CN-550000-ASZ69-W0010000.pdf
PDF 1 MB Posted
- Contract number
- ASZ69
- Issued by
- Florida
About this file
This document is a Railroad Change Order Number 1 issued by the Florida Department of Transportation (FDOT) involving CSX Transportation, Inc. for a railroad crossing project located in Hardee County, Florida. The change order references a master agreement dated 8/7/1972 and pertains to a roadway resurfacing project at crossing 624118P on State Road 62, with the Financial Project ID 451285-1-57-01.
The change order authorizes CSX Transportation to perform preliminary engineering review, CEI (Construction Engineering and Inspection) services, and flagging coverage for the project. The total authorized amount is $50,000.00, which will be reimbursed using the Force Account Method under state funds. The project is classified as a Crossing Surface agreement, with work to be completed between 04/16/2024 and 12/31/2050. The change order includes specific requirements for E-Verify compliance, Buy America provisions, and adherence to Title VI nondiscrimination assurances. The project involves roadway work at a specific railroad milepost (SVC 857.58) and is part of a broader transportation improvement initiative.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-550000-CAE47-00120000.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
725-090-04
RAIL
OGC – 3/24
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
RAILROAD CHANGE ORDER NUMBER 1
Financial Project ID Roadway Description County Roadway ID Contract ID
451285-1-57-01 SR 62 Hardee 06020000 ASZ69
A. 1. The CSX Transportation, Inc. Company is hereby authorized to observe the following changes in the plans and or specifications to the subject Railroad Agreement, and to perform such work accordingly, further described as:
Preliminary engineering review, CEI services, and flagging coverage for roadway resurfacing project at crossing 624118P, RR MP SVC 857.58. This change order includes any other work deemed necessary to complete the project.
2. Exhibit A, Exhibit B, and Exhibit C are attached to the Railroad Change Order and made part of the below referenced Railroad Agreement.
3. The items of work covered by this Change Order are referenced to the Master Agreement of record dated 8/7/1972 and no Supplemental Agreement is required.
Agreement Type: Crossing Surface
B. 1. Reimbursement for the cost of this Railroad Work is to be in accord with the provisions set forth in Administrative Rule Chapter 14-57 Section .011(2) as:
a. ☐ NONREIMBURSABLE
b. ☒ REIMBURSABLE
(1) ☒ Force Account Method
(2) ☐ Lump Sum Method
(3) ☐ Third Party Contract Method
C. ESTIMATED COST OF WORK DUE TO THIS CHANGE ORDER
CHANGE
ORDER
DESCRIPTION
PREVIOUSLY
AUTHORIZED WORK
AMOUNT(S)
NEW AUTHORIZED
WORK AMOUNT
1 PE, CEI, flagging $0.00 $50,000.00
Total amount of work previously authorized………………………………………………………… $0.00
Total amount of new work authorized by this change order…………………………………………………………………… $50,000.00
Total amount of work authorized under agreement for this Financial Project ID……………………………………… $0.00
PROJECT TOTAL AMOUNT OF WORK AUTHORIZED TO DATE……………………………………………………………………… $50,000.00
Examined as to provisions and participating items of cost:
Recommended: ____________________ Approved: ____________________ Date Date
Wendy Sands Paul Simmons
District Rail Administrator Modal Development Administrator
DocuSign Envelope ID: EF71B8B7-4754-4FE4-9A15-D98F14A0AFE6
05/20/2024 | 11:27 AM EDT 05/20/2024 | 1:31 PM EDT
OGC – 3/24
EXHIBIT A
The Company shall:
1. utilize the U.S. Department of Homeland Security’s E-Verify system to verify the employment eligibility of all new employees hired by the Company during the term of the contract; and
2. include an express requirement in any subcontract that subcontractors performing work or providing services pursuant to the state contract utilize the U.S. Department of Homeland Security’s E-Verify system to verify the employment eligibility of all new employees hired by the subcontractor during the contract term.
OGC – 3/24
EXHIBIT B
The Company shall:
1. adhere to all Buy America requirements (23 CFR 635.410) to ensure that all manufacturing processes of steel and iron occur in the United States; and
2. ensure that prefabricated items that contain steel must also comply with Buy America; and
3. provide Buy America certifications that include correct language, project information, and the material’s delivery date.
OGC – 3/24
EXHIBIT C
The Company understands:
1. that while FHWA1273 does not apply to force account work performed by rail companies, FHWA-assistance is subject to Title VI (42 U.S.C. § 2000d et seq); and
2. requires appropriate assurances by providing an executed Title VI / Nondiscrimination Assurance, including Appendices A and E.
FLORIDA DEPARTMENT OF TRANSPORTATION
FUNDS APPROVAL
ASZ69
4/17/2024
CONTRACT INFORMATION
FUNDS APPROVAL INFORMATION
FUNDS APPROVED/REVIEWED FOR JASON ADANK, CPA, COMPTROLLER ON 4/17/2024
Action: Task Work Order
Reviewed or Approved: APPROVED
Organization Code: 55014010106
Expansion Option: A9
Object Code: 563000
Amount: $50,000.00
Financial Project: 45128515701
Work Activity (FCT): 127
CFDA:
Fiscal Year: 2024
Budget Entity: 55150200
Category/Category Year: 088797/24
Amendment ID: W001
Sequence: 00
User Assigned ID: CO# 1
Enc Line (6s)/Status: 0001/04
Total Amount: $50,000.00
Contract: ASZ69
Contract Type: AC - RR CROSSING-PE/INSTAL (RR-XING/PE)
Vendor Name: CSX TRANSPORTATION, INC.
Vendor ID: F546000720022
Beginning Date of This Agreement: 04/16/2024
Ending Date of This Agreement: 12/31/2050
Contract Total/Budgetary Ceiling:
Method of Procurement: R - RAILROAD/UTILITIES AGREEMENT
Description: Preliminary engineering review and construction services forcrossing 624118P in POP project 451285-1
Page1 of 1
To: Jennifer.Gaona@dot.state.fl.us
CSX TRANSPORTATION – NEW PROJECT INITIATION FORM
Please provide the following information so that CSXT is able to accurately and appropriately process the project setup and billing.
Is this project associated with
Federal funds?
Is this project associated with
State funds?
Please describe the funding source for this project (i.e. INFRA, Section 130, State, County, Private, etc.).
Project Requirements:
Buy America
Additional procurement restrictions (Please describe below)
State Suspended and Debarred (Note - All federally funded projects are already monitored against the federal sus/deb listings)
Davis-Bacon (Please only check this box if this is a construction project that may be performed by an outside party)
CSX is subject to a state single audit as a recipient or subrecipient of funds (The only states that should apply here are FL or NC. FL must provide completed form DFS-A2-NS.)
Other If you selected Other, please describe below. Only complete this section if this project is associated with
Federal and/or State funds.
Project Sponsor - "Bill To" Information
Agency - Sponsor:
Billing Address:
Contact Name:
Phone:
E-mail:
Invoice Delivery Method:
Project Location:
Project Description:
Sponsor Project Ref.
Number (If applicable)
Signature of Applicant* Please sign, and e‐mail this form to the authorized CSX representative.
Name and Title of
Applicant
Signature of Applicant Date:
*By signing this form you are authorizing CSXT to incur costs and bill against this project. Should the project be canceled, CSXT will bill the Project Sponsor for the incurred costs. In the event the Project Sponsor is unresponsive for 90 days or more, the project will be closed;
and the Project Sponsor will be final billed for all project costs incurred.
Form Revision 7/18/23
If Email or Mail & Email is selected, please enter Email address(es) here:
Note: this is the agency that will be paying the invoice.
Note: this is the address to send the invoice for payment.
State funds, DDR
E-Verify
Florida Department of Transportation 801 N Broadway Avenue, Bartow, FL 33830
J.J. Wren 863-519-2437 JJ.Wren@dot.state.fl.us
JJ.Wren@dot.state.fl.us
Crossing 624118P, RR MP SVC 857.58
SR 62 FROM MANATEE COUNTY LINE TO SR 35 (US 17)
451285-1-57-01 (ASZ69)
J.J. Wren, Rail Project Manager
No
Yes
05/20/2024 | 11:19 AM EDT
| Change Order 1 |
| _PT129JG-ASZ69-W001-DIST-01-20240417-102314-PT129JG@dot.state.fl.us-Jennifer-Gaona |
| CSXT New Project Initiation Form Updated 20230718 |
| RHCI Summary 624118P |
| Location Map, 624118P |
File details come from the government source that posted it. Updated .