CN-550000-C9N16-00030000.pdf

PDF 201 KB Posted

Attached to
Master Agreement FL|C9N16|0aa77fa3369b5a36b1c345ecefb6df51
Contract number
C9N16
Issued by
Florida

About this file

This document is an Amendment to a Standard Professional Services Agreement between the State of Florida Department of Transportation (FDOT) and DRMP, Inc., specifically Amendment No. 2 to the original contract C-9N16, which was initially executed on December 21, 2015. The amendment involves multiple sub-consultants including Brindley Pieters & Associates, Inc., EPG Engineering, Landmark Engineering, Inc., AWK Consulting Engineers, Geotechnical and Environmental Consultants, Inc., and Amdrill, Inc.

The amendment pertains to Interchange Lighting Bundle I-95 (SR 9) Lighting services for Financial Project Numbers 435056-1-32-01 and 435059-1-32-01. While no additional funds are being added, $82,967.00 is being redistributed among the project participants. The total maximum limiting amount remains unchanged at $1,861,952.00. The amendment involves adjustments to basic design services, authorized and supplemental design and right-of-way survey support, and geotechnical services, with modifications to compensation for various subconsultants while maintaining the overall contract structure and total funding level.

View the file

Other files

File Type Posted
CN-550000-C9N16-S0010000.pdf PDF
CN-550000-C9N16-00020000.pdf PDF
ContractBudgetExport.csv CSV file
CN-550000-C9N16.pdf PDF
ContractDeliverablesExport.csv CSV file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

State of Florida Department of Transportation

AMENDMENT

TO

STANDARD PROFESSIONAL SERVICES AGREEMENT

Amendment No.: 2 Execution Date:

Original Contract No.: C-9N16 Original Execution Date: December 21, 2015

Consultant Name: DRMP, Inc.

Agreement Description: Interchange Lighting Bundle I-95 (SR 9) Lighting

Purpose of Amendment: Add Services; Reallocate Funds

The terms if the agreement, referenced above, are hereby amended as follows:

The Consultant will provide services for Financial Project Number 435056-1-32-01 & 435059-1-32-01 as described in the attached Exhibit “A”, Scope of Services. No additional funds will be added. Funds in the amount of $82,967.00 will be redistributed as shown on Attachment No. 1, Summary of Compensation of this Amendment No. 2. The total maximum limiting amount of 1,861,952.00 remains unchanged. Payment will be in accordance with the established method of compensation as amended.

Except as hereby modified, amended or changed, all of the terms and conditions of said original agreement and any amendments thereto will remain in full force and effect.

The following attachments are hereby incorporated into this amendment:

Exhibit “A”, Scope of Services, Pages A-1 to A-11 Attachment No. 1, Summary of Compensation

DRMP, INC.

STATE OF FLORIDA

DEPARTMENT OF TRANSPORTATION

BY: BY:

Authorized Signature Authorized Signature

Name: Name: Richard B. Morrow, P.E.

Title: Title: Director of Transportation Development

District 5

PROCUREMENT SERVICES REVIEW: LEGAL REVIEW:

Michelle Sloan District Counsel Procurement Services Manager District Five

DocuSign Envelope ID: 0532D18A-EA0A-45F1-B535-A823C58DD21D

Consultant Project Manager

James W Highland Colette Moss

Vice President - Colette Moss

May 8, 2017

Financial Project Numbers: 435056‐1‐32‐01 435059‐1‐32‐01 435056‐1‐32‐01 435059‐1‐32‐01 435056‐1‐32‐01 435059‐1‐32‐01

DESIGN SERVICES

LUMP SUM

Basic Services: (LS‐2) DRMP, Inc. (Prime) 510,172$ 514,262$ 0 0 510,172$ 514,262$ Brindley Pieters & Associates, inc. (sub) 19,122$ 18,148$ 0 0 19,122$ 18,148$ EPG Engineering (sub) 35,744$ 35,657$ 0 0 35,744$ 35,657$ Landmark Engineering, Inc. (sub) 30,376$ 33,472$ 0 0 30,376$ 33,472$

Total Lump Sum Amount 595,414$ 601,539$ 0 0 595,414$ 601,539$

LIMITING AMOUNTS (LA‐4)

Authorized‐Design & R/W Survey(field & office support) (LA‐4) DRMP, Inc. (Prime) 214,952$ 300,649$ 0 0 214,952$ 300,649$ Supplemental‐Design & R/W Survey(field & Office support) (LA‐4) DRMP, Inc. (Prime) 5,550$ 5,822$ 32,655$ 50,312$ 38,205$ 56,134$ Geotechnical Services (LA‐4) AWK Consulting Engineers, (sub) 35,045$ 25,054$ ($24,141) ($8,585) 10,904$ 16,469$ Geotechnical and Enviromental Consultants, Inc. 23,990$ 32,113$ ($5,000) ($28,623) 18,990$ 3,490$ Amdrill, Inc. 8,720$ 13,104$ ($3,514) ($13,104) 5,206$ 0

Total Limiting Amount 288,257$ 376,742$ 0 0 288,257$ 376,742$

CONTRACT TOTALS

TOTAL MAXIMUM LIMITING AMOUNT 883,671$ 978,281$ 0 0 883,671$ 978,281$

CONTRACT TOTAL: 1,861,952$

REVISED CONTRACT

TOTALS

ORIGINAL AND PREVIOUS

AMENDED TOTALS

THIS

AMENDMENT

No. 2

C‐9N16 Attachment No. 1, Summary of Compensation

DocuSign Envelope ID: 0532D18A-EA0A-45F1-B535-A823C58DD21D

C9N16 - AM2 Executed
Copy of Amendment 2 Fee Sheet revised

File details come from the government source that posted it. Updated .