This document is a Standard Professional Services Agreement between the Florida Department of Transportation (FDOT) and Patel, Greene & Associates, P.L.L.C., with subconsultants Florida Transportation Engineering, Inc., Test Lab, Inc., and WBQ Design & Engineering, Inc. The agreement is for a highway improvement project in Flagler County, Florida, specifically involving the addition of a left turn lane on SR-20/SR-100/Highway 100 from 0.122 miles west of CR 305 to 0.230 miles east of CR 305.
The total maximum contract value is $354,881.00, comprised of a $256,361 lump sum for basic services and $98,520 in limiting amounts for geotechnical, design, and survey services. The contract scope includes roadway design, adding a left turn lane, resurfacing, drainage improvements, and related engineering tasks. The project involves widening approximately 1,930 feet of roadway, with services to be completed by October 9, 2017. Compensation will be based on percentage of completed services for the lump sum portion and actual time and expenses for the limiting amount portions, with no multipliers applied to the billing rates. The agreement includes various technical services such as survey, geotechnical analysis, and environmental compliance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-550000-C9G40-00120000.pdf | ||
| CN-550000-C9P40-00010000.pdf | ||
| CN-550000-C9P40-S0010000.pdf | ||
| CN-550000-C9P40-S0020000.pdf | ||
| CN-550000-C9P40-00020000.pdf | ||
| ContractBudgetExport.csv | CSV file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Stage III March 23, 2016
EXHIBIT “A”
SCOPE OF SERVICES
FOR
FINANCIAL PROJECT ID(S). 436126-1-32-01
DISTRICT 5
FLAGLER COUNTY
A-2
1 PURPOSE
2 PROJECT DESCRIPTION
3 PROJECT COMMON AND PROJECT GENERAL TASKS
4 ROADWAY ANALYSIS
5 ROADWAY PLANS
6A DRAINAGE ANALYSIS
6B DRAINAGE PLANS
7 UTILITIES
8 ENVIRONMENTAL PERMITS, COMPLIANCE AND CLEARANCES
9 STRUCTURES - SUMMARY AND MISCELLANEOUS TASKS AND DRAWINGS - N/A
10 STRUCTURES - BRIDGE DEVELOPMENT REPORT - N/A
11 STRUCTURES - TEMPORARY BRIDGE - N/A
12 STRUCTURES - SHORT SPAN CONCRETE BRIDGE - N/A
13 STRUCTURES - MEDIUM SPAN CONCRETE BRIDGE - N/A
14 STRUCTURES - STRUCTURAL STEEL BRIDGE - N/A
15 STRUCTURES - SEGMENTAL CONCRETE BRIDGE - N/A
16 STRUCTURES - MOVABLE SPAN - N/A
17 STRUCTURES - RETAINING WALLS - N/A
18 STRUCTURES - MISCELLANEOUS
19 SIGNING AND PAVEMENT MARKING ANALYSIS
20 SIGNING AND PAVEMENT MARKING PLANS
21 SIGNALIZATION ANALYSIS - N/A
22 SIGNALIZATION PLANS
23 LIGHTING ANALYSIS
24 LIGHTING PLANS
25 LANDSCAPE ARCHITECTURE ANALYSIS
26 LANDSCAPE ARCHITECTURE PLANS
27 SURVEY
28 PHOTOGRAMMETRY - N/A
29 MAPPING - N/A
30 TERRESTRIAL MOBILE LIDAR - N/A
31 ARCHITECTURE DEVELOPMENT - N/A
A-3
32 NOISE BARRIERS IMPACT DESIGN ASSESSMENT IN THE DESIGN PHASE - N/A 65
33 INTELLIGENT TRANSPORTATION SYSTEMS ANALYSIS - N/A
34 INTELLIGENT TRANSPORTATION SYSTEMS PLANS - N/A
35 GEOTECHNICAL
36 PROJECT REQUIREMENTS
37 INVOICING LIMITS
38 APPENDIX …………………………………………………………………………..…………78
A-4
SCOPE OF SERVICES FOR CONSULTING ENGINEERING SERVICES
HIGHWAY AND BRIDGE/STRUCTURAL DESIGN
This Exhibit forms an integral part of the agreement between the State of Florida Department of Transportation (hereinafter referred to as the DEPARTMENT or FDOT) and _Patel, Greene and Associates, PLLC (hereinafter referred to as the CONSULTANT) relative to the transportation facility described as follows:
Financial Project ID: 436126-1-32-01
Federal Aid Project No.: N/A
County Section No.: 73040-000
Description: SR-20/SR-100/Highway 100 add left turn lane, from 0.122 miles west of CR 305 to 0.230 miles east of CR 305 (MP 10.528 to (MP 10.882 Flagler County
Bridge No(s).: - N/A
Rail Road Crossing No: - N/A
1 PURPOSE
The purpose of this Exhibit is to describe the scope of work and the responsibilities of the CONSULTANT and the DEPARTMENT in connection with the design and preparation of a complete set of construction contract documents and incidental engineering services, as necessary, for improvements to the transportation facility described herein.
Major work mix includes: 0012 Resurfacing, 0548 Add Auxiliary Lane Major work groups include: 3.1 Minor work groups include: 4.1.1, 6.1, 7.1, 8.1, 8.2, 8.4, 9.1, 9.2, 9.3, 9.5
Known alternative construction contracting methods include: N/A
The general objective is for the CONSULTANT to prepare a set of contract documents including plans, specifications, supporting engineering analysis, calculations and other technical documents in accordance with FDOT policy, procedures and requirements. These Contract documents will be used by the contractor to build the project and test the project components. These Contract documents will be used by the DEPARTMENT or its Construction Engineering Inspection (CEI) representatives for inspection and final acceptance of the project. The CONSULTANT shall follow a systems engineering process to ensure that all required project components are included in the development of the Contract documents and the project can be built as designed and to specifications.
The Scope of Services establishes which items of work in the Plans Preparation Manual and other pertinent manuals are specifically prescribed to accomplish the work included in this
STAGE III FPID(S): 436126-1-32-01
March 23, 2016
A-5 contract, and also indicate which items of work will be the responsibility of the CONSULTANT and/or the DEPARTMENT.
The CONSULTANT shall be aware that as a project is developed, certain modifications and/or improvements to the original concepts may be required. The CONSULTANT shall incorporate these refinements into the design and consider such refinements to be an anticipated and integral part of the work. This shall not be a basis for any supplemental fee request(s).
The CONSULTANT shall demonstrate good project management practices while working on this project. These include communication with the DEPARTMENT and others as necessary, management of time and resources, and documentation. The CONSULTANT shall set up and maintain throughout the design of the project a contract file in accordance with DEPARTMENT procedures. CONSULTANTs are expected to know the laws and rules governing their professions and are expected to provide services in accordance with current regulations, codes and ordinances and recognized standards applicable to such professional services. The Consultant shall provide qualified technical and professional personnel to perform to Department standards and procedures, the duties and responsibilities assigned under the terms of this agreement. The Consultant shall minimize to the maximum extent possible the Department’s need to apply its own resources to assignments authorized by the Department.
The DEPARTMENT will provide contract administration, management services, and technical reviews of all work associated with the development and preparation of contract documents, including Construction documents. The Department’s technical reviews are for high-level conformance and are not meant to be comprehensive reviews. The CONSULTANT shall be fully responsible for all work performed and work products developed under this Scope of Services. The DEPARTMENT may provide job-specific information and/or functions as outlined in this contract, if favorable.
A-6
2 PROJECT DESCRIPTION
The CONSULTANT shall investigate the status of the project and become familiar with concepts and commitments (typical sections, alignments, etc.) developed from prior studies and/or activities. If a Preliminary Engineering Report is available from a prior or current Project Development and Environmental (PD&E) study, the CONSULTANT shall use the approved concepts as a basis for the design unless otherwise directed by the
DEPARTMENT.
The CONSULTANT shall provide for intersection improvements at the intersection of SR 100 and CR 305. Improvements shall include, but are not limited to, providing a left turn lane from WB SR 100 to SB CR 305, mitigate any impacts to the existing drainage and provide appropriate signing and pavement markings.
The Consultant shall use the comments and recommendations of the DEPARTMENT’s Technical Scope Report dated October 03, 2014 as basis for the design unless otherwise directed by the DEPARTMENT. The scope Report is attached as Appendix A.
2.1 Project General and Roadway (Activities 3, 4, and 5)
Public Involvement: CAP Level 2
Other Agency Presentations/Meetings: Flagler County
Joint Project Agreements: N/A
Specification Package Preparation: Included in the Project
Value Engineering: N/A
Risk Assessment Workshop: N/A
Plan Type: Plan Sheets (40’ scale)
Typical Section: Three Lane Undivided Rural
Pavement Design: Two Pavement Designs (Widening and Resurfacing) and Shoulders
Pavement Type Selection Report(s): N/A
Cross Slope: N/A
Access Management Classification: Class 3
Transit Route Features: N/A
A-7
Major Intersections/Interchanges: SR 100 @ CR 305
Roadway Alternative Analysis: N/A
Level of TCP Plans: Level 1
Temporary Lighting: N/A
Temporary Signals: N/A
Temporary Drainage: Yes
Design Variations/Exceptions: Potential Base Clearance
Back of Sidewalk Profiles: N/A
2.2 Drainage (Activities 6a and 6b)
System Type: Open System on southside
Drainage improvements on the Northside include shoulder gutter with inlets directly discharging to the adjacent canal.
The DEPARTMENT is responsible for the video inspection of the existing 2’x2’ box culvert to determine if any repairs or replacement is warranted. The CONSULTANT is responsible for the design of the culvert replacement if deemed warranted.
2.3 Utilities Coordination (Activity 7)
The CONSULTANT is responsible to certify that all necessary arrangements for utility work on this project have been made and will not conflict with the physical construction schedule. The CONSULTANT should coordinate with DEPARTMENT personnel to coordinate transmittals to Utility Companies and meet production schedules.
The CONSULTANT shall ensure FDOT standards, policies, procedures, practices, and design criteria are followed concerning utility coordination.
The CONSULTANT may employ more than one individual or utility engineering consultant to provide utility coordination and engineering design expertise. The CONSULTANT shall identify a dedicated person responsible for managing all utility coordination activities. This person shall be contractually referred to as the Utility Coordination Manager and shall be identified in the CONSULTANT proposal. The Utility Coordination Manager shall be required to satisfactorily demonstrate to the FDOT District Utilities Administrator that they have the following knowledge, skills, and expertise:
A minimum of 4 years of experience performing utility coordination in accordance with FDOT, Federal Highway Administration (FHWA), and American Association of State Highway and Transportation Officials (AASHTO) standards, policies, and procedures.
A thorough knowledge of the FDOT plans production process and District utility coordination process.
A-8
A thorough knowledge of FDOT agreements, standards, policies, and procedures.
The Utility Coordination Manager shall be responsible for managing all utility coordination, including the following:
Assuring that Utility Coordination and accommodation is in accordance to the FDOT, FHWA, and AASHTO standards, policies, procedures, and design criteria.
Assisting the engineer of record in identifying all existing utilities and coordinating any new installations. Assisting the Engineer of Record with resolving utility conflicts.
Scheduling and performing utility coordination meetings, keeping and distribution of minutes/action items of all utility meetings, and ensuring expedient follow-up on all unresolved issues.
Distributing all plans, conflict matrixes and changes to affected utility owners and making sure this information is properly coordinated and documented.
Identifying and coordinating the completion of any FDOT or utility owner agreement that is required for reimbursement, or accommodation of the utility facilities associated with the project.
Review and certify to the District Utilities Administrator that all Utility Work Schedules are correct and in accordance with the Department’s standards, policies, and procedures.
Prepare, review and process all utility related reimbursable paperwork inclusive of betterment and salvage determination.
The CONSULTANT’s utility coordination work shall be performed and directed by the Utility Coordination Manager that was identified and approved by FDOT’s Project Manager.
Any proposed change of the approved Utility Coordination Manager shall be subject to review and approval by FDOT’s Project Manager prior to any change being made in this contract.
AT&T Transmission, AT&T Distribution, FP&L- Flagler,
2.4 Environmental Permits, Compliances, and Clearances (Activity 8)
Expect General Permit from SJRWMD and ACOE Nationwide
The DEPARTMENT will provide compensatory wetland mitigation in accordance with Section 373.4137, Florida Statutes.
2.5 Structures (Activities 9 – 18) N/A
Bridge(s): N/A
Type of Bridge Structure Work:
BDR
Temporary Bridge
A-9
Short Span Concrete Medium Span Concrete Structural Steel Segmental Concrete Movable Span
Retaining Walls: N/A
Noise Barrier Walls: N/A
Miscellaneous: N/A
2.6 Signing and Pavement Markings (Activities 19 & 20)
2.7 Signalization (Activities 21 & 22) – N/A
2.8 Lighting (Activities 23 & 24) - N/A
2.9 Landscape Architecture - N/A
2.10 Survey (Activity 27)
Design Survey:
Subsurface Utility Exploration:
Right of Way Survey:
2.11 Photogrammetry (Activity 28) - N/A
2.12 Mapping (Activity 29) - N/A
2.13 Terrestrial Mobile LiDAR (Activity 30) - N/A
2.14 Architecture (Activity 31) - N/A
2.15 Noise Barriers (Activity 32) - N/A
2.16 Intelligent Transportation Systems (Activities 33 & 34) - N/A
2.17 Geotechnical (Activity 35) Borings
2.18 Project Schedule
Within ten (10) days after the Notice-To-Proceed, and prior to the CONSULTANT beginning work, the CONSULTANT shall provide a detailed project activity/event schedule for DEPARTMENT and CONSULTANT scheduled activities required to meet the current DEPARTMENT Production Date. The schedule shall be based upon the Production Date.
The current production date is November 01, 2017. The schedule shall be accompanied by an anticipated payout and fiscal progress curve. For the purpose of scheduling, the
A-10
CONSULTANT shall allow for a four week review time for each phase submittal and any other submittals as appropriate.
The schedule shall indicate all required submittals.
All fees and price proposals are to be based on the negotiated schedule of 17 months for final construction contract documents. However, the contract deadline is 17 months from the Notice to Proceed.
Periodically, throughout the life of the contract, the project schedule and payout and fiscal progress curves shall be reviewed and, with the approval of the DEPARTMENT, adjusted as necessary to incorporate changes in the Scope of Services and progress to date.
The approved schedule and schedule status report, along with progress and payout curves, shall be submitted with the monthly progress report.
The schedule shall be submitted in an FDOT system-compatible format.
2.19 Submittals
The CONSULTANT shall furnish construction contract documents as required by the DEPARTMENT to adequately control, coordinate, and approve the work concepts. The CONSULTANT shall distribute submittals as directed by the DEPARTMENT. The DEPARTMENT will determine the specific number of copies required prior to each submittal.
2.20 Provisions for Work
All work shall be prepared with English units in accordance with the latest editions of standards and requirements utilized by the DEPARTMENT which include, but are not limited to, publications such as:
General o Title 29, Part 1910, Standard 1910.1001, Code of Federal Regulations (29 C.F.R. 1910.1001) – Asbestos Standard for Industry, U.S. Occupational Safety and Health Administration (OSHA) o 29 C.F.R. 1926.1101 – Asbestos Standard for Construction, OSHA o 40 C.F.R. 61, Subpart M - National Emission Standard for Hazardous Air
Pollutants (NESHAP), Environmental Protection Agency (EPA) o 40 C.F.R. 763, Subpart E – Asbestos-Containing Materials in Schools, EPA o 40 C.F.R. 763, Subpart G – Asbestos Worker Protection, EPA o Americans with Disabilities Act (ADA) Standards for Accessible Design o AASHTO – A Policy on Design Standards Interstate System o AASHTO – Roadside Design Guide o AASHTO – Roadway Lighting Design Guide o AASHTO – A Policy for Geometric Design of Highways and Streets o AASHTO – Highway Safety Manual o Rule Chapter 5J-17, Florida Administrative Code (F.A.C.), Minimum
Technical Standards for Professional Surveyors and Mappers o Chapter 469, Florida Statutes (F.S.) – Asbestos Abatement
A-11 o Rule Chapter 62-257, F.A.C., Asbestos Program o Rule Chapter 62-302, F.A.C., Surface Water Quality Standards o Code of Federal Regulations (C.F.R.)
o Florida Administrative Codes (F.A.C.)
o Chapters 20, 120, 215, 455, Florida Statutes (F.S.) – Florida Department of
Business & Professional Regulations Rules o Florida Department of Environmental Protection Rules o FDOT Basis of Estimates Manual o FDOT Computer Aided Design and Drafting (CADD) Manual o FDOT Design Standards o FDOT Flexible Pavement Design Manual o FDOT - Florida Roundabout Guide o FDOT Handbook for Preparation of Specifications Package o FDOT Instructions for Design Standards o FDOT Instructions for Structures Related Design Standards o FDOT Manual of Uniform Minimum Standards for Design, Construction and
Maintenance for Streets and Highways (“Florida Greenbook”) o FDOT Materials Manual o FDOT Pavement Type Selection Manual o FDOT Plans Preparation Manual o FDOT Procedures and Policies o FDOT Project Development and Environmental Manual o FDOT Project Traffic Forecasting Handbook o FDOT Public Involvement Handbook o FDOT Rigid Pavement Design Manual o FDOT Standard Specifications for Road and Bridge Construction o FDOT Utility Accommodation Manual o Federal Highway Administration (FHWA) - Manual on Uniform Traffic
Control Devices (MUTCD) o FHWA – National Cooperative Highway Research Program (NCHRP) Report
672, Roundabouts: An Informational Guide o FHWA Roadway Construction Noise Model (RCNM) and Guideline
Handbook o Florida Fish and Wildlife Conservation Commission - Standard Manatee
Construction Conditions 2005 o Florida Statutes (F.S.)
o Florida’s Level of Service Standards and Guidelines Manual for Planning o Model Guide Specifications – Asbestos Abatement and Management in
Buildings, National Institute for Building Sciences (NIBS) o Quality Assurance Guidelines o Safety Standards o Any special instructions from the DEPARTMENT
Roadway o FDOT – Florida Intersection Design Guide o FDOT - Project Traffic Forecasting Handbook o FDOT - Quality/Level of Service Handbook
A-12 o Florida’s Level of Service Standards and Highway Capacity Analysis for the
SHS
o Transportation Research Board (TRB) - Highway Capacity Manual
Permits o Chapter 373, F.S. – Water Resources o US Fish and Wildlife Service Endangered Species Programs o Florida Fish and Wildlife Conservation Commission Protected Wildlife
Permits o Bridge Permit Application Guide, COMDTPUB P16591.3C o Building Permit
Drainage o FDOT Bridge Hydraulics Handbook o FDOT Culvert Handbook o FDOT Drainage Manual o FDOT Erosion and Sediment Control Manual o FDOT Exfiltration Handbook o FDOT Hydrology Handbook o FDOT Open Channel Handbook o FDOT Optional Pipe Materials Handbook o FDOT Storm Drain Handbook o FDOT Stormwater Management Facility Handbook o FDOT Temporary Drainage Handbook o FDOT Drainage Connection Permit Handbook o FDOT Bridge Scour Manual
Survey and Mapping o All applicable Florida Statutes and Administrative Codes o Applicable Rules, Guidelines Codes and authorities of other Municipal, County, State and Federal Agencies.
o FDOT Aerial Surveying Standards for Transportation Projects Topic 550-020-o FDOT Right of Way Mapping Handbook o FDOT Surveying Procedure Topic 550-030-101 o Florida Department of Transportation Right of Way Procedures Manual o Florida Department of Transportation Surveying Handbook o Right of Way Mapping Procedure 550-030-015
Traffic Engineering and Operations and ITS o AASHTO - An Information Guide for Highway Lighting o AASHTO - Guide for Development of Bicycle Facilities o FHWA Standard Highway Signs Manual o FDOT Manual on Uniform Traffic Studies (MUTS) o FDOT Median Handbook o FDOT Traffic Engineering Manual o National Electric Safety Code
A-13 o National Electrical Code
Florida’s Turnpike Enterprise o Florida’s Turnpike Plans Preparation and Practices Handbook (TPPPH) o Florida’s Turnpike Lane Closure Policy o Florida’s Turnpike Drainage Manual Supplement o Rigid Pavement Design Guide for Toll Locations with Electronic Toll
Collection o Flexible Pavement Design Guide for Toll Locations with Electronic Toll
Collection o Florida’s Turnpike General Tolling Requirements (GTR) o Additional Florida’s Turnpike Enterprise standards, guides, and policies for design and construction can be found on the FTE Design Website:
http://design.floridasturnpike.com
Traffic Monitoring o American Institute of Steel Construction (AISC) Manual of Steel Construction, referred to as “AISC Specifications” o American National Standards Institute (ANSI) RP-8-00 Recommended Practice for Roadway Lighting o AASHTO AWS D1.1/ANSI Structural Welding Code – Steel o AASHTO D1.5/AWS D1.5 Bridge Welding Code o FHWA Traffic Detector Handbook o FDOT General Interest Roadway Data Procedure o FHWA Traffic Monitoring Guide o FDOT’s Traffic/Polling Equipment Procedures
Structures o AASHTO Load and Resistance Factor Design (LRFD) Bridge Design Specifications and Interims o AASHTO LRFD Movable Highway Bridge Design Specifications and Interims o AASHTO Standard Specifications for Structural Supports for Highway Signs, Luminaires and Traffic Signals, and Interims.
o AASHTO/-AWS-D1. 5M/D1.5: An American National Standard Bridge Welding Code o AASHTO Guide Specifications for Structural Design of Sound Barriers o AASHTO Manual for Condition Evaluation and Load and Resistance Factor
Rating (LRFR) of Highway Bridges o FDOT Bridge Load Rating Manual o FDOT Structures Manual o FDOT Structures Design Bulletins (available on FDOT Structures web site only) o
Geotechnical o FHWA Checklist and Guidelines for Review of Geotechnical Reports and
A-14
Preliminary Specifications o Manual of Florida Sampling and Testing Methods o Soils and Foundation Handbook
Landscape Architecture o Florida Department of Agriculture and Consumer Services Grades and Standards for Nursery Plants
Architectural o Building Codes o Florida Building Code:
• Building
• Fuel Gas
• Mechanical
• Plumbing
• Existing Building o Florida Accessibility Code for Building Construction o Rule Chapter 60D, F.A.C., Division of Building Construction o Chapter 553, F.S. – Building Construction Standards o ANSI A117.1 2003 Accessible and Usable Building and Facilities o Titles II and III, Americans With Disabilities Act (ADA), Public Law 101-
336; and the ADA Accessibility Guidelines (ADAAG)
Architectural – Fire Codes and Rules o National Fire Protection Association (NFPA) - Life Safety Code o NFPA 70 - National Electrical Code o NFPA 101 - Life Safety Code o NFPA 10 - Standard for Portable Fire Extinguishers o NFPA 11 - Standard for Low-Expansion Foam Systems o NFPA 11A - Standard for High- and Medium-Expansion Foam Systems o NFPA 12 - Standard for Carbon Dioxide Extinguishing Systems o NFPA 13 - Installation of Sprinkler Systems o NFPA 30 - Flammable and Combustible Liquids Code o NFPA 54 - National Gas Fuel Code o NFPA 58 - LP-Gas Code o Florida Fire Prevention Code as adopted by the State Fire Marshal –
Consult with the Florida State Fire Marshal’s office for other frequently used codes.
Architectural – Extinguishing Systems o NFPA 10 - Fire Extinguishers o NFPA 13 - Sprinkler o NFPA 14 - Standpipe and Hose System o NFPA 17 - Dry Chemical o NFPA 20 - Centrifugal Fire Pump o NFPA 24 - Private Fire Service Mains
A-15 o NFPA 200 - Standard on Clean Agent Fire Extinguishing Systems
Architectural – Detection and Fire Alarm Systems o NFPA 70 - Electrical Code o NFPA 72 - Standard for the Installation, Maintenance and Use of Local
Protective Signaling Systems o NFPA 72E - Automatic Fire Detectors o NFPA 72G - Installation, Maintenance, and Use of Notification Appliances o NFPA 72H -Testing Procedures for Remote Station and Proprietary Systems o NFPA 74 - Household Fire Warning Equipment o NFPA 75 - Protection of Electronic Computer Equipment
Architectural – Mechanical Systems o NFPA 90A - Air Conditioning and Ventilating Systems o NFPA 92A - Smoke Control Systems o NFPA 96 - Removal of Smoke and Grease-Laden Vapors from Commercial
Cooking Equipment o NFPA 204M - Smoke and Heating Venting
Architectural – Miscellaneous Systems o NFPA 45 - Laboratories Using Chemicals o NFPA 80 - Fire Doors and Windows o NFPA 88A - Parking Structures o NFPA 105- Smoke and Draft-control Door Assemblies o NFPA 110 - Emergency and Standby Power Systems o NFPA 220 - Types of Building Construction o NFPA 241 - Safeguard Construction, Alteration, and Operations o Rule Chapter 69A-47, F.A.C., Uniform Fire Safety For Elevators o Rule Chapter 69A-51, F.A.C., Boiler Safety
Architectural – Energy Conservation o Rule Chapter 60D-4, F.A.C., Rules For Construction and Leasing of State Buildings To Insure Energy Conservation o Section 255.255, F.S., Life-Cycle Costs
Architectural – Elevators o Rule Chapter 61C-5, F.A.C., Florida Elevator Safety Code o ASME A-17.1, Safety Code for Elevators and Escalators o Architectural – Floodplain Management Criteria o Section 255.25, F.S., Approval Required Prior to Construction or Lease of
Buildings o Rules of the Federal Emergency Management Agency (FEMA)
Architectural – Other o Rule Chapter 64E-6, F.A.C., Standards for On Site Sewage Disposal Systems (Septic Tanks) o Rule Chapter 62-600, F.A.C., Domestic Wastewater Facilities
A-16 o Rule Chapter 62-761, F.A.C., Underground Storage Tank Systems o American Concrete Institute o American Institute of Architects - Architect’s Handbook of Professional
Practice o American Society for Testing and Materials - ASTM Standards o Brick Institute of America o DMS - Standards for Design of State Facilities o Florida Concrete Products Association o FDOT – ADA/Accessibility Procedure o FDOT – Building Code Compliance Procedure o FDOT – Design Build Procurement and Administration o LEED (Leadership in Energy and Environmental Design) Green Building
Rating System o National Concrete Masonry Association o National Electrical Code o Portland Cement Association - Concrete Masonry Handbook o United State Green Building Council (USGBC)
2.21 Services to be Performed by the DEPARTMENT When appropriate and /or available, the DEPARTMENT will provide project data including:
Numbers for field books.
Preliminary Horizontal Network Control.
Access for the CONSULTANT to utilize the DEPARTMENT’s Information
Technology Resources.
All Department agreements with Utility Agency Owner (UAO).
All certifications necessary for project letting.
Building Construction Permit Coordination (Turnpike) All information that may come to the DEPARTMENT pertaining to future improvements.
All future information that may come to the DEPARTMENT during the term of the CONSULTANT’s Agreement, which in the opinion of the DEPARTMENT is necessary for the prosecution of the work.
Available traffic and planning data.
All approved utility relocations.
Project utility certification to the DEPARTMENT’s Central Office.
Any necessary title searches.
Engineering standards review services.
All available information in the possession of the DEPARTMENT pertaining to utility companies whose facilities may be affected by the proposed construction.
All future information that may come to the DEPARTMENT pertaining to subdivision plans so that the CONSULTANT may take advantage of additional areas that can be utilized as part of the existing right of way.
Systems traffic for Projected Design Year, with K, D, and T factors.
Existing right of way maps.
Existing cross slope data for all RRR projects.
Existing pavement evaluation report for all RRR projects.
PD&E Documents
A-17
Design Reports Letters of authorization designating the CONSULTANT as an agent of the
DEPARTMENT in accordance with F.S. 337.274.
Phase reviews of plans and engineering documents.
Regarding Environmental Permitting Services:
o Approved Permit Document when available.
o Approval of all contacts with environmental agencies.
o General philosophies and guidelines of the DEPARTMENT to be used in the fulfillment of this contract. Objectives, constraints, budgetary limitations, and time constraints will be completely defined by the Project Manager.
o Appropriate signatures on application forms.
A-18
3 PROJECT COMMON AND PROJECT GENERAL TASKS
Project Common Tasks
Project Common Tasks, as listed below, are work efforts that are applicable to many project activities, 4 (Roadway Analysis) through 35 (Geotechnical). These tasks are to be included in the project scope in each applicable activity when the described work is to be performed by the CONSULTANT.
Cost Estimates: The CONSULTANT shall be responsible for producing a construction cost estimate and reviewing and updating the cost estimate when scope changes occur and/or at milestones of the project. Prior to 60% plans and completion of quantities, the DEPARTMENT’s Long Range Estimate (L.R.E.) system will be used to produce a conceptual estimate, according to District policy. Once the quantities have been developed (beginning at 60% plans and no later than 90% plans) the CONSULTANT shall be responsible for inputting the pay items and quantities into TRNS*PORT PES (Proposal Estimating System) through the use of the DEPARTMENT’s Designer Interface for generating the summary of quantities and the FDOT’s in-house estimates. A Summary of Pay Items sheet shall be prepared with all required Phase II, III, and IV Plans submittals.
Technical Special Provisions: The CONSULTANT shall provide Technical Special Provisions for all items of work not covered by the Standard Specifications for Road and Bridge Construction and the workbook of implemented modifications.
A Technical Special Provision shall not modify the first nine sections of the Standard Specifications and implemented modifications in any way. All modifications to other sections must be justified to the appropriate District Specifications Office to be included in the project's specifications package.
The Technical Special Provisions shall provide a description of work, materials, equipment and specific requirements, method of measurement and basis of payment. Proposed Technical Special Provisions will be submitted to the District Specifications Office for initial review at the time of the Phase III plans review submission to the DEPARTMENT’s Project Manager. This timing will allow for adequate processing time prior to final submittal. The Technical Special Provisions will be reviewed for suitability in accordance with the Handbook for Preparation of Specification Packages. The District Specifications Office will forward the Technical Special Provisions to the District Legal Office for their review and comment. All comments will be returned to the CONSULTANT for correction and resolution. Final Technical Special Provisions shall be digitally signed and sealed in accordance with applicable Florida Statutes.
The CONSULTANT shall contact the appropriate District Specifications Office for details of the current format to be used before starting preparations of Technical Special Provisions.
Field Reviews: The CONSULTANT shall make as many trips to the project site as required to obtain necessary data for all elements of the project.
A-19
Technical Meetings: The CONSULTANT shall attend all technical meetings necessary to execute the Scope of Services of this contract. This includes meetings with DEPARTMENT and/or Agency staff, between disciplines and subconsultants, such as access management meetings, pavement design meetings, local governments, railroads, airports, progress review meetings (phase review), and miscellaneous meetings. The CONSULTANT shall prepare, and submit to the DEPARTMENT’s Project Manager for review, the meeting minutes for all meetings attended by them. The meeting minutes are due within five (5) working days of attending the meeting.
Quality Assurance/Quality Control: It is the intention of the DEPARTMENT that design CONSULTANTS, including their subconsultant(s), are held responsible for their work, including plans review. The purpose of CONSULTANT plan reviews is to ensure that CONSULTANT plans follow the plan preparation procedures outlined in the Plans Preparation Manual, that state and federal design criteria are followed with the DEPARTMENT concept, and that the CONSULTANT submittals are complete. All subconsultant document submittals shall be submitted by the subconsultant directly to the CONSULTANT for their independent Quality Assurance/Quality Control review and subsequent submittal to the DEPARTMENT.
It is the CONSULTANT'S responsibility to independently and continually QC their plans and other deliverables. The CONSULTANT should regularly communicate with the DEPARTMENT's Design Project Manager to discuss and resolve issues or solicit opinions from those within designated areas of expertise.
The CONSULTANT shall be responsible for the professional quality, technical accuracy and coordination of all surveys, designs, drawings, specifications and other services furnished by the CONSULTANT and their subconsultant(s) under this contract.
The CONSULTANT shall provide a Quality Control Plan that describes the procedures to be utilized to verify, independently check, and review all maps, design drawings, specifications, and other documentation prepared as a part of the contract. The CONSULTANT shall describe how the checking and review processes are to be documented to verify that the required procedures were followed. The Quality Control Plan shall be one specifically designed for this project. The CONSULTANT shall submit a Quality Control Plan for approval within twenty (20) business days of the written Notice to Proceed and it shall be signed by the CONSULTANT’s Project Manager and the CONSULTANT QC Manager. The Quality Control Plan shall include the names of the CONSULTANT’s staff that will perform the quality control reviews. The Quality Control reviewer shall be a Florida Licensed Professional Engineer fully prequalified under F.A.C.
14-75 in the work type being reviewed. A marked up set of prints from a Quality Control Review indicating the reviewers for each component (structures, roadway, drainage, signals, geotechnical, signing and marking, lighting, surveys, etc.) and a written resolution of comments on a point-by-point basis will be required, if requested by the DEPARTMENT, with each phase submittal. The responsible Professional Engineer, Landscape Architect, or Professional Surveyor & Mapper that performed the Quality Control review will sign a statement certifying that the review was conducted and found to meet required specifications.
A-20
The CONSULTANT shall, without additional compensation, correct all errors or deficiencies in the designs, maps, drawings, specifications and/or other products and services.
Independent Peer Review: When directed by the DEPARTMENT, a subconsultant may perform Independent Peer Reviews. This project does not include Independent Peer Review.
Independent Peer Review and a Constructability/Bidability Review for design Phase Plans document submittals are required on this project. These separate reviews shall be completed by someone who has not worked on the plan component that is being reviewed. These could include, but are not limited to a separate office under the Prime’s umbrella, a subconsultant that is qualified in the work group being reviewed, or a CEI. It does not include persons who have knowledge of the day to day design efforts. The Constructability/Bidability Review shall be performed by a person with experience working on Department construction projects (CEI, Contractor, etc.).
The Independent Peer Review for design Phase Plans submittals shall ensure the plans meet the PPM, Design Standards and CADD Manual. The Constructability/Bidability Review shall ensure the project can be constructed and paid for as designed.
Constructability/Bidability Reviews should be conducted prior to the Phase III and Phase IV submittals, using the Phase Review Checklist (Guidance Document 1-1-A) from the Construction Project Administration Manual (CPAM) as a minimum guideline. The CONSULTANT shall submit this checklist, as well as the “marked-up” set of plans during this review, and review comments and comment responses from any previous Constructability/Bidability reviews. These items will be reviewed by District Design and District Construction.
Supervision: The CONSULTANT shall supervise all technical design activities.
Coordination: The CONSULTANT shall coordinate with all disciplines of the project to produce a final set of construction documents.
Project General Tasks
Project General Tasks, described in Sections 3.1 through 3.7 below, represent work efforts that are applicable to the project as a whole and not to any one or more specific project activity. The work described in these tasks shall be performed by the CONSULTANT when included in the project scope.
3.1 Public Involvement
Public involvement includes communicating to all interested persons, groups, and government organizations information regarding the development of the project. The CONSULTANT shall provide to the DEPARTMENT drafts of all Public Involvement documents (i.e., newsletters, property owner letters, advertisements, etc.) associated with the following tasks for review and approval at least 30 business days prior to printing and / or distribution.
A-21
3.1.1 Community Awareness Plan
Prepare a Community Awareness Plan (CAP) for review and approval by the DEPARTMENT within 30 calendar days after receiving Notice to Proceed. The objective of the plan is to notify local governments, affected property owners, tenants, and the public of the DEPARTMENT’S proposed construction and the anticipated impact of that construction. The CAP shall address timeframes for each review and shall include tentative dates for each public involvement requirement for the project. The CAP will also document all public involvement activities conducted throughout the project’s duration. In addition to the benefits of advance notification, the process should allow the DEPARTMENT to resolve controversial issues during the design phase. This item shall be reviewed and updated periodically as directed by the DEPARTMENT throughout the life of the project.
3.1.2 Notifications
In addition to public involvement data collection, the CONSULTANT shall assist the DEPARTMENT or prepare notifications, flyers, and/or letters to elected officials and other public officials, private property owners, and tenants at intervals during plans production as identified by the DEPARTMENT. All letters and notices shall be reviewed by the Department to ensure that they are addressed to the correct and current public officials.
3.1.3 Preparing Mailing Lists
At the beginning of the project, The CONSULTANT shall identify all impacted property owners and tenants (within a minimum of 300 feet of the project corridor) The CONSULTANT shall prepare a mailing list of all such entities and shall update the mailing list as needed during the life of the project.
3.1.4 Median Modification Letters - N/A
The CONSULTANT shall prepare a median modification letter to be sent to property owners along the corridor. In addition, the CONSULTANT shall prepare a sketch of each proposed median modification for inclusion in the letter. The letters will be sent on DEPARTMENT letterhead by the CONSULTANT.
3.1.5 Driveway Modification Letters - N/A
The CONSULTANT shall prepare a driveway modification letter to be sent to property owners along the corridor. In addition, the CONSULTANT shall prepare a sketch of each proposed driveway modification for inclusion in the letter. The letters will be sent on DEPARTMENT letterhead.
3.1.6 Newsletters
The CONSULTANT shall prepare newsletters for distribution to elected officials, public officials, property owners along the corridor and other interested parties. The letters will be sent by the CONSULTANT.
3.1.7 Renderings and Fly-Throughs - N/A
The CONSULTANT shall prepare renderings and fly-throughs for use in public meetings.
A-22
3.1.8 PowerPoint Presentations - N/A
The CONSULTANT shall prepare PowerPoint presentations for use in public meetings.
3.1.9 Public Meeting Preparations - N/A
The CONSULTANT shall prepare the necessary materials for use in public meetings.
The CONSULTANT will investigate potential meeting sites to advise the DEPARTMENT on their suitability. The CONSULTANT will pay all costs for meeting site rents and insurance. No DEPARTMENT meetings will be held on public school system properties.
3.1.10 Public Meeting Attendance and Follow-up - N/A
The CONSULTANT shall attend public meeting(s), assist with meeting setup and take down. The CONSULTANT shall also prepare a summary of the public meeting that includes all copies of all materials shown or provided at the public meeting. The summary shall also include a listing of all written comments made during or after the meeting and responses to those written comments.
The CONSULTANT will attend the meetings with an appropriate number of personnel to assist the DEPARTMENT'S Project Manager.
It is estimated for this project there will be no Public meetings during the design.
3.1.11 Other Agency Meetings
3.1.12 Web Site - N/A
3.2 Joint Project Agreements - N/A
3.3 Specifications Package Preparation
The CONSULTANT shall prepare and provide a specifications package in accordance with the DEPARTMENT’S Handbook for the Preparation of Specification Packages and associated training. The CONSULTANT shall provide the DEPARTMENT names of at least two team members who have successfully completed the Specifications Package Preparation Training and will be responsible for preparing the Specifications Package for the project. The Specifications Package shall be prepared using the DEPARTMENT's Specs on the Web application. The CONSULTANT shall be able to document that the procedure defined in the Handbook for the Preparation of Specifications Packages is followed, which includes the quality assurance/quality control procedures. The specifications package shall address all items and areas of work and include any Mandatory Specifications, Modified Special Provisions, and Technical Special Provisions.
The specifications package must be submitted for review to the District Specifications Office at least 30 days prior to the contract package to Tallahassee or District due date, or sooner if required by the District Specifications Office. This submittal does not require signing and sealing and shall be coordinated through the District’s Project Manager. The CONSULTANT shall coordinate with the DEPARTMENT on the submittal requirements, but at a minimum shall consist of (1) the complete specifications package, (2) a copy of the marked-up workbook used to prepare the package, and (3) a copy of the final project plans.
A-23
Final submittal of the specifications package must occur at least 10 working days prior to the contract package to Tallahassee due date. This submittal shall be digitally signed, dated, and sealed in accordance with applicable Florida Statutes.
3.4 Contract Maintenance and Electronic Document Management System (EDMS)
Contract maintenance includes project management effort for complete setup and maintenance of files, developing monthly progress reports, schedule updates, work effort to develop and execute subconsultant agreements, etc.
3.5 Value Engineering (Multi-Discipline Team) Review - N/A
3.6 Prime Consultant Project Manager Meetings
Includes only the Prime Consultant Project Manager's time for travel and attendance at Activity Technical Meetings and other meetings listed in the meeting summary for Task 3.6 on tab 3 Project General Task of the staff hour forms. Staff hours for other personnel attending Activity Technical Meetings are included in the meeting task for that specific Activity.
3.7 Plans Update - N/A
3.8 Post Design Services
Post Design Services may include, but not limited to, meetings, construction assistance, plans revisions, shop drawing review, survey services, as-built drawings, and load ratings.
Specific services will be negotiated at a later date as necessary as a contract amendment.
Post Design Services are not intended for instances of CONSULTANT errors and/or omissions.
3.9 Digital Delivery
The CONSULTANT shall deliver final contract plans and documents in digital format. The final contract plans and documents shall be digitally signed and sealed files delivered to the DEPARTMENT on acceptable electronic media, as determined by the DEPARTMENT.
3.10 Risk Assessment Workshop - N/A
3.11 Railroad, Transit and/or Airport Coordination - N/A
3.12 Other Project General Tasks - N/A
A-24
4 ROADWAY ANALYSIS
The CONSULTANT shall analyze and document Roadway Tasks in accordance with all applicable manuals, guidelines, standards, handbooks, procedures, and current design memorandums.
4.1 Typical Section Package
The CONSULTANT shall provide an approved Typical Section Package prior to the first plans submittal.
4.2 Pavement Type Selection Report N/A
Pavement Type Selection Reports are required for every project one mile or greater in length where work includes a modification to the base materials. The Pavement Type Selection decision will again be reviewed by FDOT Design at the time the pavement is designed to warrant reconsideration. A letter to the Project Design File documenting the pavement type decision is required, even if no report is performed.
4.3 Pavement Design Package
The CONSULTANT shall provide an approved Pavement Design Package prior to the Phase II plans submittal date.
4.4 Cross-Slope Correction N/A
4.5 Horizontal/Vertical Master Design Files
The CONSULTANT shall design the geometrics using the design standards that are most appropriate with proper consideration given to the design traffic volumes, design speed, capacity and levels of service, functional classification, adjacent land use, design consistency and driver expectancy, aesthetics, pedestrian and bicycle concerns, ADA requirements, elder road user policy, access management, PD&E documents and scope of work. The CONSULTANT shall also develop utility conflict information to be provided to project Utility Coordinator in the format requested by the DEPARTMENT, and shall review Utility Work Schedules.
4.6 Access Management - N/A
4.7 Roundabout Evaluation N/A
The CONSULTANT shall analyze and document Roundabout Evaluation Tasks in accordance with all applicable manuals, guidelines, standards, handbooks, procedures, and current design memorandums.
The CONSULTANT shall perform a Roundabout Screening for assessment of potential site impacts such as utility adjustments or relocations, right-of-way takes, environmental mitigation, and access management.
The CONSULTANT shall perform a Roundabout b/c Evaluation comparing a roundabout with a traditional intersection (stop controlled or signal controlled). The b/c analysis
A-25 considers safety benefits associated with reduced crashes, delay, life cycle costs including right-of-way, utilities, construction, operation, and maintenance.
The CONSULTANT shall perform a Geometric and Operation Analysis to establish the roundabout alignment, geometry and lane requirements. Roundabout geometric and operational analysis must be documented in a preliminary report including data collection, conceptual layout, crash analysis, traffic counts, traffic forecast, and future design and opening year analysis.
The CONSULTANT shall perform all efforts required for traffic data collection and required design elements for all the above steps accordingly, including crash reports, 24 hour machine counts, peak hour turning movement counts, existing geometrics, pedestrian and bicycle volumes, posted speed limits, delay counts, design vehicle, access management, transit operations and physical and right of way limitations.
4.8 Roundabout Final Design Analysis N/A
The CONSULTANT shall finalize the design of the roundabout in accordance with all applicable manuals, guidelines, standards, handbooks, procedures, and current design memorandums.
The CONSULTANT shall perform a final roundabout operational analysis that recommends a functional geometric layout that is cost effective, safe and meets the needs of the community. A final roundabout design will be recommended for implementation, and all geometric and operational analysis will be documented in a final roundabout report.
4.9 Cross Section Design Files
The CONSULTANT shall establish and develop cross section design files in accordance with the CADD manual.
4.10 Traffic Control Analysis
The CONSULTANT shall design a safe and effective Traffic Control Plan to move vehicular and pedestrian traffic during all phases of construction. The design shall include construction phasing of roadways ingress and egress to existing property owners and businesses, routing, signing and pavement markings, and detour quantity tabulations, roadway pavement, drainage structures, ditches, front slopes, back slopes, drop offs within clear zone, and traffic monitoring sites. Special consideration shall be given to the construction of the drainage system when developing the construction phases. Positive drainage must be maintained at all times. The design shall include construction phasing of roadways to accommodate the construction or relocation of utilities when the contract includes Joint Project Agreements (JPAs).
The CONSULTANT shall investigate the need for temporary traffic signals, temporary lighting, alternate detour roads, and the use of materials such as sheet piling in the analysis.
The Traffic Control Plan shall be prepared by a certified designer who has completed training as required by the DEPARTMENT. Before proceeding with the Traffic Control Plan, the CONSULTANT shall meet with the appropriate DEPARTMENT personnel. The purpose of this meeting is to provide information to the CONSULTANT that will better coordinate the Preliminary and Final Traffic Control Plan efforts.
The CONSULTANT shall consider the local impact of any lane closures or alternate routes.
A-26
When the need to close a road is identified during this analysis, the CONSULTANT shall notify the DEPARTMENT's Project Manager as soon as possible. Proposed road closings must be reviewed and approved by the DEPARTMENT. Diligence shall be used to minimize negative impacts by appropriate specifications, recommendations or plans development. Local impacts to consider will be local events, holidays, peak seasons, detour route deterioration and other eventualities. CONSULTANT shall be responsible to obtain local authorities permission for use of detour routes not on state highways.
4.11 Master TCP Design Files
The CONSULTANT shall develop master Traffic Control Plan (TCP) files (for Level II and Level III only) showing each phase of the Traffic Control Plan.
4.12 Design Variations and Exceptions
If available, the DEPARTMENT shall furnish the Variation/Exception Report. The CONSULTANT shall prepare the documentation necessary to gain DEPARTMENT approval of all appropriate Design Variations and/or Design Exceptions before the first submittal.
4.13 Design Report
The CONSULTANT shall prepare all applicable…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .