CN-550000-CAA29-W0020000.pdf
PDF 58 KB Posted
- Contract number
- CAA29
- Issued by
- Florida
About this file
This document is a Task Work Order for Professional Services issued by the State of Florida Department of Transportation (FDOT), specifically for Geomatics Corporation, located in St. Augustine, Florida. The task work order is associated with Contract No. CAA29 and has a Financial Project Number of 211024-1-32-23, focusing on survey and mapping services within District Two.
The task work order authorizes Geomatics Corporation to perform miscellaneous surveys throughout various counties in Florida, with a total compensation limit of $14,909.00. The services will involve providing survey services necessary for construction plan preparation, adhering to the latest District Two Survey Database and Mapping Guidelines. The work is to be completed by 8/30/2025, with compensation based on loaded billing rates in Table 6. The Department will provide horizontal and vertical control along the project, and all survey data and notes will be recorded in an FDOT-approved database or field book. The total authorizations to date, including this task work order, amount to $64,909.00.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-550000-AS325-W0020000.pdf | ||
| CN-550000-CAA29-00030000.pdf | ||
| CN-550000-CAA29-00040000.pdf | ||
| CN-550000-CAA29-W0010000.pdf | ||
| CN-550000-CAA29-00020000.pdf | ||
| CN-550000-CAA29.pdf | ||
| CN-550000-CA295-00120000.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
TASK WORK ORDER FOR PROFESSIONAL SERVICES
375-030-25
PROCUREMENT
08/21
Consultant:
Address:
Date:
8/30/2025
*Limiting or Estimating/Budgeted Amount.
Distribution:
Task Work Order No.:
Contract No.: Payment FM No.:
CAA29 211024-1-32-23
$64,909.00
(name) (title) Signature
Clay Driggers, PSM PLS II Supervisor
Other Notes:
An independent assessment of the staff hours and quantities for the proposed services has been performed, and found to be fair, reasonable, and competitive.
(LA4) Units worked at loaded billing rates in Table 6
Page 1 Total
Page 2 thru 6 Subtotal
Total
Survey/Mapping Services
Geomatics Corporation
2804 N. Fifth Street, Unit 101, St. Augustine, FL 32084
(To be entered upon execution of T.W.O.)
Brief Task Description:
In accordance with the above referenced contract, you are authorized to perform the tasks detailed in attached Exhibit A (Scope of Services).
Compensation elements are as follows:
Element Description Amount Estimate/LimitMethod of Compensation
The total amount or the limiting amount of the compensation will be:
All services required under this Task Work Order will be completed on or before:
$14,909.00
$14,909.00 Limit
Miscellaneous Surveys throughout the District.
Signature
Geomatics Corporation
$14,909.00
$0.00
(name) (title)
Pablo Ferrari, PSM
$14,909.00
Total authorizations to date (including this one):
Departmental Approval:
Consultant Acceptance:
Clay Driggers Digitally signed by Clay Driggers DN: C=US, E=clay.driggers@dot.state.fl.us, CN=Clay Driggers Reason: I approve this document.
Date: 2022.09.06 16:27:08-04'00'
9/15/2022
Stage III (9-6-22) A-1
SCOPE OF SERVICES
I. DESCRIPTION
Authorization Financial Project Number 211024-1-32-23. This authorization is for Miscellaneous Surveys in Various Counties in Florida.
Project Limits
To be determined per task
II. SERVICES
For this authorization, the consultant shall provide all survey services necessary for the preparation of complete construction plans for the above referenced project. All work shall be in compliance with the latest District Two Survey Database Guidelines and Mapping Guidelines. This service will include, but not be limited to the following:
III. PROVISIONS OF WORK
All work shall be coordinated and subject to the review of the District Survey Department. The survey data/notes shall be recorded in a FDOT approved database or field book.
IV. DEPARTMENT’S RESPONSIBILITIES
The Department will furnish the Horizontal and Vertical Control along the project.
File details come from the government source that posted it. Updated .