE Technician 3 Home
SUR SUE Technician 1 Home
Utility Designate/Locate(3 Person SUE Crew)
Survey (Field) 4- Person
SUR Crew Chief Home
SUR Instrument Operator Home
SUR Rod Person Home
SUR Rod Person Home
SUBTOTAL ESTIMATED FEE:
Survey (Field) 3- Person
SUR Crew Chief Home
SUR Instrument Operator Home
SUR Rod Person Home
SALARY RELATED COSTS:
OVERHEAD:
OPERATING MARGIN:
FCCM (Facilities Capital Cost Money):
EXPENSES:
SUR Survey
Project
Manager 3
Home
SUR
Instrument
Operator
Home
SUR Rod
Person Home
Utility
Coordinator
Home
SUR
Survey/GIS/SU
E 2 Analyst
Home
SUR Mobile
Survey
Anaylyst 2
Home
SUR Mobile
Survey
Anaylyst 3
Home
SUR Senior
Surveyor 2
Home
SUR Surveyor
Home
SUR Field
Crew
Supervisor 1
Home
SUR
Survey/GIS/SU
E Analyst 3
Home
Staff Classification Total Staff
Hours From
"SH
Summary -
Firm"
SUR Chief
Surveyor
Home
Staff Hour TWO 25.xlsx
Fee Sheet - KEITH Page 1 of 1 12/20/2023 2:41 PM
27. Survey
SR 5 Northwood Road to 47th Street
438386-6-32-01
NOTE: Signature Block is optional, per District preference
Task
No.
Task Units
No of
Units
Field Crew
Days/Unit
Crew
Days
Field
Support
Hours /
Crew Days
Field
Support
Hours
Office
Support
Hours /
Crew Days
Office
Support
Hours
Comments
27.1 Horizontal Project Control (HPC)
2-Lane Roadway Mile 0.00 0.00 0.00
Multi-lane Roadway Mile 1.34 0.75 1.00 1.00 1.00 3.00 3.00
Interstate Mile 0.00 0.00 0.00
27.2 Vertical PC / Bench Line
2-Lane Roadway Mile 0.00 0.00 0.00
Multi-lane Roadway Mile 2.10 0.48 1.00 0.50 0.50 2.00 2.00
Interstate Mile 0.00 0.00 0.00
27.3 Alignment and Existing R/W Lines
Mile 0.00 0.00 0.00 0.00 0.00 0.00 0.00
27.4 Aerial Targets Units/Day
2-Lane Roadway EA 0.00 0.00 0.00
Multi-lane Roadway EA 46.00 20.00 2.30 0.50 1.15 3.00 6.90
Interstate EA 0.00 0.00 0.00
27.5 Reference Points "A" Units/Day
2-Lane Roadway EA 0.00 0.00 0.00
Multi-lane Roadway EA 0.00 0.00 0.00
Interstate EA 0.00 0.00 0.00
Reference Points "B" Units/Day
Non Alignment Points/Approximate EA 0.00 0.00 0.00
Print NameRepresenting Signature / Date
FDOT District
Consultant Name
Elevate TML Targets & Secondary control from provided primary control
Estimator:
Primary control points done by others. Set secondary control as needed for topo.
Done by Others
Set 15 pairs along corrridor and 4 at each major side street
Staff Hour TWO 25.xlsx
27. Survey Page 1 of 4 12/19/2023
Task
No.
Task Units
No of
Units
Field Crew
Days/Unit
Crew
Days
Field
Support
Hours /
Crew Days
Field
Support
Hours
Office
Support
Hours /
Crew Days
Office
Support
Hours
Comments
27.6 Topography/DTM (3D)
Mile 1.72 2.91 5.00 0.50 2.50 3.00 15.00
27.7 Planimetric (2D)
Mile 0.00 0.00 0.00
27.8 Roadway Cross-Sections/Profiles
Mile 1.34 0.75 1.00 0.50 0.50 2.00 2.00
27.9 Side Street Surveys
Mile 1.34 4.10 5.50 0.50 2.75 3.00 16.50
27.10 Underground Utilities
Designates Mile/Site 24.36 1.00 24.36 0.50 12.18 3.00 73.08
Locates Point 0.00 0.00 0.00
Survey 25% 24.36 6.09 0.50 3.05 3.00 18.27
27.11 Outfall Survey
Mile 0.00 0.00 0.00
27.12 Drainage Survey Units/Day
EA 0.00 0.00 0.00
27.13 Bridge Survey
Minor / Major EA 0.00 0.00 0.00
27.14 Channel Survey
EA 0.00 0.00 0.00
27.15 Pond Site Survey
EA 0.00 0.00 0.00
27.16 Mitigation Survey
Mile 0.00 0.00 0.00
27.17 Jurisdiction Line Survey
Mile 0.00 0.00 0.00
27.18 Geotechnical Support Units/Day
EA 0.00 0.00 0.00
27.19 Sectional / Grant Survey
Corner 0.00 0.00 0.00
Perform Designates from Northwood Road o 47th Street, extend to 10' outside of
ROW. 250' down all major side streets (4 streets / 2000' total) and 50' down all minor side streets (12 full streets / 1,200' & 9 half streets / 450'). Total LF = 10,715' x 12
UAO's per Sunshine Design Ticket #346303048 = 128,580' LF of Utilities
Done by Others
1-day for check sections
3 days for Survey ground shots for DTM along SR 5 & 2 days for obscured areas
Survey minor side streets from curve return to 50 feet past. 12 Streets both directions and 9 streets one direction.
Staff Hour TWO 25.xlsx
27. Survey Page 2 of 4 12/19/2023
No.
Task Units
No of
Units
Field Crew
Days/Unit
Crew
Days
Field
Support
Hours /
Crew Days
Field
Support
Hours
Office
Support
Hours /
Crew Days
Office
Support
Hours
Comments
Mile 0.00 0.00 0.00
27.20 Subdivision Location
Block 0 0 0.00 0.00 0.00 3.00 0.00
27.21 Maintained R/W
Mile 0.00 0.00 0.00
27.22 Boundary Survey
EA 0.00 0.00 0.00
27.23 Water Boundary Survey
EA 0.00 0.00 0.00
27.24 R/W Staking / R/W Line
EA 0.00 0.00 0.00
Mile 0.00 0.00 0.00
27.25 R/W Monumentation
Point 0.00 0.00 0.00
27.26 Line Cutting
Mile 0.00
27.27 Work Zone Safety
46 0.125 5.75
27.28 Vegetation Survey
LS 0
27.29 Tree Survey
LS 0
27.30 Miscellaneous Surveys
0.00 0 0.00 0.00 0.00 0.00 0.00
Crew Days 52
Field
Support
Hours
Office
Support
Hours
27.31 Supplemental Surveys
52 0 0 0
27.32 Document Research Units
0.00 0
27.33 Field Reviews Units
Survey Subtotal
MOT
Walk the project site
THE % FOR SUPPLEMENTAL WILL BE DETERMINED AT NEGOTIATIONS. THIS
ITEM CAN ONLY BE USED IF AUTHORIZED IN WRITING BY THE DISTRICT
SURVEYOR
Staff Hour TWO 25.xlsx
27. Survey Page 3 of 4 12/19/2023
No.
Task Units
No of
Units
Field Crew
Days/Unit
Crew
Days
Field
Support
Hours /
Crew Days
Field
Support
Hours
Office
Support
Hours /
Crew Days
Office
Support
Hours
Comments
8.00 8
27.34 Technical Meetings LS
2.00 2
27.35 Quality Assurance / Quality Control LS
5% 7
27.36 Supervision LS
5% 9
27.37 Coordination LS
3% 4
Crew Days 52
Field
Support
Hours
Office
Support
Hours
SPLS =
PLS =
Office Support =
Total Hours = 190
Units No of
Units Hours/ Unit
Total
Hours Number Comments
EA 0 0 0 0
EA 0 0 0 0
EA 0 0 0 0
EA 0 0 0 0
EA 0 0 0 0
EA 0 0 0 0
EA 0 0 0 0
0 0
EA 0 0 0 - -
EA 0 0 0 - -
0 0
Carries to 27.34 Carries to Tab 3
** Project Manager attendance at progress, phase and field review meetings are manually entered on General Task 3
PM Attendance at Meeting
Required?
Local Governments (cities, counties)
Technical Meetings
Kickoff Meeting with FDOT
Baseline Approval Review
Network Control Review
Phase Review Meetings
Total Meetings Total PM Mtgs (carries to Tab 3)
Subtotal PM Meetings
Vertical Control Review
Final Submittal Review
Other Meetings
Subtotal Technical Meetings
Progress Meetings (if required by FDOT)
27. Survey Total
Walk the project site
Staff Hour TWO 25.xlsx
27. Survey Page 4 of 4 12/19/2023
30. Terrestrial Mobile LiDAR
Estimator: SR 5 Northwood Road to 47th Street
438386-6-32-01
NOTE: Signature Block is optional, per District preference
PSM
Senior
LiDAR
Technician
LiDAR
Technician
LiDAR
Operator
Field
Technician
30.1
Urban Scan Miles 6.31 0.200 1.26 1.26
Scan Miles 6.31 0.500 3.16 3.16
Scan Miles 6.31 0.500 3.16 3.16
30.2
Urban Point 46 0.050 2.30 2.30
Point 46 0.100 4.60 4.60
Point 46 0.100 4.60 4.60
30.3
Urban Personnel 1 0.0 0.00 0.00
Personnel 2 0.0 0.00 0.00
30.4
Urban Scan Miles 6.31 0.200 1.26 1.26
Scan Miles 6.31 0.200 2.00 1.26 2.52
30.5
Urban Scan Miles 6.31 0.100 0.63 0.63
Scan Miles 6.31 0.250 1.58 1.58
Scan Miles 6.31 0.400 2.52 2.52
Hours
Representing Print Name
FDOT District
Consultant Name
Comments
Signature / Date
Task
No.
Hour / Unit
No. of
Units UnitsTask
Total
Range
Number of Field Technician(s) =
Terrestrial Mobile LiDAR Processing
LiDAR Sensor Operator
1-Technician to drive vehicle , 1-base station
PSM Only
Sr. LiDAR Tech Only
LiDAR Operator
Terrestrial Mobile LiDAR Mobilization
Terrestrial Mobile LiDAR Mission
LiDAR Operator Only
Field Technician Only
Project Control Point Coordination
Terrestrial Mobile LiDAR Mission Planning
PSM Only
Sr. LiDAR Tech Only
LiDAR Technician Only
PSM Only
Sr. LiDAR Tech Only
LiDAR Technician Only
Staff Hour TWO 25.xlsx
30. Terrestrial Mobile LiDAR Page 1 of 4 12/13/2023
PSM
Senior
LiDAR
Technician
LiDAR
Technician
LiDAR
Operator
Field
Technician
Hours
Comments Task
No.
Hour / Unit
No. of
Units UnitsTask
Total
Range
30.6
Urban Scan Miles 6.31 0.000 0.00 0.00
Scan Miles 6.31 0.000 0.00 0.00
Scan Miles 6.31 0.000 0.00 0.00
30.7
Urban Scan Miles 6.31 0.500 3.16 3.16
0.1 6.31 1.000 6.31 6.31
Scan Miles 6.31 0.000 0.00 0.00
30.8
Urban Corridor
Miles
2.10 0.400 0.84 0.84
Corridor
Miles
2.10 2.500 5.25 5.25
Corridor
Miles
2.10 5.000 10.50 10.50
30.9
Urban Corridor
Miles
2.10 0.250 0.53 0.53
Signal Mast Arm & sign mast arm Corridor
Miles
2.10 1.000 2.10 2.10 details (4 intersections & 1 sign) Corridor
Miles
2.10 2.000 4.20 4.20
30.10
Urban Corridor
Miles
2.10 0.500 1.05 1.05
Corridor
Miles
2.10 30.000 63.00 63.00
Corridor
Miles
2.10 40.000 84.00 84.00
30.11
Urban Corridor
Miles
0.00 0.000 0.00 0.00
Corridor
Miles
0.00 0.000 0.00 0.00
Corridor
Miles
0.00 0.000 0.00 0.00
PSM Only
Sr. LiDAR Tech Only
LiDAR Technician Only
PSM Only
Sr. LiDAR Tech Only
LiDAR Technician Only
Topographic (3D) Mapping
Topographic (2D) Planimetric Mapping
Specific Surface Reporting
Classification / Editing
PSM Only
Sr. LiDAR Tech Only
LiDAR Technician Only
PSM Only
Sr. LiDAR Tech Only
LiDAR Technician Only
PSM Only
Sr. LiDAR Tech Only
LiDAR Technician Only
Terrestrial Mobile Photography Processing
Transformation / Adjustment
PSM Only
Sr. LiDAR Tech Only
LiDAR Technician Only
Staff Hour TWO 25.xlsx
30. Terrestrial Mobile LiDAR Page 2 of 4 12/13/2023
Senior
LiDAR
Technician
LiDAR
Technician
LiDAR
Operator
Field
Technician
Hours
Comments Task
No.
Hour / Unit
No. of
Units UnitsTask
Total
Range
30.12
Urban Corridor
Miles
2.10 0.250 0.53 0.53
Corridor
Miles
2.10 0.500 1.05 1.05
Corridor
Miles
2.10 3.000 6.30 6.30
30.13
Urban Corridor
Miles
2.49 0.250 0.62 0.62
Corridor
Miles
2.49 0.500 1.25 1.25
Corridor
Miles
2.49 3.500 8.72 8.72
30.14
Survey Report LS 1 8 8 8.00
LS 0 0 0 0.00
LS 0 0 0 0.00
LS 0 0 0 0.00
LS 0 0 0 0.00
234.98
PSM Only
Mobile Scan Technical Subtotal
Sr. LiDAR Tech Only
LiDAR Technician Only
PSM Only
Sr. LiDAR Tech Only
LiDAR Technician Only
Miscellaneous
PSM Only
Sr. LiDAR Tech Only
LiDAR Tech Only
LiDAR Operator Only
Field Technician Only
Data Merging
CADD Edits
Staff Hour TWO 25.xlsx
30. Terrestrial Mobile LiDAR Page 3 of 4 12/13/2023
Senior
LiDAR
Technician
LiDAR
Technician
LiDAR
Operator
Field
Technician
Hours
Comments Task
No.
Hour / Unit
No. of
Units UnitsTask
Total
Range
30.15
LS 0 0.00 0.00
LS 0 0.00 0.00
30.16
LS 0.00
30.17
LS 5% 12
30.18
LS 5% 12
24.00
30.19
LS 3% 7
265.98
Units No of Units Hours/ Unit Total
Hours PM Attendance at Meeting Required? Number
EA 0 0 0 0
EA 0 0 0 0
0 0
EA 0 0 0 - -
EA 0 0 0 - -
0 0
Carries to 30.16 Carries to Tab 3
** Project Manager attendance at progress, phase and field review meetings are manually entered on General Task 3
Field Reviews see 27.33
Technical Meetings
From Meetings Table Below
Quality Assurance / Quality Control
Supervision
Coordination
Terrestrial Mobile LiDAR Mapping Submittal Review
Technical Meetings
30. Terrestrial Mobile LiDAR Mapping Total
* The low end of the range is for rural 2-lane; medium range is for typical Multi-Lane; the high end of the range is for urban/interstate.
Mobile Scan Nontechnical Subtotal
Comments
Total PM Mtgs (carries to Tab 3)
Subtotal PM Meetings
Total Meetings
Phase Review Meetings
Progress Meetings (if required by FDOT)
Subtotal Technical Meetings
Other Meetings
Staff Hour TWO 25.xlsx
30. Terrestrial Mobile LiDAR Page 4 of 4 12/13/2023
File details come from the government source that posted it. Updated .