CN-550000-C9Y08.pdf
PDF 8 MB Posted
- Contract number
- C9Y08
- Issued by
- Florida
About this file
This document is a Standard Professional Services Agreement between the Florida Department of Transportation (FDOT) and Panhandle Engineering & Construction, Inc. (PECS), a consulting firm located in Marianna, Florida. The contract involves multiple subconsultants, including Protean Design Group, The Balmoral Group, David H. Melvin, Inc., Gortemoller Engineering, Horizon Engineering Group, and Environmental and Geotechnical Specialists, Inc. The agreement covers professional engineering and design services for a transportation infrastructure project in Escambia County.
The contract is for the resurfacing, rehabilitation, and restoration of State Road (SR) 375 (Sopchoppy Highway) from north of Beasley Road to SR 30 (US 98), with a total maximum limiting amount of $694,681. The project involves a Complete Streets concept that will maintain existing travel lanes while adding bicycle lanes, raised medians, sidewalks, auxiliary lanes, on-street parking, street lighting, and landscaping. The agreement includes basic services, optional services for permitting, and plans update services. Compensation will be made through progress payments based on completed and accepted work, with specific loaded billing rates established for different professional roles across the participating consulting firms.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-550000-C9M43-00110000.pdf | ||
| CN-550000-C9Y08-00020000.pdf | ||
| CN-550000-C9Y08-00030000.pdf | ||
| CN-550000-C9Y08-00040000.pdf | ||
| ContractBudgetExport.csv | CSV file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
STANDARD PROFESSIONAL SERVICES AGREEMENT
375-030-12
PROCUREMENT
OGC – 09/16
Contract No.: C9Y08
FDOT Financial ID No.(s) 43973013201
Appropriation Bill Number(s)/Line Item Number(s) for 1st year of contract, pursuant to s. 216.313, F.S.
(required for contracts in excess of $5 million)
F.A.P. No. N/A
THIS AGREEMENT, made and entered into on , by and between the (This date to be entered by DOT only)
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION, an agency of the State of Florida, hereinafter called the
Department and Panhandle Engineering & Construction, Inc. d/b/a/ PECS
(FEID No. 452846275 ) of 4277 Lafayette, Marianna, Florida 32446 authorized to conduct business in the State of Florida, hereinafter called the Consultant, agree as follows:
The Consultant and the Department mutually agree to abide by the Department's Standard Professional Services
Agreement, Terms, dated September, 2016 which are available as an appendix to this form in the
Department's Professional Services web site or from the Department's Office of Procurement. The Standard
Professional Services Agreement Terms, with the exception of the following non-applicable sections:
are incorporated by reference and made a part of this Agreement.
1. SERVICES AND PERFORMANCE
A. The Department does hereby retain the Consultant to furnish certain services as described in Exhibit "A", attached hereto and made a part hereof, in connection with
Resurfacing, Rehabilitation, and Restoration of State Road (SR) 375 (Sopchoppy Highway) from North of Beasley Road to SR 30 ( US 98) in Wakulla County.
B. Unless changed by written agreement, the site for inspection of work referenced in Section 1.I of the Standard Professional Services Terms, will be 4277 La ayette, Marianna, Florida 32446.
2. TERM
A. Unless otherwise provided herein or by Supplemental Agreement or Amendment, the provisions of this Agreement will remain in full force and effect through completion of all services required of the Consultant or a
10 year term from the date of execution of this Agreement, whichever occurs first.
B. Check applicable terms
The scheduled project services to be rendered by the Consultant will commence, subsequent to execution of this Agreement, on the date specified in the written notice to proceed from the Department's Director of Transportation Development which notice to proceed will become part of this Agreement. The Consultant will complete scheduled project services within 18 months of the commencement date specified in the notice to proceed or as modified by subsequent Amendment or Supplemental Agreement.
The project services to be rendered by the Consultant for each task assignment will commence, upon written notice from the Department's and will be completed within the time period specified in each task assignment. All services performed under this contract will be completed within months from the date of this Agreement. The total fee for all accumulated task assignments may not exceed $
The scheduled project services to be rendered by the Consultant will commence, subsequent to execution of this Agreement, on the date specified in the written notice to proceed from the Department's which notice to proceed will become part of this Agreement. The Consultant will complete scheduled project services within calendar days following completion of the construction contract(s) with which consultant services are associated. The anticipated length of the consultant services is months.
X
DocuSign Envelope ID: B87E547C-46B8-458A-BF86-1780FF903898
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
STANDARD PROFESSIONAL SERVICES AGREEMENT
375-030-12
PROCUREMENT
OGC – 09/16
3. INSURANCE
The amount of liability insurance to be maintained by the Consultant in accordance with Section 4.B of the Standard Professional Services Agreement Terms is $250,000.
4. SUBCONTRACTS
The following subconsultants are authorized under this Agreement in accordance with Section 7.A. of the Standard Professional Services Agreement Terms:
Protean Design Group, Inc. The Balmoral Group, LLC
David H. Melvin, Inc. Gortemoller Engineering, Inc.
Horizon Engineering Group, Inc. Environmental and Geotechnical Specialists, Inc.
5. COMPENSATION
The Department agrees to pay the Consultant compensation as detailed in Exhibit "B", attached hereto and made a part hereof.
6. MISCELLANEOUS
A. Reference in this Agreement to Director will mean the Director of Transportation Development.
B. The services provided herein do do not involve the expenditure of federal funds. In the event federal funds are involved, Section 9 of the Standard Professional Services Agreement Terms is incorporated by reference.
C. The following attachments are hereby incorporated into this Agreement as part hereof as though fully set forth herein.
Page A-1 through Page A-67 : Exhibit "A", Scope of Services
Page B-1 through Page B-5 : Exhibit "B", Method of Compensation
IN WITNESS WHEREOF, the parties have executed this Agreement by their duly authorized officers on the day, month and year set forth above.
Panhandle Engineering & Construction, Inc. d/b/a PECS
STATE OF FLORIDA
DEPARTMENT OF TRANSPORTATION
Name of Consultant
BY: BY:
Authorized Signature
Jared Perdue, P.E.
(Print/Type) (Print/Type)
Title: Title: Director of Transportation Development
FOR DEPARTMENT USE ONLY
APPROVED: LEGAL REVIEW
Professional Services Unit General Counsel Office
OCTOBER 5, 2017 FPID: 218630-2-32-01
OCTOBER 5, 2017
EXHIBIT A
SCOPE OF SERVICES
FOR
FINANCIAL PROJECT ID. (FPID) 218630-2-32-01
SR 30 (US 98 / Navy Boulevard) from SR 295 to Bayou Chico Bridge
DISTRICT THREE
ESCAMBIA COUNTY
A-2
1 PURPOSE __________________________________________________________16
2 PROJECT DESCRIPTION ___________________________________________17
2.1 Project General and Roadway (Activities 3, 4, and 5) ___________________19
2.2 Drainage (Activities 6a and 6b) ____________________________________21
2.3 Utilities Coordination (Activity 7) __________________________________21
2.4 Environmental Permits, Compliances, and Clearances (Activity 8) ________23
2.5 Structures (Activities 9 18) ______________________________________23
2.6 Signing and Pavement Markings (Activities 19 & 20) __________________23
2.7 Signalization (Activities 21 & 22) __________________________________24
2.8 Lighting (Activities 23 & 24) ______________________________________24
2.9 Landscape Architecture (Activities 25 & 26) _________________________24
2.10 Survey (Activity 27) _____________________________________________25
2.11 Photogrammetry (Activity 28) N/A _________________________________25
2.12 Mapping (Activity 29) ___________________________________________25
2.13 Terrestrial Mobile LiDAR (Activity 30) N/A _________________________26
2.14 Architecture (Activity 31) N/A ____________________________________26
2.15 Noise Barriers (Activity 32) N/A ___________________________________27
2.16 Intelligent Transportation Systems (Activities 33 & 34) _________________27
2.17 Geotechnical (Activity 35) ________________________________________28
2.18 Project Schedule ________________________________________________28
2.19 Submittals _____________________________________________________29
2.20 Provisions for Work _____________________________________________35
2.21 Services to be Performed by the DEPARTMENT ______________________41
3 PROJECT COMMON AND PROJECT GENERAL TASKS _______________43
Project Common Tasks ________________________________________________43 Project General Tasks _________________________________________________46
3.1 Public Involvement _____________________________________________46
3.1.1 Community Awareness Plan ______________________________________46
3.1.2 Notifications ___________________________________________________46
3.1.3 Preparing Mailing Lists __________________________________________49
3.1.4 Median Modification Letters ______________________________________52
3.1.5 Driveway Modification Letters ____________________________________52
3.1.6 Newsletters ____________________________________________________53
3.1.7 Renderings and Fly-Throughs _____________________________________53
3.1.8 PowerPoint Presentations _________________________________________53
3.1.9 Public Meeting Preparations ______________________________________53
3.1.10 Public Meeting Attendance and Follow-up ___________________________55
3.1.11 Other Agency Meetings __________________________________________57
3.1.12 Web Site ______________________________________________________57
3.2 Joint Project Agreements _________________________________________57
3.3 Specifications Package Preparation (To be Prepared during Plans Update) __57
3.4 Contract Maintenance and Electronic Document Management System (EDMS)
_____________________________________________________________59
3.5 Value Engineering (Multi-Discipline Team) Review ___________________59
A-3
3.6 Prime Consultant Project Manager Meetings _________________________60
3.7 Plans Update __________________________________________________60
3.8 Post Design Services ____________________________________________61
3.9 Digital Delivery ________________________________________________63
3.10 Risk Assessment Workshop: N/A __________________________________63
3.11 Railroad, Transit and/or Airport Coordination: N/A ____________________63
3.12 Other Project General Tasks ______________________________________63
4 ROADWAY ANALYSIS ______________________________________________63
4.1 Typical Section Package _________________________________________63
4.2 Pavement Type Selection Report (To Be Provided By The DEPARTMENT) 63
4.3 Pavement Design Package (To Be Provided By The DEPARTMENT) _____63
4.4 Cross-Slope Correction N/A ______________________________________63
4.5 Horizontal/Vertical Master Design Files _____________________________64
4.6 Access Management_____________________________________________64
4.7 Roundabout Evaluation __________________________________________65
4.8 Roundabout Final Design Analysis _________________________________66
4.9 Cross Section Design Files________________________________________66
4.10 Traffic Control Analysis _________________________________________66
4.11 Master TCP Design Files _________________________________________67
4.12 Design Variations and Exceptions __________________________________67
4.13 Design Report _________________________________________________67
4.14 Quantities _____________________________________________________69
4.15 Cost Estimate __________________________________________________69
4.16 Technical Special Provisions ______________________________________69
4.17 Other Roadway Analysis _________________________________________69
4.18 Field Reviews __________________________________________________70
4.19 Monitor Existing Structures _______________________________________70
4.20 Technical Meetings _____________________________________________70
4.21 Quality Assurance/Quality Control _________________________________70
4.22 Independent Peer Review _________________________________________70
4.23 Supervision ____________________________________________________71
4.24 Coordination ___________________________________________________71
5 ROADWAY PLANS _________________________________________________71
5.1 Key Sheet _____________________________________________________71
5.2 Summary of Pay Items Including Quantity Input ______________________71
5.3 Typical Section Sheets ___________________________________________72
5.4 General Notes/Pay Item Notes _____________________________________72
5.5 Summary of Quantities Sheets _____________________________________72
5.6 Project Layout _________________________________________________72
5.7 Plan/Profile Sheet _______________________________________________72
5.8 Profile Sheet ___________________________________________________72
5.9 Plan Sheet _____________________________________________________72
5.10 Special Profile _________________________________________________72
5.11 Back-of-Sidewalk Profile Sheet ____________________________________72
A-4
5.12 Interchange Layout Sheet N/A _____________________________________72
5.13 Ramp Terminal Details (Plan View) N/A ____________________________72
5.14 Intersection Layout Details _______________________________________72
5.15 Special Details _________________________________________________72
5.16 Cross-Section Pattern Sheet(s) _____________________________________72
5.17 Roadway Soil Survey Sheet(s) _____________________________________72
5.18 Cross Sections _________________________________________________72
5.19 Temporary Traffic Control Plan Sheets ______________________________72
5.20 Temporary Traffic Control Cross Section Sheets ______________________72
5.21 Temporary Traffic Control Detail Sheets ____________________________72
5.22 Utility Adjustment Sheets ________________________________________72
5.23 Selective Clearing and Grubbing Sheet(s) ____________________________72
5.24 Project Network Control Sheet(s) __________________________________72
5.25 Environmental Detail Sheets ______________________________________72
5.26 Utility Verification Sheet(s) (SUE Data) _____________________________73
5.27 Quality Assurance/Quality Control _________________________________73
5.28 Supervision ____________________________________________________73
6a DRAINAGE ANALYSIS ______________________________________________73 6a.1 Drainage Map Hydrology ________________________________________74 6a.2 Base Clearance Report ___________________________________________74 6a.3 Pond Siting Analysis and Report ___________________________________74 6a.4 Design of Cross Drains __________________________________________74 6a.5 Design of Ditches _______________________________________________74 6a.6 Design of Stormwater Management Facility (Offsite or Infield Pond) ______74 6a.7 Design of Stormwater Management Facility (Roadside Ditch as Linear Pond)
_____________________________________________________________75 6a.8 Design of Floodplain Compensation ________________________________75 6a.9 Design of Storm Drains __________________________________________75 6a.10 Optional Culvert Material ________________________________________75 6a.11 French Drain Systems ___________________________________________75 6a.12 Drainage Wells _________________________________________________75 6a.13 Drainage Design Documentation Report _____________________________75 6a.14 Bridge Hydraulic Report _________________________________________76 6a.15 Temporary Drainage Analysis _____________________________________76 6a.16 Cost Estimate __________________________________________________76 6a.17 Technical Special Provisions ______________________________________76 6a.18 Other Drainage Analysis _________________________________________76 6a.19 Field Reviews __________________________________________________76 6a.20 Technical Meetings _____________________________________________76 6a.21 Environmental Look-Around Meetings ______________________________76 6a.22 Quality Assurance/Quality Control _________________________________76 6a.23 Independent Peer Review _________________________________________76 6a.24 Supervision ____________________________________________________76 6a.25 Coordination ___________________________________________________76
A-5
6b DRAINAGE PLANS _________________________________________________76 6b.1 Drainage Map (Including Interchanges) _____________________________76 6b.2 Bridge Hydraulics Recommendation Sheets __________________________76 6b.3 Summary of Drainage Structures ___________________________________76 6b.4 Optional Pipe/Culvert Material ____________________________________76 6b.5 Drainage Structure Sheet(s) (Per Structure) ___________________________76 6b.6 Miscellaneous Drainage Detail Sheets _______________________________76 6b.7 Lateral Ditch Plan/Profile ________________________________________77 6b.8 Lateral Ditch Cross Sections ______________________________________77 6b.9 Retention/Detention Pond Detail Sheet(s) ____________________________77 6b.10 Retention Pond Cross Sections ____________________________________77 6b.11 Erosion Control Plan Sheet(s) _____________________________________77 6b.12 SWPPP Sheet(s) ________________________________________________77 6b.13 Quality Assurance/Quality Control _________________________________77 6b.14 Supervision ____________________________________________________77
7 UTILITIES _________________________________________________________77
7.1 Utility Kickoff Meeting __________________________________________77
7.2 Identify Existing Utility Agency Owner(s) ___________________________77
7.3 Make Utility Contacts (To Be Conducted by the DEPARTMENT) ________77
7.4 Exception Processing ____________________________________________78
7.5 Preliminary Utility Meeting _______________________________________78
7.6 Individual/Field Meetings ________________________________________78
7.7 Collect and Review Plans and Data from UAO(s) _____________________78
7.8 Subordination of Easements Coordination (To Be Conducted by the
DEPARTMENT) _______________________________________________78
7.9 Utility Design Meeting ___________________________________________79
7.10 Review Utility Markups & Work Schedules and Processing of Schedules &
Agreements ___________________________________________________79
7.11 Utility Coordination/Follow-up ____________________________________79
7.12 Utility Constructability Review (To Be Conducted by the DEPARTMENT) _80
7.13 Additional Utility Services (To be Conducted by the DEPARTMENT or
Included via Supplemental Agreement) ______________________________80
7.14 Processing Utility Work by Highway Contractor (UWHC) (To Be Conducted by the DEPARTMENT) __________________________________________80
7.15 Contract Plans to UAO(s) ________________________________________80
7.16 Certification/Close-Out (To Be Conducted by the DEPARTMENT) _______80
7.17 Other Utilities __________________________________________________81
8 ENVIRONMENTAL PERMITS, COMPLIANCE AND CLEARANCES _____81
8.1 Preliminary Project Research ______________________________________81
8.2 Field Work ____________________________________________________81
8.3 Agency Verification of Wetland Data _______________________________84
8.4 Complete and Submit All Required Permit Applications ________________84
8.5 Prepare Dredge and Fill Sketches (as needed) _________________________85
8.6 Prepare USCG Permit Sketches ____________________________________85
A-6
8.7 Prepare Water Management District Right of Way Occupancy Sketches (To Be Prepared by the DEPARTMENT) __________________________________85
8.8 Prepare Coastal Construction Control Line (CCCL) Permit Application ____85
8.9 Prepare Tree Permit Information ___________________________________85
8.10 Mitigation Design (To Be Provided by Others) ________________________85
8.11 Mitigation Coordination and Meetings ______________________________85
8.12 Other Environmental Permits ______________________________________86
8.13 Technical Support to Department for Environmental Clearances and Re-evaluations ____________________________________________________86
8.14 Preparation of Environmental Clearances and Reevaluations (TO BE
PROVIDED BY THE DEPARTMENT) _____________________________87
8.15 Contamination Impact Analysis ____________________________________88
8.16 Asbestos Survey ________________________________________________88
8.17 Technical Meetings _____________________________________________88
8.18 Quality Assurance/Quality Control _________________________________88
8.19 Supervision ____________________________________________________88
8.20 Coordination ___________________________________________________88
9 STRUCTURES - SUMMARY AND MISCELLANEOUS TASKS AND
DRAWINGS: N/A ___________________________________________________88
10 STRUCTURES - BRIDGE DEVELOPMENT REPORT: N/A ______________88
11 STRUCTURES - TEMPORARY BRIDGE: N/A __________________________88
12 STRUCTURES - SHORT SPAN CONCRETE BRIDGE: N/A ______________88
13 STRUCTURES - MEDIUM SPAN CONCRETE BRIDGE: N/A _____________89
14 STRUCTURES - STRUCTURAL STEEL BRIDGE: N/A __________________89
15 STRUCTURES - SEGMENTAL CONCRETE BRIDGE: N/A ______________89
16 STRUCTURES - MOVABLE SPAN: N/A _______________________________89
17 STRUCTURES - RETAINING WALL: N/A _____________________________89
18 STRUCTURES - MISCELLANEOUS __________________________________89
18.9 Mast Arms ____________________________________________________89
18.10 Mast Arms Data Table Plan Sheets _________________________________89
18.11 Mast Arms Special Details Plan Sheets ______________________________89
19 SIGNING AND PAVEMENT MARKING ANALYSIS ____________________89
19.1 Traffic Data Analysis ____________________________________________89
19.2 No Passing Zone Study N/A ______________________________________89
19.3 Reference and Master Design File __________________________________89
19.4 Multi-Post Sign Support Calculations _______________________________90
19.5 Sign Panel Design Analysis _______________________________________90
A-7
19.6 Sign Lighting/Electrical Calculations _______________________________90
19.7 Quantities _____________________________________________________90
19.8 Cost Estimate __________________________________________________90
19.9 Technical Special Provisions ______________________________________90
19.10 Other Signing and Pavement Marking Analysis _______________________90
19.11 Field Reviews __________________________________________________90
19.12 Technical Meetings _____________________________________________90
19.13 Quality Assurance/Quality Control _________________________________90
19.14 Independent Peer Review _________________________________________90
19.15 Supervision ____________________________________________________90
19.16 Coordination ___________________________________________________90
20 SIGNING AND PAVEMENT MARKING PLANS ________________________90
20.1 Key Sheet _____________________________________________________91
20.2 Summary of Pay Items Including Project Preconstruction (PrP) Input ______91
20.3 Tabulation of Quantities __________________________________________91
20.4 General Notes/Pay Item Notes _____________________________________91
20.5 Project Layout _________________________________________________91
20.6 Plan Sheet _____________________________________________________91
20.7 Typical Details _________________________________________________91
20.8 Guide Sign Work Sheet(s) ________________________________________91
20.9 Traffic Monitoring Site __________________________________________91
20.10 Cross Sections _________________________________________________91
20.11 Special Service Point Details ______________________________________91
20.12 Special Details _________________________________________________91
20.13 Interim Standards _______________________________________________91
20.14 Quality Assurance/Quality Control _________________________________91
20.15 Supervision ____________________________________________________91
21 SIGNALIZATION ANALYSIS ________________________________________91
21.1 Traffic Data Collection __________________________________________92
21.2 Traffic Data Analysis ____________________________________________92
21.3 Signal Warrant Study ____________________________________________92
21.4 Systems Timings _______________________________________________92
21.5 Reference and Master Signalization Design File _______________________92
21.6 Reference and Master Interconnect Communication Design File __________92
21.7 Overhead Street Name Sign Design _________________________________92
21.8 Pole Elevation Analysis __________________________________________92
21.9 Traffic Signal Operation Report____________________________________92
21.10 Quantities _____________________________________________________92
21.11 Cost Estimate __________________________________________________92
21.12 Technical Special Provisions ______________________________________92
21.13 Other Signalization Analysis ______________________________________92
21.14 Field Reviews __________________________________________________92
21.15 Technical Meetings _____________________________________________93
21.16 Quality Assurance/Quality Control _________________________________93
A-8
21.17 Independent Peer Review _________________________________________93
21.18 Supervision ____________________________________________________93
21.19 Coordination ___________________________________________________93
22 SIGNALIZATION PLANS ____________________________________________93
22.1 Key Sheet _____________________________________________________93
22.2 Summary of Pay Items Including Project Preconstruction (PrP) Input ______93
22.3 Tabulation of Quantities __________________________________________93
22.4 General Notes/Pay Item Notes _____________________________________93
22.5 Plan Sheet _____________________________________________________93
22.6 Interconnect Plans ______________________________________________94
22.7 Traffic Monitoring Site __________________________________________94
22.8 Guide Sign Worksheet ___________________________________________94
22.9 Special Details _________________________________________________94
22.10 Special Service Point Details ______________________________________94
22.11 Mast Arm/Monotube Tabulation Sheet ______________________________94
22.12 Strain Pole Schedule ____________________________________________94
22.13 TCP Signal (Temporary) _________________________________________94
22.14 Temporary Detection Sheet _______________________________________94
22.15 Utility Conflict Sheet ____________________________________________94
22.16 Interim Standards _______________________________________________94
22.17 Quality Assurance/Quality Control _________________________________94
22.18 Supervision ____________________________________________________94
23 LIGHTING ANALYSIS ______________________________________________94
23.1 Lighting Justification Report ______________________________________94
23.2 Lighting Design Analysis Report ___________________________________95
23.3 Aeronautical Evaluation N/A ______________________________________95
23.4 Voltage Drop Calculations ________________________________________95
23.5 FDEP Coordination and Report ____________________________________96
23.6 Reference and Master Design Files _________________________________96
23.7 Temporary Lighting _____________________________________________96
23.8 Design Documentation ___________________________________________96
23.9 Quantities _____________________________________________________96
23.10 Cost Estimate __________________________________________________96
23.11 Technical Special Provisions ______________________________________96
23.12 Other Lighting Analysis __________________________________________96
23.13 Field Reviews __________________________________________________96
23.14 Technical Meetings _____________________________________________97
23.15 Quality Assurance/Quality Control _________________________________97
23.16 Independent Peer Review _________________________________________97
23.17 Supervision ____________________________________________________97
23.18 Coordination ___________________________________________________97
24 LIGHTING PLANS __________________________________________________97
24.1 Key Sheet _____________________________________________________97
A-9
24.2 Summary of Pay Items Including Project Preconstruction (PrP) Input ______97
24.3 Tabulation of Quantities __________________________________________97
24.4 General Notes/Pay Item Notes _____________________________________97
24.5 Pole Data, Legend & Criteria ______________________________________97
24.6 Service Point Details ____________________________________________97
24.7 Project Layout _________________________________________________97
24.8 Plan Sheet _____________________________________________________97
24.9 Special Details _________________________________________________97
24.10 Temporary Lighting Data and Details _______________________________97
24.11 Traffic Control Plan Sheets _______________________________________97
24.12 Interim Standards _______________________________________________97
24.13 Quality Assurance/Quality Control _________________________________97
24.14 Supervision ____________________________________________________98
25 LANDSCAPE ARCHITECTURE ANALYSIS ___________________________98
25.1 Data Collection_________________________________________________98
25.2 Site Inventory and Analysis _______________________________________98
25.3 Planting Design ________________________________________________98
25.4 Irrigation Design _______________________________________________98
25.5 Hardscape Design_______________________________________________98
25.6 Plan Summary Boxes ____________________________________________99
25.7 Cost Estimates _________________________________________________99
25.8 Technical Special Provisions ______________________________________99
25.9 Other Landscape Architecture _____________________________________99
25.10 Outdoor Advertising ____________________________________________99
25.11 Field Reviews __________________________________________________99
25.12 Technical Meetings _____________________________________________99
25.13 Quality Assurance/Quality Control _________________________________99
25.14 Independent Peer Review _________________________________________99
25.15 Supervision ____________________________________________________99
25.16 Coordination ___________________________________________________99
25.17 Interdisciplinary Coordination _____________________________________99
26 LANDSCAPE ARCHITECTURE PLANS _______________________________99
26.1 Key Sheet _____________________________________________________99
26.2 Tabulation of Quantities __________________________________________99
26.3 General Notes __________________________________________________99
26.4 Tree and Vegetation Inventory, Protection and Relocation Plans __________99
26.5 Planting Plans for Linear Roadway Projects __________________________99
26.6 Planting Plans (Interchanges and Toll Plazas) ________________________100
26.7 Planting Details and Notes _______________________________________100
26.8 Irrigation Plans for Linear Roadway Project _________________________100
26.9 Irrigation Plans for Interchange and Toll Plazas ______________________100
26.10 Irrigation Details and Notes ______________________________________100
26.11 Hardscape Plans _______________________________________________100
26.12 Hardscape Details and Notes _____________________________________100
A-10
26.13 Maintenance Plan ______________________________________________100
26.14 Cost Estimate _________________________________________________100
26.15 Quality Assurance/Quality Control ________________________________100
26.16 Supervision ___________________________________________________100
27 SURVEY: (Completed under PD&E Phase) _____________________________100
27.1 Horizontal Project Control (HPC) (To Be Provided by the DEPARTMENT)
____________________________________________________________101
27.2 Vertical Project Control (VPC) (To Be Provided by the DEPARTMENT) _101
27.3 Alignment and/or Existing Right of Way (R/W) Lines _________________101
27.4 Aerial Targets _________________________________________________101
27.5 Reference Points_______________________________________________101
27.6 Topography/Digital Terrain Model (DTM) (3D) ______________________101
27.7 Planimetric (2D) _______________________________________________101
27.8 Roadway Cross Sections/Profiles _________________________________101
27.9 Side Street Surveys ____________________________________________101
27.10 Underground Utilities___________________________________________101
27.11 Outfall Survey ________________________________________________101
27.12 Drainage Survey _______________________________________________101
27.13 Bridge Survey (Minor/Major) ____________________________________102
27.14 Channel Survey _______________________________________________102
27.15 Pond Site Survey ______________________________________________102
27.16 Mitigation Survey _____________________________________________102
27.17 Jurisdiction Line Survey ________________________________________102
27.18 Geotechnical Support ___________________________________________102
27.19 Sectional/Grant Survey _________________________________________102
27.20 Subdivision Location ___________________________________________102
27.21 Maintained R/W _______________________________________________102
27.22 Boundary Survey ______________________________________________102
27.23 Water Boundary Survey _________________________________________102
27.24 Right of Way Staking, Parcel / Right of Way Line ____________________102
27.25 Right of Way Monumentation (To Be Provided During Post Design) _____102
27.26 Line Cutting __________________________________________________103
27.27 Work Zone Safety _____________________________________________103
27.28 Miscellaneous Surveys __________________________________________103
27.29 Supplemental Surveys __________________________________________103
27.30 Document Research (To Be Provided by the DEPARTMENT) __________103
27.31 Field Review _________________________________________________103
27.32 Technical Meetings ____________________________________________103
27.33 Quality Assurance/Quality Control (QA/QC) ________________________103
27.34 Supervision ___________________________________________________103
27.35 Coordination __________________________________________________103
A-11
28 PHOTOGRAMMETRY: N/A ________________________________________104
29 MAPPING: ________________________________________________________104
29.1 Alignment ____________________________________________________104
29.2 Section and 1/4 Section Lines ____________________________________104
29.3 Subdivisions / Property Lines ____________________________________104
29.4 Existing Right of Way __________________________________________104
29.5 Topography __________________________________________________104
29.6 Parent Tract Properties and Existing Easements ______________________104
29.7 Proposed Right of Way Requirements ______________________________104
29.8 Limits of Construction __________________________________________105
29.9 Jurisdictional/Agency Lines ______________________________________105
29.10 Control Survey Cover Sheet _____________________________________105
29.11 Control Survey Key Sheet _______________________________________105
29.12 Control Survey Detail Sheet _____________________________________105
29.13 Right of Way Map Cover Sheet (Not applicable to this project) __________105
29.14 Right of Way Map Key Sheet ____________________________________105
29.15 Right of Way Map Detail Sheet ___________________________________105
29.16 Maintenance Map Cover Sheet ___________________________________105
29.17 Maintenance Map Key Sheet _____________________________________105
29.18 Maintenance Map Detail Sheet ___________________________________105
29.19 Reference Point Sheet __________________________________________105
29.20 Project Network Control Sheet ___________________________________105
29.21 Table of Ownerships Sheet ______________________________________106
29.22 Parcel Sketches________________________________________________106
29.23 TIITF Sketches ________________________________________________106
29.24 Other Specific Purpose Survey(s) _________________________________106
29.25 Boundary Survey(s) Map ________________________________________106
29.26 Right of Way Monumentation Map (To Be Provided During Post Design) _106
29.27 Title Search Map ______________________________________________106
29.28 Title Search Report ____________________________________________106
29.29 Legal Descriptions (To Be Prepared by the DEPARTMENT) ___________106
29.30 Final Map/Plans Comparison _____________________________________106
29.31 Field Reviews _________________________________________________106
29.32 Technical Meetings ____________________________________________106
29.33 Quality Assurance/Quality Control ________________________________106
29.34 Supervision ___________________________________________________106
29.35 Coordination __________________________________________________106
29.36 Supplemental Mapping _________________________________________106
A-12
30 TERRESTRIAL MOBILE LiDAR: N/A ________________________________107
31 ARCHITECTURE DEVELOPMENT: N/A _____________________________107
32 NOISE BARRIERS IMPACT DESIGN ASSESSMENT IN THE DESIGN
PHASE ___________________________________________________________107
33 INTELLIGENT TRANSPORTATION SYSTEMS ANALYSIS ____________107
33.1 ITS Analysis __________________________________________________107
33.2 Communications Plan __________________________________________113
33.3 Lightning Protection Analysis ____________________________________114
33.4 Power Subsystem ______________________________________________114
33.5 Voltage Drop Calculations _______________________________________115
33.6 Design Documentation __________________________________________115
33.7 Existing ITS __________________________________________________115
33.8 Queue Analysis _______________________________________________115
33.9 Reference and Master ITS Design File _____________________________116
33.10 Reference and Master Communications Design File ___________________116
33.11 Pole Elevation Analysis _________________________________________116
33.12 Sign Panel Design Analysis ______________________________________116
33.13 Quantities ____________________________________________________116
33.14 Cost Estimate _________________________________________________116
33.15 Technical Special Provisions _____________________________________117
33.16 Other ITS Analyses N/A ________________________________________117
33.17 Field Reviews _________________________________________________117
33.18 Technical Meetings ____________________________________________117
33.19 Quality Assurance / Quality Control _______________________________117
33.20 Supervision ___________________________________________________118
33.21 Coordination __________________________________________________118
34 INTELLIGENT TRANSPORTATION SYSTEMS PLANS ________________118
34.1 Key Sheet ____________________________________________________118
34.2 Summary of Pay Items Including Project Preconstruction (PrP) Input _____118
34.3 Tabulation of Quantities _________________________________________118
34.4 General Notes / Pay Item Notes ___________________________________118
34.5 Project Layout ________________________________________________118
34.6 Typical and Special Details ______________________________________119
34.7 Plan Sheet ____________________________________________________119
34.8 ITS Communications Plans ______________________________________119
34.9 Fiber Optic Splice Diagrams _____________________________________120
34.10 Lightning Protection Plans _______________________________________120
34.11 Cross Sections ________________________________________________120
34.12 Guide Sign Work Sheet(s) _______________________________________120
34.13 Special Service Point Details _____________________________________120
34.14 Strain Pole Schedule ___________________________________________120
34.15 Overhead / Cantilever Sign Structure ______________________________120
34.16 Other Overhead Sign Structures (Long Span, Monotube, etc.) ___________121
A-13
34.17 Traffic Control Plans ___________________________________________121
34.18 Interim Standards ______________________________________________121
34.19 GIS Data and Asset Management Requirements ______________________122
34.20 Quality Assurance / Quality Control _______________________________122
34.21 Supervision ___________________________________________________122
35 GEOTECHNICAL __________________________________________________122
35.1 Document Collection and Review _________________________________123
35.2 Develop Detailed Boring Location Plan ____________________________124
35.3 Stake Borings/Utility Clearance ___________________________________124
35.4 Muck Probing _________________________________________________125
35.5 Coordinate and Develop MOT Plans for Field Investigation ____________125
35.6 Drilling Access Permits _________________________________________125
35.7 Property Clearances ____________________________________________125
35.8 Groundwater Monitoring ________________________________________125
35.9 LBR / Resilient Modulus Sampling ________________________________125
35.10 Coordination of Field Work ______________________________________125
35.11 Soil and Rock Classification - Roadway ____________________________125
35.12 Design LBR __________________________________________________126
35.13 Laboratory Data _______________________________________________126
35.14 Seasonal High Water Table ______________________________________126
35.15 Parameters for Water Retention Areas ______________________________127
35.16 Delineate Limits of Unsuitable Material ____________________________127
35.17 Electronic Files for Cross-Sections ________________________________127
35.18 Embankment Settlement and Stability ______________________________127
35.19 Monitor Existing Structures ______________________________________127
35.20 Stormwater Volume Recovery and/or Background Seepage Analysis _____127
35.21 Geotechnical Recommendations __________________________________127
35.22 Pavement Condition Survey and Pavement Evaluation Report (To Be Provided
By The DEPARTMENT) ________________________________________128
35.23 Preliminary Roadway Report _____________________________________128
35.24 Final Report __________________________________________________128
35.25 Auger Boring Drafting __________________________________________129
35.26 SPT Boring Drafting ___________________________________________129
35.27 Develop Detailed Boring Location Plan ____________________________130
35.28 Stake Borings/Utility Clearance ___________________________________130
35.29 Coordinate and Develop MOT Plans for Field Investigation ____________130
35.30 Drilling Access Permits _________________________________________130
35.31 Property Clearances ____________________________________________130
35.32 Collection of Corrosion Samples __________________________________130
35.33 Coordination of Field Work ______________________________________130
35.34 Soil and Rock Classification - Structures ___________________________131
35.35 Tabulation of Laboratory Data ____________________________________131
35.36 Estimate Design Groundwater Level for Structures ___________________131
35.37 Selection of Foundation Alternatives (BDR) N/A _____________________132
35.38 Detailed Analysis of Selected Foundation Alternate(s) N/A _____________132
A-14
35.39 Bridge Construction and Testing Recommendations N/A _______________132
35.40 Lateral Load Analysis (Optional) N/A ______________________________133
35.41 Walls N/A ___________________________________________________133
35.42 Sheet Pile Wall Analysis (Optional) N/A ___________________________133
35.43 Design Soil Parameters for Signs, Signals, High Mast Lights, and Strain Poles and Geotechnical Recommendations _______________________________133
35.44 Box Culvert Analysis N/A _______________________________________133
35.45 Preliminary Report BDR N/A ___________________________________133
35.46 Final Report - Bridge and Associated Walls N/A _____________________134
35.47 Final Reports - Signs, Signals, Box Culvert, Walls, and High Mast Lights _134
35.48 SPT Boring Drafting ___________________________________________135
35.49 Other Geotechnical_____________________________________________135
35.50 Technical Special Provisions _____________________________________135
35.51 Field Reviews _________________________________________________135
35.52 Technical Meetings ____________________________________________135
35.53 Quality Assurance/Quality Control ________________________________135
35.54 Supervision ___________________________________________________135
35.55 Coordination __________________________________________________136
36 PROJECT REQUIREMENTS ________________________________________136
36.1 Liaison Office_________________________________________________136
36.2 Key Personnel ________________________________________________136
36.3 Progress Reporting _____________________________________________136
36.4 Correspondence _______________________________________________136
36.5 Professional Endorsement _______________________________________136
36.6 Computer Automation __________________________________________136
36.7 Coordination with Other Consultants_______________________________137
36.8 Optional Services ______________________________________________137
37 INVOICING LIMITS _______________________________________________137
A-15
SCOPE OF SERVICES FOR CONSULTING ENGINEERING SERVICES
HIGHWAY AND BRIDGE/STRUCTURAL DESIGN
This Exhibit forms an integral part of the agreement between the State of Florida Department of Transportation (hereinafter referred to as the DEPARTMENT or FDOT) and DRMP, Inc (hereinafter referred to as the CONSULTANT) relative to the transportation facility described as follows:
Financial Project ID: 218630-2-32-01 Federal Aid Project No.: N/A County Section No.: 48080060 Description: SR 30 (US 98) Navy Boulevard from SR 295 to Bayou Chico Bridge County: Escambia Bridge No.: N/A Rail Road Crossing No: N/A
A-16
The purpose of this Exhibit is to describe the scope of work and the responsibilities of the CONSULTANT and the DEPARTMENT in connection with the design and preparation of a complete set of construction contract documents and incidental engineering services, as necessary, for improvements to the transportation facility described herein.
Major work mix include: MULTILANE HIGHWAY DESIGN
Major work groups include: 3.2, 8.2, 9.1
Minor work groups include: 4.1.1, 7.1, 7.2, 7.3, 15.0
Known alternative construction contracting methods include: N/A
The general objective is for the CONSULTANT to prepare a set of contract documents including plans, specifications, supporting engineering analysis, calculations and other technical documents in accordance with FDOT policy, procedures and requirements. These Contract documents will be used by the contractor to build the project and test the project components. These Contract documents will be used by the DEPARTMENT or its Construction Engineering Inspection (CEI) representatives for inspection and final acceptance of the project. The CONSULTANT shall follow a systems engineering process to ensure that all required project components are included in the development of the Contract documents and the project can be built as designed and to specifications.
The Scope of Services establishes which items of work in the Plans Preparation Manual and other pertinent manuals are specifically prescribed to accomplish the work included in this contract, and also indicate which items of work will be the responsibility of the CONSULTANT and/or the DEPARTMENT. This Scope of Services establishes the work necessary for Final (Phase IV) plans. Phase I (30% Plans) have been developed and approved by the Department under the PD&E Study FPID 218630-2-22-01.
The CONSULTANT shall be aware that as a project is developed, certain modifications and/or improvements to the original concepts may be required. The CONSULTANT shall incorporate these refinements into the design and consider such refinements to be an anticipated and integral part of the work. This shall not be a basis for any supplemental fee request(s).
The CONSULTANT shall demonstrate good project management practices while working on this project. These include communication with the DEPARTMENT and others as necessary, management of time and resources, and documentation. The CONSULTANT shall set up and maintain throughout the design of the project a contract file in accordance with DEPARTMENT procedures. CONSULTANTs are expected to know the laws and rules governing their professions and are expected to provide services in accordance with current regulations, codes and ordinances and recognized standards applicable to such professional services. The Consultant shall provide qualified technical and professional personnel to perform to Department standards and procedures, the duties and responsibilities assigned
A-17 under the terms of this agreement. The Consultant shall minimize to the maximum extent
Department.
The DEPARTMENT will provide contract administration, management services, and technical reviews of all work associated with the development and preparation of contract high-level conformance and are not meant to be comprehensive reviews. The CONSULTANT shall be fully responsible for all work performed and work products developed under this Scope of Services. The DEPARTMENT may provide job-specific information and/or functions as outlined in this contract, if favorable.
The CONSULTANT shall investigate the status of the projects and become familiar with concepts and commitments (typical sections, alignments, etc.) developed from prior studies. If a Preliminary Engineering Report is available from a prior or current Project Development and Environmental (PD&E) study, the CONSULTANT shall use the approved concepts as a basis for the design unless otherwise directed by the DEPARTMENT.
Financial Project ID: 218630-2-32-01
The CONSULTANT shall utilize the concepts and commitments (typical sections, alignments, etc.) developed in the concurrent PD&E Study unless otherwise directed by the DEPARTMENT.
All commitments contained in the PD&E documents will be carried forward into the Design and Construction phases.
This non-capacity project primarily consists of redeveloping the Navy Boulevard, State Road (SR) 30/US 98, corridor, from SR 295 to the Bayou Chico Bridge to a Complete Streets concept.
The typical section that ultimately results from the concurrent PD&E study will likely include maintaining the existing travel lanes but widening to include bicycle lanes, raised medians, sidewalk on both sides, auxiliary…
This is the start of the file's text. The full file is on GovTribe.