CN-550000-C9N16-S0010000.pdf

PDF 3 MB Posted

Attached to
Master Agreement FL|C9N16|0aa77fa3369b5a36b1c345ecefb6df51
Contract number
C9N16
Issued by
Florida

About this file

This document is an Amendment (Amendment No. 3) to a Standard Professional Services Agreement between the State of Florida Department of Transportation and DRMP, Inc., with additional involvement from EPG Engineering and Landmark Engineering Inc. The original contract (C-9N16) was executed on December 21, 2015, and this amendment is dated June 20, 2017. The agreement pertains to an Interchange Lighting Bundle project on Interstate 95 (SR 9) from Mile Marker 32.073 to 11.790, spanning Volusia and Flagler Counties.

The amendment provides for Post Design Services related to the interchange lighting project, with a maximum limiting amount of $1,887,071.00. The services include construction assistance, such as attending a preconstruction conference, responding to approximately eleven requests for information (RFIs) across roadway, lighting, signing, and structural disciplines, conducting four field visits, and reviewing up to 42 shop drawings. The contract extends the project completion date to December 19, 2019. Compensation will be calculated based on direct labor rates, with provisions for overhead, facilities capital cost of money, and other associated expenses, following federal acquisition regulations and state law guidelines.

View the file

Other files

File Type Posted
CN-550000-C9N16-00030000.pdf PDF
CN-550000-C9N16-00020000.pdf PDF
ContractBudgetExport.csv CSV file
CN-550000-C9N16.pdf PDF
ContractDeliverablesExport.csv CSV file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ܱ½«Í·¹² Û²ª»´±°» ×Üæ ÝèÛççèÜîóðéîêóìÝíÝóèÝçÝóßðïÚÝßïÝëÝëë

The Consultant will attend a Preconstruction conference.

The Consultant will answer an anticipated eleven

(11) requests for information (RFIs) during the course of construction.

DRMP RFIs- 1 roadway, 7 lighting and 2 signing EPG RFIs – 1 lighting electrical/load center Landmark RFIs – 2 structural

. The Consultant will attend four (4) field visits for construction support.

DRMP Field Visits - 1 roadway, 1 lighting and 1 signing Landmark Field Visits – 1 structures

Consultant will perform one (1) review of up to forty-two (42) shop drawings.

DRMP shop drawings - 18 lighting and 14 signing EPG shop drawings - 5 lighting electrical/load centers Landmark shop drawings – 5 total (1 high mast poles, 1 conventional poles, 1 pendant hung, 1 foundations and 1 custom double-arm pole)

The Consultant will provide up to 5 plan updates.

DRMP plan updates – 2 lighting, 1 signing and 1 roadway Landmark plan updates - 1 structures

Ü ½ Í

·¹ ² Û

² ª»

Ü æ

Ý è Û ç ç è Ü î óð é î ê óì

Ý í Ý óè Ý ç Ý óß ð ï

Ú Ý ß ï

Ý ë Ý ë ë

File details come from the government source that posted it. Updated .