CN-550000-CAH80-S0010000.pdf
PDF 139 KB Posted
- Contract number
- CAH80
- Issued by
- Florida
About this file
This document is an Amendment to a Standard Professional Services Agreement between the State of Florida Department of Transportation (FDOT) and Constructive Engineering Incorporated, serving as the prime consultant. The contract involves multiple entities including subconsultants APEX Engineers, Inc. and CSI GEO, Inc. The amendment is specific to Contract No. CAH80 and was executed on 02/09/2023, with the original agreement dating back to 2/11/2022.
The amendment pertains to the SR-21/Blanding Blvd project from Wilson Blvd to Roosevelt, adding $59,330.62 to the original contract maximum of $888,128.00, bringing the total contract amount to $947,458.62. The additional funding covers expanded scope of services not originally included, specifically addressing drainage and geotechnical deficiencies discovered through video inspections. The new services include preparing drainage memos, conducting geotechnical evaluations for pavement depressions near pipelines, performing SPT borings, and providing project management and coordination. The compensation is structured with defined loaded rates for basic services, survey/geotechnical services, and lighting services, with payment methods based on completion of services and specific work units.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-550000-BEC15-00110000.pdf | ||
| CN-550000-CAH80-00020000.pdf | ||
| CN-550000-CAH80-S0030000.pdf | ||
| CN-550000-CAH80-00050000.pdf | ||
| CN-550000-CAH80-00060000.pdf | ||
| CN-550000-CAH80-S0020000.pdf | ||
| ContractBudgetExport.csv | CSV file | |
| CN-550000-CAH80-00040000.pdf | ||
| CN-550000-CAH80-00030000.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .