This document is a comprehensive Scope of Services for a transportation infrastructure project prepared by the Florida Department of Transportation (FDOT) for Connelly & Wicker, Inc. as the consulting engineering firm. The project involves a safety improvement at the intersection of State Road 5 (US 1) and Suntree Boulevard in Brevard County, Florida. Key stakeholders include FDOT, Brevard County, City of Cocoa, and multiple utility companies such as Florida Power and Light, AT&T, and Level 3 Communications. The project will involve coordination with local agencies, utility providers, and the St. Johns River Water Management District.
The project scope includes constructing a second northbound left-turn lane on US 1, adding a westbound receiving lane and an eastbound right-turn lane on Suntree Boulevard, and implementing signal improvements. The work will involve roadway design, drainage analysis, utility coordination, geotechnical investigations, and traffic signal modifications. A safety study conducted prior to the project documented 68 crashes over three years, supporting the need for these improvements. The total estimated cost of the project is approximately $957,116, with a benefit-cost ratio of 21.79, indicating significant safety and operational benefits. The contract is structured as a pay-item agreement with a planned production date of November 1, 2017 and an anticipated project duration of 18 months.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-550000-C9P27-00010000.pdf | ||
| CN-550000-C9P27-00020000.pdf | ||
| CN-550000-C9P27-00050000.pdf | ||
| CN-550000-C9P27-00030000.pdf | ||
| CN-550000-C9P27-00040000.pdf | ||
| CN-550000-C9P27-S0010000.pdf | ||
| CN-550000-C9V86-00120000.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
March 24, 2016
EXHIBIT A
SCOPE OF SERVICES
FOR
FINANCIAL PROJECT ID(S). 436237-1-32-01
FEDERAL PROJECT NO. 4856-062-P
DISTRICT FIVE
BREVARD COUNTY
A-2
1 PURPOSE __________________________________________________________32
2 PROJECT DESCRIPTION ___________________________________________34
2.1 Project General and Roadway (Activities 3, 4, and 5) ___________________34
2.2 Drainage (Activities 6a and 6b) ____________________________________35
2.3 Utilities Coordination (Activity 7) __________________________________35
2.4 Environmental Permits, Compliances, and Clearances (Activity 8) ________37
2.5 Structures (Activities 9 – 18) ______________________________________37
2.6 Signing and Pavement Markings (Activities 19 & 20) __________________38
2.7 Signalization (Activities 21 & 22) __________________________________38
2.8 Lighting (Activities 23 & 24) (Not applicable to this project)_____________38
2.9 Landscape Architecture (Activities 25 & 26) (Not applicable to this project) 38
2.10 Survey (Activity 27) _____________________________________________38
2.11 Photogrammetry (Activity 28) (Not applicable to this project) ____________38
2.12 Mapping (Activity 29) ___________________________________________38
2.13 Terrestrial Mobile LiDAR (Activity 30) (Not applicable to this project) ____39
2.14 Architecture (Activity 31) (Not applicable to this project) _______________39
2.15 Noise Barriers (Activity 32) (Not applicable to this project) ______________39
2.16 Intelligent Transportation Systems (Activities 33 & 34) _________________39
2.17 Geotechnical (Activity 35) ________________________________________40
2.18 Project Schedule ________________________________________________41
2.19 Submittals _____________________________________________________41
2.20 Provisions for Work _____________________________________________41
2.21 Services to be Performed by the DEPARTMENT When appropriate and /or available, the DEPARTMENT will provide project data including: ________47
3 PROJECT COMMON AND PROJECT GENERAL TASKS _______________48
Project Common Tasks ________________________________________________48 Project General Tasks _________________________________________________51
3.1 Public Involvement _____________________________________________51
3.1.1 Community Awareness Plan ______________________________________51
3.1.2 Notifications ___________________________________________________51
3.1.3 Preparing Mailing Lists __________________________________________52
3.1.4 Median Modification Letters ______________________________________52
3.1.5 Driveway Modification Letters ____________________________________52
3.1.6 Newsletters (Not applicable to this project) ___________________________52
3.1.7 Renderings and Fly-Throughs (Not applicable to this project) ____________52
3.1.8 PowerPoint Presentations _________________________________________52
3.1.9 Public Meeting Preparations ______________________________________52
3.1.10 Public Meeting Attendance and Follow-up ___________________________52
3.1.11 Other Agency Meetings The consultant will meet with the county, city and other agencies as required. ________________________________________53
3.1.12 Web Site (Not applicable to this project) _____________________________53
3.2 Joint Project Agreements _________________________________________53
3.3 Specifications Package Preparation _________________________________53
A-3
3.4 Contract Maintenance and Electronic Document Management System (EDMS)53
3.5 Value Engineering (Multi-Discipline Team) Review (Not applicable to this project) _______________________________________________________54
3.6 Prime Consultant Project Manager Meetings _________________________54
3.7 Plans Update __________________________________________________54
3.8 Post Design Services ____________________________________________54
3.9 Digital Delivery ________________________________________________54
3.10 Risk Assessment Workshop _______________________________________54
3.11 Railroad, Transit and/or Airport Coordination_________________________54
3.12 Other Project General Tasks (Not applicable to this project) _____________54
4 ROADWAY ANALYSIS ______________________________________________55
4.1 Typical Section Package _________________________________________55
4.2 Pavement Type Selection Report (Not applicable to this project) __________55
4.3 Pavement Design Package ________________________________________55
4.4 Cross-Slope Correction __________________________________________55
4.5 Horizontal/Vertical Master Design Files _____________________________55
4.6 Access Management (Not applicable to this project) ___________________55
4.7 Roundabout Evaluation (Not applicable to this project) _________________55
4.8 Roundabout Final Design Analysis (Not applicable to this project) ________55
4.9 Cross Section Design Files _______________________________________55
4.10 Traffic Control Analysis _________________________________________55
4.11 Master TCP Design Files _________________________________________56
4.12 Design Variations and Exceptions __________________________________56
4.13 Design Report _________________________________________________56
4.14 Quantities _____________________________________________________57
4.15 Cost Estimate __________________________________________________57
4.16 Technical Special Provisions (Not applicable to this project) _____________57
4.17 Other Roadway Analyses _________________________________________57
4.18 Field Reviews __________________________________________________57
4.19 Protection of Existing Structures ___________________________________57
4.20 Technical Meetings _____________________________________________57
4.21 Quality Assurance/Quality Control _________________________________57
4.22 Independent Peer Review (Not applicable to this project) ________________57
4.23 Supervision ____________________________________________________57
4.24 Coordination ___________________________________________________57
5 ROADWAY PLANS _________________________________________________58
5.1 Key Sheet _____________________________________________________58
5.2 Summary of Pay Items Including Quantity Input ______________________58
5.3 Typical Section Sheets ___________________________________________58
5.4 General Notes/Pay Item Notes _____________________________________58
5.5 Summary of Quantities Sheets _____________________________________58
5.6 Project Layout (Not applicable to this project) ________________________58
5.7 Plan/Profile Sheet (Not applicable to this project) ______________________58
5.8 Profile Sheet ___________________________________________________58
5.9 Plan Sheet _____________________________________________________58
A-4
5.10 Special Profile (Not applicable to this project) ________________________58
5.11 Back-of-Sidewalk Profile Sheet ____________________________________58
5.12 Interchange Layout Sheet (Not applicable to this project)________________58
5.13 Ramp Terminal Details (Plan View) (Not applicable to this project) _______58
5.14 Intersection Layout Details _______________________________________58
5.15 Special Details _________________________________________________58
5.16 Cross-Section Pattern Sheet(s) (Not applicable to this project) ____________58
5.17 Roadway Soil Survey Sheet(s) _____________________________________58
5.18 Cross Sections _________________________________________________58
5.19 Temporary Traffic Control Plan Sheets ______________________________58
5.20 Temporary Traffic Control Cross Section Sheets ______________________58
5.21 Temporary Traffic Control Detail Sheets ____________________________59
5.22 Utility Adjustment Sheets ________________________________________59
5.23 Selective Clearing and Grubbing Sheet(s) (Not applicable to this project) ___59
5.24 Project Network Control Sheet(s) __________________________________59
5.25 Environmental Detail Sheets (Not applicable to this project) _____________59
5.26 Utility Verification Sheet(s) (SUE Data) _____________________________59
5.27 Quality Assurance/Quality Control _________________________________59
5.28 Supervision ____________________________________________________59
6a DRAINAGE ANALYSIS ______________________________________________59 6a.1 Drainage Map Hydrology ________________________________________59 6a.2 Base Clearance Report (Not applicable to this project) __________________59 6a.3 Pond Siting Analysis and Report (Not applicable to this project) __________59 6a.4 Design of Cross Drains __________________________________________59 6a.5 Design of Ditches _______________________________________________60 6a.6 Design of Stormwater Management Facility (Offsite or Infield Pond) (Not applicable to this project) _________________________________________60 6a.7 Design of Stormwater Management Facility (Roadside Ditch as Linear Pond)
(Not applicable to this project) _____________________________________60 6a.8 Design of Floodplain Compensation (Not applicable to this project) _______60 6a.9 Design of Storm Drains __________________________________________60 6a.10 Optional Culvert Material ________________________________________60 6a.11 French Drain Systems ___________________________________________60 6a.12 Drainage Wells (Not applicable to this project) ________________________60 6a.13 Drainage Design Documentation Report _____________________________60 6a.14 Bridge Hydraulic Report (Not applicable to this project) ________________60 6a.15 Temporary Drainage Analysis _____________________________________60 6a.16 Cost Estimate __________________________________________________61 6a.17 Technical Special Provisions (Not applicable to this project) _____________61 6a.18 Other Drainage Analysis – Evaluate drainage at Car Cabana _____________61 6a.19 Field Reviews __________________________________________________61 6a.20 Technical Meetings _____________________________________________61 6a.21 Environmental Look-Around Meetings (Not applicable to this project) _____61 6a.22 Quality Assurance/Quality Control _________________________________61 6a.23 Independent Peer Review (Not applicable to this project) ________________61
A-5
6a.24 Supervision ____________________________________________________61 6a.25 Coordination ___________________________________________________61
6b DRAINAGE PLANS _________________________________________________61 6b.1 Drainage Map (Including Interchanges) (Not applicable to this project) ____61 6b.2 Bridge Hydraulics Recommendation Sheets (Not applicable to this project) _61 6b.3 Summary of Drainage Structures ___________________________________61 6b.4 Optional Pipe/Culvert Material ____________________________________61 6b.5 Drainage Structure Sheet(s) (Per Structure) ___________________________61 6b.6 Miscellaneous Drainage Detail Sheets (Not applicable to this project) ______61 6b.7 Lateral Ditch Plan/Profile (Not applicable to this project) _______________61 6b.8 Lateral Ditch Cross Sections (Not applicable to this project) _____________61 6b.9 Retention/Detention Pond Detail Sheet(s) (Not applicable to this project) ___61 6b.10 Retention Pond Cross Sections (Not applicable to this project) ___________61 6b.11 Erosion Control Plan Sheet(s) _____________________________________62 6b.12 SWPPP Sheet(s) ________________________________________________62 6b.13 Quality Assurance/Quality Control _________________________________62 6b.14 Supervision ____________________________________________________62
7 UTILITIES _________________________________________________________62
7.1 Utility Kickoff Meeting __________________________________________62
7.2 Identify Existing Utility Agency Owner(s) ___________________________62
7.3 Make Utility Contacts ___________________________________________62
7.4 Exception Processing ____________________________________________63
7.5 Preliminary Utility Meeting _______________________________________63
7.6 Individual/Field Meetings ________________________________________63
7.7 Collect and Review Plans and Data from UAO(s) ______________________63
7.8 Subordination of Easements Coordination ___________________________63
7.9 Utility Design Meeting ___________________________________________63
7.10 Review Utility Markups & Work Schedules and Processing of Schedules &
Agreements ___________________________________________________64
7.11 Utility Coordination/Follow-up ____________________________________64
7.12 Utility Constructability Review ____________________________________64
7.13 Additional Utility Services ________________________________________64
7.14 Processing Utility Work by Highway Contractor (UWHC) ______________64
7.15 Contract Plans to UAO(s) ________________________________________65
7.16 Certification/Close-Out __________________________________________65
7.17 Other Utilities __________________________________________________65
8 ENVIRONMENTAL PERMITS, COMPLIANCE AND CLEARANCES _____65
8.1 Preliminary Project Research ______________________________________65
8.2 Field Work ____________________________________________________66
8.3 Agency Verification of Wetland Data _______________________________67
8.4 Complete and Submit All Required Permit Applications ________________67
8.5 Prepare Dredge and Fill Sketches (as needed) _________________________67
8.6 Prepare USCG Permit (Not applicable for this project) __________________67
A-6
8.7 Prepare Water Management District Right of Way Occupancy Permit (Not applicable for this project) ________________________________________67
8.8 Prepare Coastal Construction Control Line (CCCL) Permit Application (Not applicable to this project) _________________________________________67
8.9 Prepare Tree Permit Information (Not applicable to this project) _________67
8.10 Mitigation Design (Not applicable to this project) _____________________67
8.11 Mitigation Coordination and Meetings (Not applicable to this project) _____67
8.12 Other Environmental Permits (Not applicable to this project)_____________67 Environmental Clearances, Reevaluations and Technical Support _______________67
8.13 Technical Support to the DEPARTMENT for Environmental Clearances and
Re-evaluations (Not applicable to this project) ________________________67 ����Preparation of Environmental Clearances and Reevaluations (Not applicable to this project)
8.15 Contamination Impact Analysis ____________________________________68
8.16 Asbestos Survey (Not applicable to this project) _______________________68
8.17 Technical Meetings _____________________________________________68
8.18 Quality Assurance/Quality Control _________________________________68
8.19 Supervision ____________________________________________________68
8.20 Coordination ___________________________________________________68
9 STRUCTURES - SUMMARY AND MISCELLANEOUS TASKS AND
DRAWINGS ________________________________________________________68
9.1 Key Sheet and Index of Drawings __________________________________69
9.2 Project Layout _________________________________________________69
9.3 General Notes and Bid Item Notes__________________________________69
9.4 Miscellaneous Common Details ___________________________________69
9.5 Incorporate Report of Core Borings _________________________________69
9.6 Existing Bridge Plans ____________________________________________69
9.7 Assemble Plan Summary Boxes and Quantities _______________________69
9.8 Cost Estimate __________________________________________________69
9.9 Technical Special Provisions ______________________________________69
9.10 Field Reviews __________________________________________________69
9.11 Technical Meetings _____________________________________________69
9.12 Quality Assurance/Quality Control _________________________________69
9.13 Independent Peer Review _________________________________________69
9.14 Supervision ____________________________________________________69
9.15 Coordination ___________________________________________________69
10 STRUCTURES - BRIDGE DEVELOPMENT REPORT and tasks 10.1 – 10.35 are not applicable for this project. ______________________________________69 General Requirements and tasks 10.1 – 10.3 are not applicable for this project. ____70
10.1 Bridge Geometry (Not applicable for this project) _____________________70
10.2 Ship Impact Data Collection (Not applicable for this project) ____________70
10.3 Ship Impact Criteria (Not applicable for this project) ___________________70 Superstructure Alternatives and tasks 10.4 – 10.7 are not applicable for this project. 70
10.4 Short Span Concrete (Not applicable for this project) ___________________70
10.5 Medium-Span Concrete (Not applicable for this project) ________________70
A-7
10.6 Long Span Concrete (Not applicable for this project) ___________________70
10.7 Structural Steel (Not applicable for this project) _______________________70 Foundation and Substructure Alternatives and tasks 10.8 – 10.10 are not applicable for this project. ____________________________________________________70
10.8 Pier/Bent (Not applicable for this project) ____________________________70
10.9 Shallow Foundations / GRS Abutments (Not applicable for this project) ____70
10.10 Deep Foundations (Not applicable for this project) _____________________70 Movable Span and tasks 10.11 – 10.23 are not applicable for this project. _________70
10.11 Data Collection and Design Criteria (Not applicable for this project) _______70
10.12 Movable Span Geometrics and Clearances (Not applicable for this project) _70
10.13 Deck System Evaluation (Not applicable for this project) ________________70
10.14 Framing Plan Development (Not applicable for this project) _____________70
10.15 Main Girder Preliminary Design (Not applicable for this project) _________70
10.16 Conceptual Span Balance/Counterweight (Not applicable for this project) __70
10.17 Support System Development (Not applicable for this project) ___________70
10.18 Drive Power Calculations (Not applicable for this project) _______________70
10.19 Drive System Development (Not applicable for this project) _____________70
10.20 Power and Control Development (Not applicable for this project) _________70
10.21 Conceptual Pier Design (Not applicable for this project) ________________71
10.22 Foundation Analysis (FL PIER) (Not applicable for this project) __________71
10.23 Tender Visibility Study (Not applicable for this project) ________________71 Other BDR Issues and tasks 10.24 – 10.30 are not applicable for this project. ______71
10.24 Aesthetics (Not applicable for this project) ___________________________71
10.25 TCP/Staged Construction Requirements (Not applicable for this project) ___71
10.26 Constructability Requirements (Not applicable for this project) ___________71
10.27 Load Rating for Damaged/Widened Structures (Not applicable for this project)71
10.28 Quantity and Cost Estimates (Not applicable for this project) ____________71
10.29 Quantity and Cost Estimates - Movable Span (Not applicable for this project)71
10.30 Wall Type Justification (Not applicable for this project) _________________71 Report Preparation and tasks 10.31 – 10.35 are not applicable for this project. _____71
10.31 Exhibits (Not applicable for this project) _____________________________71
10.32 Exhibits - Movable Span (Not applicable for this project) _______________71
10.33 Report Preparation (Not applicable for this project) ____________________71
10.34 Report Preparation - Movable Span (Not applicable for this project) _______71
10.35 BDR Submittal Package (Not applicable for this project) ________________71 Preliminary Plans (Not applicable for this project) ___________________________71
11 STRUCTURES - TEMPORARY BRIDGE and tasks 11.1 – 11.8 are not applicable for this project. _____________________________________________71 General Layout Design and Plans and tasks 11.1 – 11.3 are not applicable for this project. _______________________________________________________71
11.1 Overall Bridge Final Geometry (Not applicable for this project) __________71
11.2 General Plan and Elevation (Not applicable for this project) _____________71
11.3 Miscellaneous Details (Not applicable for this project) __________________71 End Bent Design and Plans and tasks 11.4 – 11.5 are not applicable for this project. 71
11.4 End Bent Structural Design (Not applicable for this project) _____________72
A-8
11.5 End Bent Details (Not applicable for this project) ______________________72 Intermediate Bent Design and Plans and tasks 11.6 – 11.7 are not applicable for this project. _______________________________________________________72
11.6 Intermediate Bent Structural Design (Not applicable for this project) ______72
11.7 Intermediate Bent Details (Not applicable for this project) _______________72 Miscellaneous Substructure Design and Plans and task 11.8 is not applicable for this project. _______________________________________________________72
11.8 Foundation Layout (Not applicable for this project) ____________________72
12 STRUCTURES - SHORT SPAN CONCRETE BRIDGE and tasks 12.1 – 12.28 are not applicable for this project. ______________________________________72 General Layout Design and Plans and tasks 12.1 – 12.6 are not applicable for this project. _______________________________________________________72
12.1 Overall Bridge Final Geometry (Not applicable for this project) __________72
12.2 Expansion/Contraction Analysis (Not applicable for this project) _________72
12.3 General Plan and Elevation (Not applicable for this project) _____________72
12.4 Construction Staging (Not applicable for this project) __________________72
12.5 Approach Slab Plan and Details (Not applicable for this project) __________72
12.6 Miscellaneous Details (Not applicable for this project) __________________72 End Bent Design and Plans and tasks 12.7 – 12.10 are not applicable for this project.72
12.7 End Bent Geometry (Not applicable for this project) ___________________72
12.8 End Bent Structural Design (Not applicable for this project) _____________72
12.9 End Bent Plan and Elevation (Not applicable for this project) ____________72
12.10 End Bent Details (Not applicable for this project) ______________________72 Intermediate Bent Design and Plans and tasks 12.11 – 12.15 are not applicable for this project. _______________________________________________________72
12.11 Bent Geometry (Not applicable for this project) _______________________72
12.12 Bent Stability Analysis (Not applicable for this project) _________________73
12.13 Bent Structural Design (Not applicable for this project) _________________73
12.14 Bent Plan and Elevation (Not applicable for this project) ________________73
12.15 Bent Details (Not applicable for this project) _________________________73 Miscellaneous Substructure Design and Plans and task 12.16 is not applicable for this project. _______________________________________________________73
12.16 Foundation Layout (Not applicable for this project) ____________________73 Superstructure Design and Plans and tasks 12.17 – 12.18 are not applicable for this project. _______________________________________________________73
12.17 Finish Grade Elevation Calculation (Not applicable for this project) _______73
12.18 Finish Grade Elevations (Not applicable for this project) ________________73 Cast-In-Place Slab Bridges and tasks 12.19 – 12.21 are not applicable for this project.73
12.19 Bridge Deck Design (Not applicable for this project) ___________________73
12.20 Superstructure Plan (Not applicable for this project) ____________________73
12.21 Superstructure Sections and Details (Not applicable for this project) _______73 Prestressed Slab Unit Bridges and tasks 12.22 – 12.26 are not applicable for this project. _______________________________________________________73
12.22 Prestressed Slab Unit Design (Not applicable for this project) ____________73
12.23 Prestressed Slab Unit Layout (Not applicable for this project) ____________73
A-9
12.24 Prestressed Slab Unit Details and Schedule (Not applicable for this project) _73
12.25 Deck Topping Reinforcing Layout (Not applicable for this project) ________73
12.26 Superstructure Sections and Details (Not applicable for this project) _______73 Reinforcing Bar Lists and task 12.27 is not applicable for this project. ___________73
12.27 Preparation of Reinforcing Bar List (Not applicable for this project) _______73 Load Rating and task 12.28 is not applicable for this project. ___________________73
12.28 Load Rating (Not applicable for this project) _________________________73
13 STRUCTURES - MEDIUM SPAN CONCRETE BRIDGE and tasks 13.1 – 13. 55 are not applicable for this project. ______________________________________74 General Layout Design and Plans and tasks 13.1 – 13.6 are not applicable for this project. _______________________________________________________74
13.1 Overall Bridge Final Geometry (Not applicable for this project) __________74
13.2 Expansion/Contraction Analysis (Not applicable for this project) _________74
13.3 General Plan and Elevation (Not applicable for this project) _____________74
13.4 Construction Staging (Not applicable for this project) __________________74
13.5 Approach Slab Plan and Details (Not applicable for this project) __________74
13.6 Miscellaneous Details (Not applicable for this project) __________________74 End Bent Design and Plans and tasks 13.7 – 13.11 are not applicable for this project.74
13.7 End Bent Geometry (Not applicable for this project) ___________________74
13.8 Wingwall Design and Geometry (Not applicable for this project) _________74
13.9 End Bent Structural Design (Not applicable for this project) _____________74
13.10 End Bent Plan and Elevation (Not applicable for this project) ____________74
13.11 End Bent Details (Not applicable for this project) ______________________74 Intermediate Bent Design and Plans and tasks 13.12 – 13.16 are not applicable for this project. _______________________________________________________74
13.12 Bent Geometry (Not applicable for this project) _______________________74
13.13 Bent Stability Analysis (Not applicable for this project) _________________74
13.14 Bent Structural Design (Not applicable for this project) _________________74
13.15 Bent Plan and Elevation (Not applicable for this project) ________________74
13.16 Bent Details (Not applicable for this project) _________________________74 Pier Design and Plans and tasks 13.17 – 13.21 are not applicable for this project. ___74
13.17 Pier Geometry (Not applicable for this project) ________________________74
13.18 Pier Stability Analysis (Not applicable for this project) _________________74
13.19 Pier Structural Design (Not applicable for this project)__________________75
13.20 Pier Plan and Elevation (Not applicable for this project) ________________75
13.21 Pier Details (Not applicable for this project) __________________________75 Miscellaneous Substructure Design and Plans and task 13.22 are not applicable for this project. _______________________________________________________75
13.22 Foundation Layout (Not applicable for this project) ____________________75 Superstructure Deck Design and Plans and tasks 13.23 – 13.30 are not applicable for this project. ____________________________________________________75
13.23 Finish Grade Elevation (FGE) Calculation (Not applicable for this project) _75
13.24 Finish Grade Elevations (Not applicable for this project) ________________75
13.25 Bridge Deck Design (Not applicable for this project) ___________________75
A-10
13.26 Bridge Deck Reinforcing and Concrete Quantities (Not applicable for this project) _______________________________________________________75
13.27 Diaphragm Design/Jacking Loads (Not applicable for this project) ________75
13.28 Superstructure Plan (Not applicable for this project) ____________________75
13.29 Superstructure Section (Not applicable for this project) _________________75
13.30 Miscellaneous Superstructure Details (Not applicable for this project) _____75 Reinforcing Bar Lists and task 13.31 is not applicable for this project. ___________75
13.31 Preparation of Reinforcing Bar List (Not applicable for this project) _______75 Continuous Concrete Girder Design and tasks 13.32 – 13.48 are not applicable for this project. _______________________________________________________75
13.32 Section Properties (Not applicable for this project) _____________________75
13.33 Material Properties (Not applicable for this project) ____________________75
13.34 Construction Sequence (Not applicable for this project) _________________75
13.35 Tendon Layouts (Not applicable for this project) ______________________75
13.36 Live Load Analysis (Not applicable for this project) ____________________75
13.37 Temperature Gradient (Not applicable for this project) __________________75
13.38 Time Dependent Analysis (Not applicable for this project) ______________76
13.39 Stress Summary (Not applicable for this project) ______________________76
13.40 Ultimate Moments (Not applicable for this project) ____________________76
13.41 Ultimate Shear (Not applicable for this project) _______________________76
13.42 Construction Loading (Not applicable for this project) __________________76
13.43 Framing Plan (Not applicable for this project) ________________________76
13.44 Girder Elevation, including Grouting Plan and Vent Locations (Not applicable for this project) _________________________________________________76
13.45 Girder Details (Not applicable for this project) ________________________76
13.46 Erection Sequence (Not applicable for this project) ____________________76
13.47 Splice Details (Not applicable for this project) ________________________76
13.48 Girder Deflections and Camber (Not applicable for this project) __________76 Simple Span Concrete Design and tasks 13.49 – 13.51 are not applicable for this project. _______________________________________________________76
13.49 Prestressed Beam (Not applicable for this project) _____________________76
13.50 Prestressed Beam Schedules (Not applicable for this project)_____________76
13.51 Framing Plan (Not applicable for this project) ________________________76 Beam Stability and task 13.52 is not applicable for this project. _________________76
13.52 Beam/Girder Stability (Not applicable for this project) __________________76 Bearing and tasks 13.53 – 13.54 are not applicable for this project. ______________76
13.53 Bearing Pad and Bearing Plate Design (Not applicable for this project) _____76
13.54 Bearing Pad and Bearing Plate Details (Not applicable for this project) _____76 Load Rating and task 13.55 is not applicable for this project. ___________________76
13.55 Load Ratings (Not applicable for this project) _________________________76
14 STRUCTURES - STRUCTURAL STEEL BRIDGE and tasks 14.1 – 14. 60 are not applicable for this project. _________________________________________77 General Layout Design and Plans and tasks 14.1 – 14.6 are not applicable for this project. _______________________________________________________77
14.1 Overall Bridge Final Geometry (Not applicable for this project) __________77
A-11
14.2 Expansion/Contraction Analysis (Not applicable for this project) _________77
14.3 General Plan and Elevation (Not applicable for this project) _____________77
14.4 Construction Staging (Not applicable for this project) __________________77
14.5 Approach Slab Plan and Details (Not applicable for this project) __________77
14.6 Miscellaneous Details (Not applicable for this project) __________________77 End Bent Design and Plans and tasks 14.7 – 14.11 are not applicable for this project.77
14.7 End Bent Geometry (Not applicable for this project) ___________________77
14.8 Wingwall Design and Geometry (Not applicable for this project) _________77
14.9 End Bent Structural Design (Not applicable for this project) _____________77
14.10 End Bent Plan and Elevation (Not applicable for this project) ____________77
14.11 End Bent Details (Not applicable for this project) ______________________77 Intermediate Bent Design and Plans and tasks 14.12 – 14.16 are not applicable for this project. _______________________________________________________77
14.12 Bent Geometry (Not applicable for this project) _______________________77
14.13 Bent Stability Analysis (Not applicable for this project) _________________77
14.14 Bent Structural Design (Not applicable for this project) _________________77
14.15 Bent Plan and Elevation (Not applicable for this project) ________________77
14.16 Bent Details (Not applicable for this project) _________________________77 Pier Design and Plans and tasks 14.17 – 14.21 are not applicable for this project. ___77
14.17 Pier Geometry (Not applicable for this project) ________________________77
14.18 Pier Stability Analysis (Not applicable for this project) _________________77
14.19 Pier Structural Design (Not applicable for this project)__________________78
14.20 Pier Plan and Elevation (Not applicable for this project) ________________78
14.21 Pier Details (Not applicable for this project) __________________________78 Miscellaneous Substructure Design and Plans and task 14.22 are not applicable for this project. _______________________________________________________78
14.22 Foundation Layout (Not applicable for this project) ____________________78 Superstructure Deck Design and Plans and tasks 14.23 – 14.29 are not applicable for this project. ____________________________________________________78
14.23 Finish Grade Elevation (FGE) Calculation (Not applicable for this project) _78
14.24 Finish Grade Elevations (Not applicable for this project) ________________78
14.25 Bridge Deck Design (Not applicable for this project) ___________________78
14.26 Bridge Deck Reinforcing and Concrete Quantities (Not applicable for this project) _______________________________________________________78
14.27 Superstructure Plan (Not applicable for this project) ____________________78
14.28 Superstructure Section (Not applicable for this project) _________________78
14.29 Miscellaneous Bridge Deck Details (Not applicable for this project) _______78 Reinforcing Bar Lists and task 14.30 are not applicable for this project. __________78
14.30 Preparation of Reinforcing Bar List (Not applicable for this project) _______78 Structural Steel Plate Girder Design and tasks 14.31 – 14.44 are not applicable for this project. _______________________________________________________78
14.31 Unit Modeling (Not applicable for this project) _______________________78
14.32 Section Design (Not applicable for this project) _______________________78
14.33 Stiffener Design and Locations (Not applicable for this project) __________78
14.34 Cross-frame Design (Not applicable for this project) ___________________78
14.35 Connections (Not applicable for this project) _________________________78
A-12
14.36 Bearing Assembly Design and Detailing (With Jacking Analysis) (Not applicable for this project) ________________________________________78
14.37 Splice Design (Not applicable for this project) ________________________78
14.38 Shear Stud Connectors (Not applicable for this project) _________________79
14.39 Deflection Analysis (Not applicable for this project) ___________________79
14.40 Framing Plan (Not applicable for this project) ________________________79
14.41 Girder Elevation (Not applicable for this project) ______________________79
14.42 Structural Steel Details (Not applicable for this project) _________________79
14.43 Splice Details (Not applicable for this project) ________________________79
14.44 Girder Deflections and Camber (Not applicable for this project) __________79 Structural Steel Box Girder Design and tasks 14.45 – 14.59 are not applicable for this project. _______________________________________________________79
14.45 Unit Modeling (Not applicable for this project) _______________________79
14.46 Section Design (Not applicable for this project) _______________________79
14.47 Stiffener Design and Locations (Not applicable for this project) __________79
14.48 Interior Cross-Frame Design (Not applicable for this project) ____________79
14.49 Exterior Cross-Frame Design (Not applicable for this project) ____________79
14.50 Connections (Not applicable for this project) _________________________79
14.51 Bearing Assembly Design and Detailing (with Jacking Analysis) (Not applicable for this project) ________________________________________79
14.52 Splice Design (Not applicable for this project) ________________________79
14.53 Shear Stud Connectors (Not applicable for this project) _________________79
14.54 Deflection Analysis (Not applicable for this project) ___________________79
14.55 Framing Plan (Not applicable for this project) ________________________79
14.56 Girder Elevation (Not applicable for this project) ______________________79
14.57 Structural Steel Details (Not applicable for this project) _________________79
14.58 Splice Details (Not applicable for this project) ________________________79
14.59 Girder Deflections and Camber (Not applicable for this project) __________79 Erection Scheme and tasks 14.60 – 14.61 are not applicable for this project. _______79
14.60 Erection Scheme Analysis (Not applicable for this project) ______________80
14.61 Erection Scheme (Not applicable for this project) ______________________80 Load Rating and task 14.62 are not applicable for this project. __________________80
14.62 Load Rating (Not applicable for this project) _________________________80
15 STRUCTURES - SEGMENTAL CONCRETE BRIDGE and tasks 15.1 – 15.77 are not applicable for this project. ______________________________________80 General Layout Design and Plans and tasks 15.1 – 15.9 are not applicable for this project. _______________________________________________________80
15.1 Final Bridge Geometry (Not applicable for this project) _________________80
15.2 Casting Geometry Calculation (Not applicable for this project) ___________80
15.3 Finish Grade Geometry Calculation (Not applicable for this project) _______80
15.4 Finish Grade Elevations (Not applicable for this project) ________________80
15.5 Construction Schedule (Not applicable for this project) _________________80
15.6 General Plan and Elevation (Not applicable for this project) _____________80
15.7 Approach Slab Plan and Details (Not applicable for this project) __________80
15.8 Miscellaneous Details (Not applicable for this project) __________________80
A-13
15.9 Existing Bridge Plans (Not applicable for this project) __________________80 End Bent Design and Plans and tasks 15.10 – 15.14 are not applicable for this project.80
15.10 End Bent Geometry (Not applicable for this project) ___________________80
15.11 Wingwall Geometry and Design (Not applicable for this project) _________80
15.12 End Bent Structural Design (Not applicable for this project) _____________80
15.13 End Bent Plan and Elevation (Not applicable for this project) ____________80
15.14 End Bent Details (Not applicable for this project) ______________________80 Pier Design and Plans and tasks 15.15 – 15.20 are not applicable for this project. ___80
15.15 Pier Geometry (Not applicable for this project) ________________________80
15.16 Pier Stability Analysis (Not applicable for this project) _________________80
15.17 Pier Construction Loads (Not applicable for this project) ________________81
15.18 Pier Structural Design (Not applicable for this project)__________________81
15.19 Pier Plan and Elevation (Not applicable for this project) ________________81
15.20 Pier Details (Not applicable for this project) __________________________81 Miscellaneous Substructure Design and Plans and task 15.21 are not applicable for this project. _______________________________________________________81
15.21 Foundation Layout (Not applicable for this project) ____________________81 Longitudinal Analysis and tasks 15.22 – 15.33 are not applicable for this project. __81
15.22 Section Properties (Not applicable for this project) _____________________81
15.23 Material Properties (Not applicable for this project) ____________________81
15.24 Superimposed Dead Loads (Not applicable for this project) ______________81
15.25 Construction Sequence (Not applicable for this project) _________________81
15.26 Tendon Layouts (Not applicable for this project) ______________________81
15.27 Live Load Analysis (Not applicable for this project) ____________________81
15.28 Temperature Gradient (Not applicable for this project) __________________81
15.29 Time Dependent Analysis (Not applicable for this project) ______________81
15.30 Stress Summary (Not applicable for this project) ______________________81
15.31 Ultimate Moments (Not applicable for this project) ____________________81
15.32 Ultimate Shear (Not applicable for this project) _______________________81
15.33 Construction Loading (Not applicable for this project) __________________81 Transverse Analysis and tasks 15.34 – 15.39 are not applicable for this project. ____81
15.34 Time Dependent Analysis (Not applicable for this project) ______________81
15.35 Live Load Analysis (Not applicable for this project) ____________________81
15.36 Temperature Gradient (Not applicable for this project) __________________81
15.37 Stress Summary (Not applicable for this project) ______________________81
15.38 Ultimate Moments (Not applicable for this project) ____________________81
15.39 Construction Loading (Not applicable for this project) __________________82 Superstructure Design and tasks 15.40 – 15.47 are not applicable for this project. __82
15.40 Typical Segment (Not applicable for this project) ______________________82
15.41 Pier Segment (Not applicable for this project) _________________________82
15.42 Expansion Joint Segment (Not applicable for this project) _______________82
15.43 Blister Details (Not applicable for this project) ________________________82
15.44 Deviator Blocks (Not applicable for this project) ______________________82
15.45 Bearings (Not applicable for this project) ____________________________82
15.46 Expansion Joints (Not applicable for this project) ______________________82
15.47 Special Analysis (Not applicable for this project) ______________________82
A-14
Superstructure Plans and tasks 15.48 – 15.57 are not applicable for this project. ____82
15.48 Typical Sections (Not applicable for this project) ______________________82
15.49 Finish Grade Elevations (Not applicable for this project) ________________82
15.50 Segment Layout / Designations (Not applicable for this project) __________82
15.51 Typical Segments (Not applicable for this project) _____________________82
15.52 Variable Depth Segments (Not applicable for this project) _______________82
15.53 Pier Segments (Not applicable for this project) ________________________82
15.54 Expansion Joint Segments (Not applicable for this project) ______________82
15.55 CIP Closure Joint Details (Not applicable for this project) _______________82
15.56 Casting Geometry (Not applicable for this project) _____________________82
15.57 Integrated 3-D Drawings (Not applicable for this project) _______________82 Post-Tensioning Details and tasks 15.58 – 15.66 are not applicable for this project. _82
15.58 Bulkhead Details (Not applicable for this project) _____________________82
15.59 Transverse Tendon Layout (Not applicable for this project) ______________82
15.60 Longitudinal Tendon Layout (Not applicable for this project) ____________82
15.61 Temporary Post-Tensioning (Not applicable for this project) _____________83
15.62 Quantities and Stressing Schedule (Not applicable for this project) ________83
15.63 Future Post-Tensioning (Not applicable for this project) ________________83
15.64 Anchorage Blisters (Not applicable for this project) ____________________83
15.65 Deviation Blocks (Not applicable for this project) _____________________83
15.66 PT Grouting Plan Details (Not applicable for this project) _______________83 Miscellaneous Details and tasks 15.67 – 15.75 are not applicable for this project. ___83
15.67 Erection Sequence and Details (Not applicable for this project) ___________83
15.68 Access Opening Details (Not applicable for this project) ________________83
15.69 Bearings (Not applicable for this project) ____________________________83
15.70 Expansion Joints (Not applicable for this project) ______________________83
15.71 Vermin Screen Details (Not applicable for this project) _________________83
15.72 Railing Details (Not applicable for this project) _______________________83
15.73 Lighting and Luminaries (Not applicable for this project) _______________83
15.74 Architectural Details (Not applicable for this project) ___________________83
15.75 Special Systems (Not applicable for this project) ______________________83 Reinforcing Bar Lists and task 15.76 are not applicable for this project. __________83
15.76 Preparation of Reinforcing Bar Lists (Not applicable for this project) ______83 Load Rating and task 15.77 are not applicable for this project. __________________83
15.77 Load Rating (LRFR) (Not applicable for this project)___________________83
16 STRUCTURES - MOVABLE SPAN and tasks 16.1 – 16.102 are not applicable for this project. ______________________________________________________83 Final Design Bascule Pier and tasks 16.1- 16.9 are not applicable for this project. __83
16.1 Pier Deck (Not applicable for this project) ___________________________83
16.2 Leaf/Pier Clearance Diagrams (Not applicable for this project) ___________83
16.3 Load Shoe Columns (Not applicable for this project) ___________________84
16.4 Trunnion Columns (Not applicable for this project) ____________________84
16.5 Foundations (Not applicable for this project) _________________________84
16.6 Footing (Not applicable for this project) _____________________________84
16.7 Seal (Not applicable for this project) ________________________________84
A-15
16.8 Back Wall (Approach Span Bearings) Closed Piers only (Not applicable for this project) ___________________________________________________84
16.9 Bascule Pier Deck Elevations (Not applicable for this project) ____________84 Bascule Pier Dimensions - Detailing and tasks 16.10- 16.12 are not applicable for this project. _______________________________________________________84
16.10 Pier Plan Views (Not applicable for this project) ______________________84
16.11 Pier Elevations Views (Not applicable for this project) __________________84
16.12 Pier Sections (Not applicable for this project) _________________________84 Bascule Pier Reinforcing Details and task 16.13 are not applicable for this project. _84
16.13 Pier Reinforcing (Not applicable for this project) ______________________84 Bascule Pier Miscellaneous Details and tasks 16.14 – 16.20 are not applicable for this project. _______________________________________________________84
16.14 Pier Barrier Details (Not applicable for this project) ____________________84
16.15 Stair Details (Not applicable for this project) _________________________84
16.16 Handrail Details (Not applicable for this project) ______________________84
16.17 Ladder and Hatch Details (Not applicable for this project) _______________84
16.18 Pier Equipment (Not applicable for this project) _______________________84
16.19 Bascule Pier Notes and Summary of Quantities (Not applicable for this project)84
16.20 Miscellaneous Details (Not applicable for this project) __________________84 Bascule Leaf Design and tasks 16.21 – 16.38 are not applicable for this project. ____84
16.21 Deck Design (Not applicable for this project) _________________________84
16.22 Sidewalk Design (Not applicable for this project) ______________________85
16.23 Stringer Design (Not applicable for this project) _______________________85
16.24 Typical Floorbeam Design (Not applicable for this project) ______________85
16.25 End Floorbeam Design (Not applicable for this project) _________________85
16.26 Deep Floorbeam Design (Not applicable for this project) ________________85
16.27 Sidewalk Bracket Design (Not applicable for this project) _______________85
16.28 Roadway Bracket Design (Not applicable for this project) _______________85
16.29 Main Girder Influence Lines (Not applicable for this project) ____________85
16.30 Main Girder Design (Not applicable for this project) ___________________85
16.31 Trunnion Girder Design (Not applicable for this project) ________________85
16.32 Main Girder Camber Data (Not applicable for this project) ______________85
16.33 Leaf Lateral Bracing Design (Not applicable for this project) ____________85
16.34 Counterweight Design (Not applicable for this project) _________________85
16.35 Live Load Shoe Design (Not applicable for this project) ________________85
16.36 Barrier Design (Not applicable for this project) _______________________85
16.37 Deck Elevations (Not applicable for this project) ______________________85
16.38 Balance Calculations (Not applicable for this project) __________________85 Bascule Leaf Detailing and tasks 16.39 – 16.59 are not applicable for this project. __85
16.39 Bascule GP&E (Not applicable for this project) _______________________85
16.40 Bascule Leaf Notes (Not applicable for this project) ____________________85
16.41 Framing Plan (Not applicable for this project) ________________________85
16.42 Flooring Plan and Details (Not applicable for this project) _______________85
16.43 Typical Section and Finish Grade Elevations (Not applicable for this project)85
16.44 Girder Elevation (Not applicable for this project) ______________________85
16.45 Girder Details (Not applicable for this project) ________________________85
A-16
16.46 Camber Layout (Not applicable for this project) _______________________86
16.47 Floor Beams (Not applicable for this project) _________________________86
16.48 Counterweight Girder/Box (Not applicable for this project) ______________86
16.49 Trunnion Girder (Not applicable for this project) ______________________86
16.50 Cylinder Girder (Not applicable for this project) _______________________86
16.51 Lateral Bracing Details (Not applicable for this project) _________________86
16.52 Counterweight Bracing Details (Not applicable for this project) __________86
16.53 Joint Details (Not applicable for this project)…