CN-550000-C9K56-00040000.pdf
PDF 104 KB Posted
- Contract number
- C9K56
- Issued by
- Florida
About this file
This document is an Amendment to a Standard Professional Services Agreement from the State of Florida Department of Transportation, specifically Amendment No. 1 to Original Contract No. C-9K56. The amendment involves WBQ Design & Engineering, Inc. as the primary consultant, with several subconsultants including DRMP, Inc., Litigation Engineering Associates, Inc., Quest Corporation of America, Inc., Vanasse Hangen Brustlin, Inc., Southeastern Archaeological Research, Inc., and Aerial Cartographics of America, Inc.
The contract pertains to the South Pomegranate Avenue Improvements project from West 8th Street to S.R. 46, with a total maximum contract amount of $2,276,762.00. The contract covers various professional services including Basic Services, Right of Way Control and Maps, Geotechnical Services, Environmental Services, Design and Right of Way Survey Services, Supplemental Design Services, Legal Descriptions, and Supplemental Mapping Services. The lump sum amounts are broken down by service type and consultant, with WBQ Design Engineering, Inc. serving as the prime contractor and receiving the majority of the contract value. The amendment specifically corrects the compensation element of the original agreement, effective August 3, 2015.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-550000-C9K56-00010000.pdf.crdownload | CRDOWNLOAD file | |
| CN-550000-C9K56-00050000.pdf | ||
| CN-550000-BD630-L0070000.pdf | ||
| CN-550000-C9K56-00030000.pdf | ||
| CN-550000-C9K56-00070000.pdf | ||
| CN-550000-C9K56.pdf | ||
| CN-550000-C9K56-00010000.pdf | ||
| CN-550000-C9K56-00020000.pdf | ||
| CN-550000-C9K56-00060000.pdf | ||
| CN-550000-C9K56-00080000.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .