CN-550000-CAE47-00120000.pdf
PDF 119 KB Posted
- Contract number
- ASZ69
- Issued by
- Florida
About this file
This document is a Task Work Order Amendment from the Florida Department of Transportation (FDOT) for professional services, specifically for District 3's Intelligent Transportation System (ITS) and Advanced Traffic Management Systems (ATMS). The amendment involves HNTB Corporation, located in Tallahassee, FL, and is associated with Contract No. CAE47. The amendment is the third modification to Task Work Order No. 3, dated December 6, 2022, with a payment Federal ID number of 22089873203.
The amendment extends the work authorization through June 30, 2024, and increases the contract amount by $99,913.00, bringing the total authorizations to date to $793,872.00. The scope of work focuses on supporting FDOT District 3's emerging technology and data management initiatives, including technical support for SunGuide and Data Integration and Video Aggregation System (DIVAS), developing data management plans, facilitating data initiatives consortiums, and supporting the procurement and deployment of new data management platforms. Key tasks include evaluating and enhancing traffic operations systems, identifying new data sources, developing application concepts, and providing training and documentation for various technological systems and operations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-550000-ASZ69-W0010000.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
TASK WORK ORDER AMENDMENT FORM
FOR PROFESSIONAL SERVICES
375-030-26
PROCUREMENT
08/21
6/30/2024 .
recovered is $ .
99,913.00 .
Subtotal Estimate/L imit
$297,044.00 Limit
$0.00
$0.00
$0.00
$0.00
$0.00
$297,044.00
$0.00
$297,044.00
Attachments:
Distribution:
Payment FM No. (must be the same as original Task Work Order):
22089873203
Check all applicable Terms:
Districtwide Intelligent Transportation System (ITS) and Advanced Traffic Management Systems (ATMS) Consultant - Additional Funds and Time Extension (See Attached
Scope)
1276 Metropolitan Blvd., Suite 304 Tallahassee, FL 32312
HNTB Corporation
Address:
Consultant:
Date (To be entered upon execution of Task Work Order Amendment):Contract No.:
CAE47
Purpose of Amendment:
Amendment No.
to Task Work Order No.
$793,872.00
(Name) (Title) Signature
Jason D. Peters, P.E. Director of Transportation Operations
Hunter Hambright Financial Services PSU- Richards
Consultant Acceptance:
(Title)
Leonard Becker
Signature
Senior Vice President
(Name)
Compensation Element
Description
This Amendment
Amount
Basic Services (LA-4) $99,913.00
Previous
Amount
$197,131.00
Method of Compensation
(LA4) Units worked at loaded billing rates in
Table 6 authorized against this task work order beyond the date of execution of this amendment. The following amount is the remaining work order balance to be recovered
The time for completion of services for the subject task work order is extended thru
The total amount for services performed under this task work order is increased by $
The total amount for services performed under this task work order is decreased by $
The decrease in funds will be allocated to the following compensation elements described below.
elements are described below.
from this task work order $ . Note: for Prof. Serv. Task Work Order Amendments, the encumbrance line should never be closed
The subject task work order is hereby closed. Final payment for the task work order has been set to PAID status in CITS. No additional services or charges are
(Status 50) by Financial Services staff based on this selection. Additional Note: Please be sure you want to close out before marking. Premature close outs that must
The subject task work order is hereby canceled (no work has been performed and no payment is due). The total amount of the task work order which is
The additional funds will be allocated to the following compensation elements described below.
There is no increase/decrease in the task work order amount, funds are only redistributed between compensation elements. Revised compensation be corrected in CITS may require programmer time and costs borne by the program office.
$99,913.00
$0.00
$99,913.00
Remaining Balance: $122.00
Departmental Approval:
Total authorizations to date (including this one):
Other Notes:
An independent assessment of the staff hours and quantities for the proposed services has been performed, and found to be fair, reasonable, and competitive.
Page 1 subtotal
Page 2 thru 6 Subtotal
Total
DocuSign Envelope ID: 020A532A-1C72-4EC9-8841-84A509813B71
12/06/2022
District 3 TSM&O and ITS Districtwide
Contract No. CAE47
FEID: 220898-7-32-02 and 03
HNTB Corporation
Emerging Technology and Data Management Support
Exhibit A – Scope of Services
Work Authorization No.: 03
Department Task Manager: Amy DiRusso
HNTB Contract Manager: Rakesh Sharma
Purpose
The purpose of this Task Work Order (TWO) is to help and support the Florida Department of
Transportation District 3 (hereinafter referred to as the DISTRICT). The services to be provided under this task work order is listed below.
Scope
The objective of this TWO it to assist the DISTRICT to incorporate emerging technology into the
Transportation Systems Management & Operations (TSM&O), Intelligent Transportation System (ITS), and
Arterial Management Program (AMP) program. This is an extension of previous TWO 3 to provide additional staff support for FY 23.
List of Tasks
The following subtasks to be completed under this TWO include:
1. SunGuide, DIVAS, and Application Engineering
SunGuide and Data Integration and Video Aggregation System (DIVAS) are critical traffic operations systems that require technical and programmatic support to ensure they are successful in delivering value to the operations of the DISTRICT and the state. They are constantly undergoing change to accommodate increasing demands to integrate new data sources and application concepts and serve additional stakeholder and user needs. The following tasks will support the DISTRICT to contribute leadership in the operation and enhancement of TSM&O systems and operations.
• Advise and consult with the DISTRICT and provide expert advice on SunGuide and other TSM&O related operations systems.
• Evaluate how well SunGuide is meeting the needs of operations and provide technical support to the SunGuide operations.
• Attend and represent the DISTRICT in the SunGuide Software Users Group (SSUG), Change
Management Board (CMB) meetings, and other technical meetings under the direction of the
DISTRICT technical leadership. Prepare discussion topics, research, meeting agendas, meeting minutes, action items, and follow-up on action items.
• Identify enhancements that would improve the operator’s experience or that would improve any other outcome of using the SunGuide software. Coordinate with stakeholders and other project teams on how enhancements and changes will be successfully implemented and integrated.
• Coordinate through the SSUG and CMB forums and the Florida Department of Transportation
(FDOT) Central Office for the enhancement to be approved and implemented.
• Perform verification and validation of SunGuide through a test system and simulation tools and a watchdog program for ongoing operational validation and notification of issues.
• Coordinate and support the deployment of enhancements and changes of SunGuide to the production system.
• Develop and deliver to the DISTRICT tailored training of SunGuide and related systems.
2. Data Management and Technology
SunGuide, arterial systems, and connected vehicles generate vast amounts of new data sources that, if harnessed, can provide tremendous value to the program for planning, operational decision support, and automation and result in safety and mobility enhancements along with cost savings. The following tasks will launch the data initiatives sub-program within the TSM&O and AMP program:
• Develop data management plan and prepare for the future big data and decision support system.
• Facilitate a data initiatives consortium among stakeholders for mainstreaming and discovery of user needs and feedback. Start with the DISTRICT TSM&O office, then other DISTRICT offices, and then include local agency stakeholders.
• Develop application concepts through a combination of bringing tested ideas from other Districts and agencies in other states that can be tailored to meet a need in the DISTRICT.
Support the procurement, oversight, support, delivery, verification, and validation of projects.
• Establish a platform for data distribution, storage, and sharing among SunGuide, arterial system, connected vehicles, and 3rd party data providers using industry best practices to integrated commercially supported products.
o Survey current data management technology stack state of the practice.
o Develop data management platform technology stack, architecture, and design.
o Conduct technical reviews with the DISTRICT network engineering and operations teams.
o Oversee and support the deployment of the data management platform.
• Identify and obtain new sources of data including Automated Traffic Signal Performance
Measures (ATSPM), HERE.com data products, Connected Vehicle and other project deployments, Waze, and other data providers.
• Develop of outreach and training materials and conducting demonstration and training workshops.
• Develop, oversee, and/or conduct projects that produce analytics and applications from the data management platform that adds value to the DISTRICT operations and other stakeholders.
• Provide data security and Storage Area Network (SAN) management support.
Deliverables
Deliverables for this TWO includes the following:
• Evaluations, advice, recommendations, architecture diagrams, designs, presentation materials, demonstration and training materials, meeting arrangements, invitations, addenda, meeting materials, meeting presentations, action items, reports and follow-up activity tracking and documents for SunGuide, other TSM&O technical systems and operations including TIM and data initiatives program
• Project reports, scope documents, cost estimates, and schedules for projects developed under this task work order
• Verification and Validation plans, procedures, and reports for SunGuide enhancements and other projects being developed under this task work order
• SunGuide test system with simulation tools
Schedule
The detailed schedule is attached in Exhibit B. The work shall be complete by June 30, 2023.
Budget
See attached staff hour estimate.
File details come from the government source that posted it. Updated .